Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Repairs on leaking valve were done in roadway 11x9 Date: March 16, 2012 Contractor: Dcwater Ops Permit type: Excavation; valves (excavation) | Permit status: Denied | Expiration date: September 15, 2012 | |||||
The proposed work consist on drilling two test soil borings. The soil borings diameter will be eight inches and the depth will be twenty-feet. The drilling methods using hollow stem auger split spoon samples of the soil will be obtained continuously at two feet intervals. Borehole will be back-filled with a 60: bentonite cement mix upon completion of sampling, as per site plan, work plans report, dc well construction application and dc well schematic form. Work will be performed in-between p street nw and wisconsin avenue nw in existing alley, for district of columbia-water and sewer authority. Date: November 1, 2013 Permit type: Excavation; boring test pit (single) | Permit status: Permit expired | Expiration date: March 13, 2014 | Permit id: Pa88562 | |||||
SCORE 100 Repairs on leaking valve were done in roadway 11x9 Date: March 16, 2012 Contractor: Dcwater Permit type: Excavation; valves (excavation) | Permit status: Denied | Expiration date: September 15, 2012 | |||||
SCORE 100 Excavation; valves (excavation) Contractor: Dcwater Permit status: 2 | Expiration date: September 15, 2012 | Permit id: 0 | |||||
SCORE 100 Repairs on leaking valve were done in roadway 11x9 Contractor: Dcwater Ops Permit status: Denied | Expiration date: September 15, 2012 | Permit id: 0 | |||||
SCORE 100 Excavation; valves (excavation) Contractor: Dcwater Permit status: 2 | Expiration date: September 15, 2012 | Permit id: 0 | |||||
SCORE 100 Repairs on leaking valve were done in roadway 11x9 Contractor: Dcwater Ops Permit status: Denied | Expiration date: September 15, 2012 | Permit id: 0 | |||||
SCORE 89 The proposed work consist on drilling two test soil borings. The soil borings diameter will be eight inches and the depth will be twenty-feet. The drilling methods using hollow stem auger split spoon samples of the soil will be obtained continuously at two feet intervals. Borehole will be back-filled with a 60: bentonite cement mix upon completion of sampling, as per site plan, work plans report, dc well construction application and dc well schematic form. Work will be performed in-between p street nw and wisconsin avenue nw in existing alley, for district of columbia-water and sewer authority. Date: November 1, 2013 Contractor: Findling, Inc. Findling, Inc Client: District Of Columbia Water & Sewer A. District Of Columbia Water & Sewer A. | Permit type: Excavation; boring test pit (single) | Permit status: Permit expired | Expiration date: March 13, 2014 | Permit id: Pa88562 |