The division e - m street diversion sewer project is intended to address consent decree requirements to control overflows from cso 015 and to consolidate csos 016 and 017. Overflows will be intercepted at the existing combined sewers by constructing diversion chambers and diverted flows will be conveyed to the anacostia river tunnel (art) by a series of diversion sewers constructed along m street se. Diversion chambers will be constructed along m street se to intercept csos 015, 016 and 017 at 9th, 12th and 14th streets se, respectively. A 48?? Diameter diversion sewer will convey flow from cso 015 to cso 016, and a 108?? Diversion sewer will convey flow from cso 016 to cso 017. Downstream od cso 017 a 7. 5x15 concrete box "culvert" will be installed alonf m st up to other side of water st. The combined flow diverted from csos 015, 016 and 017 will be delivered to the art via a vortex drop and deaeration facility to be constructed near the intersection of m and water streets se. The vort Client: Dc Water And Sewer Authority | Permit type: Paving; curb & gutte | Permit id: Pa62436-R3 | |||||
The division e - m street diversion sewer project is intended to address consent decree requirements to control overflows from cso 015 and to consolidate csos 016 and 017. The excavation elements of this project are contained in application # 62436. Due to the necessary access pits and associated construction work and staging areas, some portions of existing road, medians, curbs, sidewalk and trees needs to be impacted and restored at the completion of work. This project will require 3 staging areas, one between m st, 9th st and potomac ave, one located north of m st , east of 12th st, and one at south-east side of m st and water st. Staging areas will be restored to original or better condition. Staging area at water st will remain to be in use for the future art project (under a separate permit). To maintain traffic for work at the intersection of 9th st and m st, the sidewalk between 8th st and 9th st on the north side of m st needs to be temporary converted to a travel lane. This r Client: Dc Water | Permit type: Paving; curb & gutte | Permit id: Pa65623-R3 | |||||
SCORE 88 The division e - m street diversion sewer project is intended to address consent decree requirements to control overflows from cso 015 and to consolidate csos 016 and 017. Overflows will be intercepted at the existing combined sewers by constructing diversion chambers and diverted flows will be conveyed to the anacostia river tunnel (art) by a series of diversion sewers constructed along m street se. Diversion chambers will be constructed along m street se to intercept csos 015, 016 and 017 at 9th, 12th and 14th streets se, respectively. A 48 diameter diversion sewer will convey flow from cso 015 to cso 016, and a 108 diversion sewer will convey flow from cso 016 to cso 017. Downstream od cso 017 a 7. 5x15 concrete box "culvert" will be installed alonf m st up to other side of water st. The combined flow diverted from csos 015, 016 and 017 will be delivered to the art via a vortex drop and deaeration facility to be constructed near the intersection of m and water streets se. The vortex d Client: Dc Water And Sewer Authority | Permit type: Paving; curb & gutter | Permit status: Permit expired | Expiration date: April 1, 2013 | Permit id: Pa62436 | |||||
SCORE 88 The division e - m street diversion sewer project is intended to address consent decree requirements to control overflows from cso 015 and to consolidate csos 016 and 017. The excavation elements of this project are contained in application # 62436. Due to the necessary access pits and associated construction work and staging areas, some portions of existing road, medians, curbs, sidewalk and trees needs to be impacted and restored at the completion of work. This project will require 3 staging areas, one between m st, 9th st and potomac ave, one located north of m st , east of 12th st, and one at south-east side of m st and water st. Staging areas will be restored to original or better condition. Staging area at water st will remain to be in use for the future art project (under a separate permit). To maintain traffic for work at the intersection of 9th st and m st, the sidewalk between 8th st and 9th st on the north side of m st needs to be temporary converted to a travel lane. This r Client: Dc Water | Permit type: Paving; curb & gutter | Permit status: Permit expired | Expiration date: April 1, 2013 | Permit id: Pa65623 | |||||
SCORE 88 The division e - m street diversion sewer project is intended to address consent decree requirements to control overflows from cso 015 and to consolidate csos 016 and 017. Overflows will be intercepted at the existing combined sewers by constructing diversion chambers and diverted flows will be conveyed to the anacostia river tunnel (art) by a series of diversion sewers constructed along m street se. Diversion chambers will be constructed along m street se to intercept csos 015, 016 and 017 at 9th, 12th and 14th streets se, respectively. A 48 diameter diversion sewer will convey flow from cso 015 to cso 016, and a 108 diversion sewer will convey flow from cso 016 to cso 017. Downstream od cso 017 a 7. 5x15 concrete box "culvert" will be installed alonf m st up to other side of water st. The combined flow diverted from csos 015, 016 and 017 will be delivered to the art via a vortex drop and deaeration facility to be constructed near the intersection of m and water streets se. The vortex d Client: Dc Water And Sewer Authority | Permit type: Paving; curb & gutter | Permit status: Permit expired | Expiration date: April 1, 2014 | Permit id: Pa62436-R1 | |||||
SCORE 88 The division e - m street diversion sewer project is intended to address consent decree requirements to control overflows from cso 015 and to consolidate csos 016 and 017. The excavation elements of this project are contained in application # 62436. Due to the necessary access pits and associated construction work and staging areas, some portions of existing road, medians, curbs, sidewalk and trees needs to be impacted and restored at the completion of work. This project will require 3 staging areas, one between m st, 9th st and potomac ave, one located north of m st , east of 12th st, and one at south-east side of m st and water st. Staging areas will be restored to original or better condition. Staging area at water st will remain to be in use for the future art project (under a separate permit). To maintain traffic for work at the intersection of 9th st and m st, the sidewalk between 8th st and 9th st on the north side of m st needs to be temporary converted to a travel lane. This r Client: Dc Water | Permit type: Paving; curb & gutter | Permit status: Permit expired | Expiration date: April 1, 2014 | Permit id: Pa65623-R1 | |||||
SCORE 88 The division e - m street diversion sewer project is intended to address consent decree requirements to control overflows from cso 015 and to consolidate csos 016 and 017. The excavation elements of this project are contained in application # 62436. Due to the necessary access pits and associated construction work and staging areas, some portions of existing road, medians, curbs, sidewalk and trees needs to be impacted and restored at the completion of work. This project will require 3 staging areas, one between m st, 9th st and potomac ave, one located north of m st , east of 12th st, and one at south-east side of m st and water st. Staging areas will be restored to original or better condition. Staging area at water st will remain to be in use for the future art project (under a separate permit). To maintain traffic for work at the intersection of 9th st and m st, the sidewalk between 8th st and 9th st on the north side of m st needs to be temporary converted to a travel lane. This r Client: Dc Water | Permit type: Paving; curb & gutter | Permit status: Permit expired | Expiration date: April 1, 2015 | Permit id: Pa65623-R2 | |||||
SCORE 88 The division e - m street diversion sewer project is intended to address consent decree requirements to control overflows from cso 015 and to consolidate csos 016 and 017. Overflows will be intercepted at the existing combined sewers by constructing diversion chambers and diverted flows will be conveyed to the anacostia river tunnel (art) by a series of diversion sewers constructed along m street se. Diversion chambers will be constructed along m street se to intercept csos 015, 016 and 017 at 9th, 12th and 14th streets se, respectively. A 48 diameter diversion sewer will convey flow from cso 015 to cso 016, and a 108 diversion sewer will convey flow from cso 016 to cso 017. Downstream od cso 017 a 7. 5x15 concrete box "culvert" will be installed alonf m st up to other side of water st. The combined flow diverted from csos 015, 016 and 017 will be delivered to the art via a vortex drop and deaeration facility to be constructed near the intersection of m and water streets se. The vortex d Client: Dc Water And Sewer Authority | Permit type: Paving; curb & gutter | Permit status: Permit expired | Expiration date: April 1, 2015 | Permit id: Pa62436-R2 | |||||
Excavate 22 test holes along m st se from 9th st se to water st. Se for the wasa m st diversion sewer project. If steel plates are used at this job site an additional permit is needed the attached conditions are apart of this permit. Permit type: Excavation; boring test pit (single), excavation; boring test pit (each addl) | Permit status: Permit expired | Expiration date: June 29, 2011 | Permit id: Pa59445 | |||||
SCORE 88 The division e - m street diversion sewer project is intended to address consent decree requirements to control overflows from cso 015 and to consolidate csos 016 and 017. Overflows will be intercepted at the existing combined sewers by constructing diversion chambers and diverted flows will be conveyed to the anacostia river tunnel (art) by a series of diversion sewers constructed along m street se. Diversion chambers will be constructed along m street se to intercept csos 015, 016 and 017 at 9th, 12th and 14th streets se, respectively. A 48 diameter diversion sewer will convey flow from cso 015 to cso 016, and a 108 diversion sewer will convey flow from cso 016 to cso 017. Downstream od cso 017 a 7. 5x15 concrete box "culvert" will be installed alonf m st up to other side of water st. The combined flow diverted from csos 015, 016 and 017 will be delivered to the art via a vortex drop and deaeration facility to be constructed near the intersection of m and water streets se. The vortex d Client: Dc Water And Sewer Authority | Permit type: Paving; curb & gutter | Permit status: Permit expired | Expiration date: June 30, 2015 | Permit id: Pa62436-R3 | |||||
SCORE 88 The division e - m street diversion sewer project is intended to address consent decree requirements to control overflows from cso 015 and to consolidate csos 016 and 017. The excavation elements of this project are contained in application # 62436. Due to the necessary access pits and associated construction work and staging areas, some portions of existing road, medians, curbs, sidewalk and trees needs to be impacted and restored at the completion of work. This project will require 3 staging areas, one between m st, 9th st and potomac ave, one located north of m st , east of 12th st, and one at south-east side of m st and water st. Staging areas will be restored to original or better condition. Staging area at water st will remain to be in use for the future art project (under a separate permit). To maintain traffic for work at the intersection of 9th st and m st, the sidewalk between 8th st and 9th st on the north side of m st needs to be temporary converted to a travel lane. This r Client: Dc Water | Permit type: Paving; curb & gutter | Permit status: Permit expired | Expiration date: June 30, 2015 | Permit id: Pa65623-R3 | |||||
SCORE 63 Excavate 22 test holes along m st se from 9th st se to water st. Se for the wasa m st diversion sewer project. If steel plates are used at this job site an additional permit is needed the attached conditions are apart of this permit. Permit type: Excavation; boring test pit (single), excavation; boring test pit (each addl) | Permit status: Permit expired | Expiration date: June 29, 2011 | Permit id: Pa59445 | |||||
SCORE 88 The division e - m street diversion sewer project is intended to address consent decree requirements to control overflows from cso 015 and to consolidate csos 016 and 017. Overflows will be intercepted at the existing combined sewers by constructing diversion chambers and diverted flows will be conveyed to the anacostia river tunnel (art) by a series of diversion sewers constructed along m street se. Diversion chambers will be constructed along m street se to intercept csos 015, 016 and 017 at 9th, 12th and 14th streets se, respectively. A 48 diameter diversion sewer will convey flow from cso 015 to cso 016, and a 108 diversion sewer will convey flow from cso 016 to cso 017. Downstream od cso 017 a 7. 5x15 concrete box "culvert" will be installed alonf m st up to other side of water st. The combined flow diverted from csos 015, 016 and 017 will be delivered to the art via a vortex drop and deaeration facility to be constructed near the intersection of m and water streets se. The vortex d Client: Dc Water And Sewer Authority | Permit type: Paving; curb & gutter | Permit status: Permit expired | Expiration date: April 1, 2014 | Permit id: Pa62436-R1 | |||||
SCORE 88 The division e - m street diversion sewer project is intended to address consent decree requirements to control overflows from cso 015 and to consolidate csos 016 and 017. The excavation elements of this project are contained in application # 62436. Due to the necessary access pits and associated construction work and staging areas, some portions of existing road, medians, curbs, sidewalk and trees needs to be impacted and restored at the completion of work. This project will require 3 staging areas, one between m st, 9th st and potomac ave, one located north of m st , east of 12th st, and one at south-east side of m st and water st. Staging areas will be restored to original or better condition. Staging area at water st will remain to be in use for the future art project (under a separate permit). To maintain traffic for work at the intersection of 9th st and m st, the sidewalk between 8th st and 9th st on the north side of m st needs to be temporary converted to a travel lane. This r Client: Dc Water | Permit type: Paving; curb & gutter | Permit status: Permit expired | Expiration date: April 1, 2014 | Permit id: Pa65623-R1 | |||||
SCORE 88 The division e - m street diversion sewer project is intended to address consent decree requirements to control overflows from cso 015 and to consolidate csos 016 and 017. The excavation elements of this project are contained in application # 62436. Due to the necessary access pits and associated construction work and staging areas, some portions of existing road, medians, curbs, sidewalk and trees needs to be impacted and restored at the completion of work. This project will require 3 staging areas, one between m st, 9th st and potomac ave, one located north of m st , east of 12th st, and one at south-east side of m st and water st. Staging areas will be restored to original or better condition. Staging area at water st will remain to be in use for the future art project (under a separate permit). To maintain traffic for work at the intersection of 9th st and m st, the sidewalk between 8th st and 9th st on the north side of m st needs to be temporary converted to a travel lane. This r Client: Dc Water | Permit type: Paving; curb & gutter | Permit status: Permit expired | Expiration date: April 1, 2015 | Permit id: Pa65623-R2 | |||||
SCORE 88 The division e - m street diversion sewer project is intended to address consent decree requirements to control overflows from cso 015 and to consolidate csos 016 and 017. Overflows will be intercepted at the existing combined sewers by constructing diversion chambers and diverted flows will be conveyed to the anacostia river tunnel (art) by a series of diversion sewers constructed along m street se. Diversion chambers will be constructed along m street se to intercept csos 015, 016 and 017 at 9th, 12th and 14th streets se, respectively. A 48 diameter diversion sewer will convey flow from cso 015 to cso 016, and a 108 diversion sewer will convey flow from cso 016 to cso 017. Downstream od cso 017 a 7. 5x15 concrete box "culvert" will be installed alonf m st up to other side of water st. The combined flow diverted from csos 015, 016 and 017 will be delivered to the art via a vortex drop and deaeration facility to be constructed near the intersection of m and water streets se. The vortex d Client: Dc Water And Sewer Authority | Permit type: Paving; curb & gutter | Permit status: Permit expired | Expiration date: April 1, 2015 | Permit id: Pa62436-R2 | |||||
SCORE 88 The division e - m street diversion sewer project is intended to address consent decree requirements to control overflows from cso 015 and to consolidate csos 016 and 017. Overflows will be intercepted at the existing combined sewers by constructing diversion chambers and diverted flows will be conveyed to the anacostia river tunnel (art) by a series of diversion sewers constructed along m street se. Diversion chambers will be constructed along m street se to intercept csos 015, 016 and 017 at 9th, 12th and 14th streets se, respectively. A 48 diameter diversion sewer will convey flow from cso 015 to cso 016, and a 108 diversion sewer will convey flow from cso 016 to cso 017. Downstream od cso 017 a 7. 5x15 concrete box "culvert" will be installed alonf m st up to other side of water st. The combined flow diverted from csos 015, 016 and 017 will be delivered to the art via a vortex drop and deaeration facility to be constructed near the intersection of m and water streets se. The vortex d Client: Dc Water And Sewer Authority | Permit type: Paving; curb & gutter | Permit status: Permit expired | Expiration date: June 30, 2015 | Permit id: Pa62436-R3 | |||||
SCORE 88 The division e - m street diversion sewer project is intended to address consent decree requirements to control overflows from cso 015 and to consolidate csos 016 and 017. The excavation elements of this project are contained in application # 62436. Due to the necessary access pits and associated construction work and staging areas, some portions of existing road, medians, curbs, sidewalk and trees needs to be impacted and restored at the completion of work. This project will require 3 staging areas, one between m st, 9th st and potomac ave, one located north of m st , east of 12th st, and one at south-east side of m st and water st. Staging areas will be restored to original or better condition. Staging area at water st will remain to be in use for the future art project (under a separate permit). To maintain traffic for work at the intersection of 9th st and m st, the sidewalk between 8th st and 9th st on the north side of m st needs to be temporary converted to a travel lane. This r Client: Dc Water | Permit type: Paving; curb & gutter | Permit status: Permit expired | Expiration date: June 30, 2015 | Permit id: Pa65623-R3 | |||||
SCORE 59 Construction staging area Permit status: Expired | Expiration date: June 30, 2011 | Permit id: Pa10026414 | |||||
SCORE 61 Manhole access 11 days Permit status: Expired | Expiration date: November 18, 2011 | Permit id: Pa10043880 | |||||
SCORE 61 Construction staging area Permit status: Notpaid | Expiration date: November 18, 2011 | Permit id: 0 | |||||
SCORE 88 The division e - m street diversion sewer project is intended to address consent decree requirements to control overflows from cso 015 and to consolidate csos 016 and 017. The excavation elements of this project are contained in application # 62436. Due to the necessary access pits and associated construction work and staging areas, some portions of existing road, medians, curbs, sidewalk and trees needs to be impacted and restored at the completion of work. This project will require 3 staging areas, one between m st, 9th st and potomac ave, one located north of m st , east of 12th st, and one at south-east side of m st and water st. Staging areas will be restored to original or better condition. Staging area at water st will remain to be in use for the future art project (under a separate permit). To maintain traffic for work at the intersection of 9th st and m st, the sidewalk between 8th st and 9th st on the north side of m st needs to be temporary converted to a travel lane. This r Permit status: Permit expired | Expiration date: April 1, 2014 | Permit id: Pa65623-R1 | |||||
SCORE 88 The division e - m street diversion sewer project is intended to address consent decree requirements to control overflows from cso 015 and to consolidate csos 016 and 017. The excavation elements of this project are contained in application # 62436. Due to the necessary access pits and associated construction work and staging areas, some portions of existing road, medians, curbs, sidewalk and trees needs to be impacted and restored at the completion of work. This project will require 3 staging areas, one between m st, 9th st and potomac ave, one located north of m st , east of 12th st, and one at south-east side of m st and water st. Staging areas will be restored to original or better condition. Staging area at water st will remain to be in use for the future art project (under a separate permit). To maintain traffic for work at the intersection of 9th st and m st, the sidewalk between 8th st and 9th st on the north side of m st needs to be temporary converted to a travel lane. This r Permit status: Permit expired | Expiration date: April 1, 2015 | Permit id: Pa65623-R2 | |||||
SCORE 59 Excavate 22 test holes along m st se from 9th st se to water st. Se for the wasa m st diversion sewer project. If steel plates are used at this job site an additional permit is needed the attached conditions are apart of this permit. Permit type: Excavation; boring test pit (single), excavation; boring test pit (each addl) | Permit status: Permit expired | Expiration date: June 29, 2011 | Permit id: Pa59445 | |||||
SCORE 88 The division e - m street diversion sewer project is intended to address consent decree requirements to control overflows from cso 015 and to consolidate csos 016 and 017. The excavation elements of this project are contained in application # 62436. Due to the necessary access pits and associated construction work and staging areas, some portions of existing road, medians, curbs, sidewalk and trees needs to be impacted and restored at the completion of work. This project will require 3 staging areas, one between m st, 9th st and potomac ave, one located north of m st , east of 12th st, and one at south-east side of m st and water st. Staging areas will be restored to original or better condition. Staging area at water st will remain to be in use for the future art project (under a separate permit). To maintain traffic for work at the intersection of 9th st and m st, the sidewalk between 8th st and 9th st on the north side of m st needs to be temporary converted to a travel lane. This r Permit status: Permit expired | Expiration date: June 30, 2015 | Permit id: Pa65623-R3 | |||||
SCORE 61 Construction staging area Permit status: Notpaid | Expiration date: November 18, 2011 | Permit id: 0 | |||||
SCORE 88 The division e - m street diversion sewer project is intended to address consent decree requirements to control overflows from cso 015 and to consolidate csos 016 and 017. Overflows will be intercepted at the existing combined sewers by constructing diversion chambers and diverted flows will be conveyed to the anacostia river tunnel (art) by a series of diversion sewers constructed along m street se. Diversion chambers will be constructed along m street se to intercept csos 015, 016 and 017 at 9th, 12th and 14th streets se, respectively. A 48 diameter diversion sewer will convey flow from cso 015 to cso 016, and a 108 diversion sewer will convey flow from cso 016 to cso 017. Downstream od cso 017 a 7. 5x15 concrete box "culvert" will be installed alonf m st up to other side of water st. The combined flow diverted from csos 015, 016 and 017 will be delivered to the art via a vortex drop and deaeration facility to be constructed near the intersection of m and water streets se. The vortex d Client: Dc Water And Sewer Authority | Permit type: Paving; curb & gutter | Permit status: Permit expired | Expiration date: April 1, 2013 | Permit id: Pa62436 | |||||
SCORE 88 The division e - m street diversion sewer project is intended to address consent decree requirements to control overflows from cso 015 and to consolidate csos 016 and 017. The excavation elements of this project are contained in application # 62436. Due to the necessary access pits and associated construction work and staging areas, some portions of existing road, medians, curbs, sidewalk and trees needs to be impacted and restored at the completion of work. This project will require 3 staging areas, one between m st, 9th st and potomac ave, one located north of m st , east of 12th st, and one at south-east side of m st and water st. Staging areas will be restored to original or better condition. Staging area at water st will remain to be in use for the future art project (under a separate permit). To maintain traffic for work at the intersection of 9th st and m st, the sidewalk between 8th st and 9th st on the north side of m st needs to be temporary converted to a travel lane. This r Client: Dc Water | Permit type: Paving; curb & gutter | Permit status: Permit expired | Expiration date: April 1, 2013 | Permit id: Pa65623 | |||||
SCORE 86 Install bikeshare station in parking lane. Permit type: Fixture; bike share station | Permit status: Permit expired | Expiration date: September 2, 2013 | Permit id: Pa82698 | |||||
SCORE 88 Paving; curb & gutter(s), paving; ada curb ramp, paving; mill and overlay, paving; roadway(s), paving; sidewalk(s), landscaping; tree planting, landscaping; tree removal 2"-6", landscaping; new tree space(s), landscaping; stormwater mgmt (serve public), excavation; gas main line (trench), excavation; manhole installation, excavation; sewer ml (trench), excavation; telecom ml conduits (trench), excavation; vault(s) lxw, excavation; water ml (trench), excavation; storm main line (trench), over head work; streetlight(s) installation, over head work; streetlight temporary removal, excavation; tree space, if excavation and no tree, excavation; replace grating (electrical vault cover), excavation; electric ml conduit (trench), excavation; fire hydrant(s), excavation; manhole frame and cover (adjust), excavation; repair sewer main line, excavation; vault(s) 20x each, excavation; repair water main line, over head work; pole removal (single or first one), over head work; pole removal (each addl Permit status: Permit expired | Expiration date: April 1, 2014 | Permit id: Pa62436-R1 | |||||
SCORE 88 Paving; curb & gutter(s), paving; ada curb ramp, paving; mill and overlay, paving; roadway(s), paving; sidewalk(s), landscaping; tree planting, landscaping; tree removal 2"-6", landscaping; new tree space(s), landscaping; stormwater mgmt (serve public), excavation; gas main line (trench), excavation; manhole installation, excavation; sewer ml (trench), excavation; telecom ml conduits (trench), excavation; vault(s) lxw, excavation; water ml (trench), excavation; storm main line (trench), over head work; streetlight(s) installation, over head work; streetlight temporary removal, excavation; tree space, if excavation and no tree, excavation; replace grating (electrical vault cover), excavation; electric ml conduit (trench), excavation; fire hydrant(s), excavation; manhole frame and cover (adjust), excavation; repair sewer main line, excavation; vault(s) 20x each, excavation; repair water main line, over head work; pole removal (single or first one), over head work; pole removal (each addl Permit status: Permit expired | Expiration date: April 1, 2015 | Permit id: Pa62436-R2 | |||||
SCORE 88 Paving; curb & gutter(s), paving; ada curb ramp, paving; mill and overlay, paving; roadway(s), paving; sidewalk(s), landscaping; tree planting, landscaping; tree removal 2"-6", landscaping; new tree space(s), landscaping; stormwater mgmt (serve public), excavation; gas main line (trench), excavation; manhole installation, excavation; sewer ml (trench), excavation; telecom ml conduits (trench), excavation; vault(s) lxw, excavation; water ml (trench), excavation; storm main line (trench), over head work; streetlight(s) installation, over head work; streetlight temporary removal, excavation; tree space, if excavation and no tree, excavation; replace grating (electrical vault cover), excavation; electric ml conduit (trench), excavation; fire hydrant(s), excavation; manhole frame and cover (adjust), excavation; repair sewer main line, excavation; vault(s) 20x each, excavation; repair water main line, over head work; pole removal (single or first one), over head work; pole removal (each addl Permit status: Permit expired | Expiration date: June 30, 2015 | Permit id: Pa62436-R3 |