Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Installation of upho Date: January 6, 2015 Permit status: Na | Permit id: Chm439489 | |||||
Cutting burning welding of boiler piping for repairs modifications to boiler plant;(dpl) bfd paid detail ;required bfd paid detail required Date: December 4, 2014 Permit status: Na | Permit id: Cbw429708 | |||||
Install new ul3 fire suppression system.; manual activation device to be within 5 feet o f kitchen exit-access door on latch side of door.; Date: March 17, 2015 Permit status: Na | Permit id: Sprk454419 | |||||
Relocate (8) existing sprinklers on the;7th floor relocate (8) existing sprinklers on the 8th floor.; work to be done per nfpa stands.; work to be done one floor zone at a time. Date: October 22, 2010 Permit status: Na | Permit id: Sprk46867 | |||||
Cutting burning &; welding of structural steel;to install support to upper portion of walls (dpl) bfd paid detail required Date: January 9, 2015 Permit status: Na | Permit id: Cbw438585 | |||||
Install speaker strobes and smoke detector; ~; doc# 20141071 Date: August 13, 2014 Permit status: Na | Permit id: Bfdf391136 | |||||
Street occupancy Date: August 16, 2012 Permit status: Expired | Permit id: Occu-174016 | |||||
Stand crane at curb erect pedestrian staging on sidewalk Date: May 20, 2015 Permit type: Cranes | Permit status: Expired | Permit id: Occu-475094 | |||||
Welding for repairs;to ;air handler;on motor mount unit ;that is broken;dpl 21815-31515 bfd paid detail required Date: March 2, 2015 Permit status: Na | Permit id: Cbw447394 | |||||
SCORE 82 Relocate five (5) sprinkler heads on the 10th floor and five (5) sprinkler heads on the 11th floor for a total of ten (10) heads Date: April 3, 2015 Contractor: Boston Fire Sprinkler Co. Inc Permit type: Bfd other | Permit status: Na | Permit id: Sprk453876 | |||||
Street occupancy Date: December 3, 2013 Permit status: Expired | Permit id: Occu-309940 | |||||
Occupy (1) manhole; all work 7pm-6am; approved by level 3; police detail area a 343-4239; (1) Date: July 29, 2015 Permit type: Street occupancy | Permit status: Expired | Permit id: Occu-500197 | |||||
Street occupancy Date: January 16, 2013 Permit status: Expired | Permit id: Occu-214261 | |||||
Installation in accordance with the requirements of 7 cmr and nfpa 13....... Impairment limited to one floor at any given time Date: December 1, 2014 Permit status: Na | Permit id: Sprk429421 | |||||
Installation of upho Date: January 6, 2015 Permit status: Na | Permit id: Chm439476 | |||||
Boiler demolition (dpl) bfd paid detail required Date: August 7, 2014 Permit status: Na | Permit id: Cbw392452 | |||||
Boiler that is no longer in use and is being removed from the buildings basement boiler room. Bfd paid detail required Date: July 30, 2014 Permit status: Na | Permit id: Cbw388456 | |||||
Demo/renovations of office space to include drywall painting ceilings &; flooring Date: September 21, 2010 Permit status: Na | Permit id: Fdc43010 | |||||
Welding only for the installation of 8" black;iron vent with fire wrap... Oven will tie into existing building exhaust system (dpl) ; bfd paid detail required Date: March 17, 2015 Permit status: Na | Permit id: Cbw453950 | |||||
Installation of floo Date: August 14, 2014 Permit status: Na | Permit id: Chm393938 | |||||
Dimension change: 400ft? Date: March 12, 2013 Permit type: Fencing | Permit status: Expired | Permit id: Occu-174019 | |||||
Roadway patch / trench repair Date: June 3, 2014 Permit type: Maintenance | Permit status: Expired | Permit id: Exca-368841 | |||||
Demo/renovations to office space to include drywall ceiling painting &; flooring ; Date: September 21, 2010 Permit status: Na | Permit id: Fdc42917 | |||||
Bagging of smoke detectors Date: September 20, 2010 Permit status: Na | Permit id: Bsd43017 | |||||
Boiler demolition bfd paid detail required Date: July 25, 2014 Permit status: Na | Permit id: Cbw387701 | |||||
Installation of upho Date: January 30, 2015 Permit status: Na | Permit id: Chm441894 | |||||
To remove asbestos Date: August 23, 2010 Permit status: Na | Permit id: Asb39496 | |||||
On-going construction Date: December 6, 2010 Permit status: Na | Permit id: Bsd43038 | |||||
Installation of floo Date: May 22, 2015 Permit status: Na | Permit id: Chm472723 | |||||
Installation of upho Date: September 19, 2013 Permit status: Na | Permit id: Chm287548 | |||||
Relocate (1) a/v device relocate (1) visual device doc#20100851 Date: October 8, 2010 Permit status: Na | Permit id: Bfdf44195 |