Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Wellington estates Date: October 17, 2013 Permit status: Closed | Permit id: 13-04539 | |||||
SCORE 100 Wellington estates Date: October 17, 2013 Contractor: Energy Solutions Co Client: Wellington Estates | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 13-04539 | Parcel: 1947078 | |||||
SCORE 100 Wellington estates Date: October 17, 2013 Contractor: R And D Modular And Mobile Const Client: Wellington Estates | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 13-04539 | Parcel: 1947078 | |||||
July 24, 2013 4:21:01 pm scarver. Setting new double wide 3br/2ba-master approval 09-6160; october 17, 2013 8:40:54 am ssalyer. No premise number given have not called duke;sls; october 21, 2013 1:42:08 pm mlipe. Premise number redacted phone number1 - called power in at 1:44pm; october 17, 2013 8:40:14 am ssalyer. Setting new double wide 3br/2ba-master approval 09-6160;sls; manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. Deck & landing l Permit type: Permits - historical | Permit status: Closed | Permit id: 13-04539 | Parcel: 1947078 | |||||
SCORE 100 Wellington estates Date: October 17, 2013 Contractor: R And D Modular And Mobile Const Client: Wellington Estates | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 13-04539 | Parcel: 1947078 | |||||
July 24, 2013 4:21:01 pm scarver. Setting new double wide 3br 2ba-master approval 09-6160; october 17, 2013 8:40:54 am ssalyer. No premise number given have not called duke;sls; october 21, 2013 1:42:08 pm mlipe. Premise number redacted phone number1 - called power in at 1:44pm; october 17, 2013 8:40:14 am ssalyer. Setting new double wide 3br 2ba-master approval 09-6160;sls; manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. Deck & landing l Date: October 17, 2013 Permit type: Permits - historical | Permit status: Closed | Permit id: 13-04539 | Parcel: 1947078 |