The project consists of pavement reconstruction, bridge and parking area rehabilitation, drainage, traffic signal and street light replacement, permanent signing and striping, and other miscellaneous work. Most of the work will be on beach drive, which is a national park service road but there is some construction, and temporary traffic control signs that will be in the adjacent roads that are dc roads. Permit type: Fixture; traffic sig | |||||
SCORE 99 Excavate a 30x receiving pit for pulling pvc lining through the water main. As well as installing connective water main valves in pit upon completion of pvc lining. Permit type: Excavation; repair water main line | Permit status: Permit expired | Expiration date: March 9, 2013 | Permit id: Pa75013 | |||||
SCORE 99 Excavate a 40x receiving pit for pulling pvc lining through the water main at 16th street n. W. Between arkansas ave n. W. And spring road n. W. As well as installing connective water main valves in pit upon completion of pvc lining. Permit type: Excavation; repair water main line | Permit status: Permit expired | Expiration date: January 27, 2013 | Permit id: Pa75014 | |||||
SCORE 99 Excavate a 40x receiving pit for pulling pvc lining through the water main at 16th street n. W. Between arkansas ave n. W. And spring road n. W. As well as installing connective water main valves in pit upon completion of pvc lining. Permit type: Excavation; repair water main line | Permit status: Permit expired | Expiration date: April 30, 2013 | Permit id: Pa75014-R1 | |||||
SCORE 99 Excavate a 30x receiving pit for pulling pvc lining through the water main. As well as installing connective water main valves in pit upon completion of pvc lining. Permit type: Excavation; repair water main line | Permit status: Permit expired | Expiration date: May 17, 2013 | Permit id: Pa75013-R1 | |||||
SCORE 99 Excavate a 30x receiving pit for pulling pvc lining through the water main. As well as installing connective water main valves in pit upon completion of pvc lining. Permit type: Excavation; repair water main line | Permit status: Permit expired | Expiration date: March 28, 2014 | Permit id: Pa75013-R6 | |||||
SCORE 99 Excavate a 40x receiving pit for pulling pvc lining through the water main at 16th street n. W. Between arkansas ave n. W. And spring road n. W. As well as installing connective water main valves in pit upon completion of pvc lining. Permit type: Excavation; repair water main line | Permit status: Permit expired | Expiration date: May 2, 2014 | Permit id: Pa75014-R7 | |||||
SCORE 78 The project consists of pavement reconstruction, bridge and parking area rehabilitation, drainage, traffic signal and street light replacement, permanent signing and striping, and other miscellaneous work. Most of the work will be on beach drive, which is a national park service road but there is some construction, and temporary traffic control signs that will be in the adjacent roads that are dc roads. Permit type: Fixture; traffic signal installation | Permit status: Cancel/withdrawn | Expiration date: August 15, 2016 | |||||
SCORE 100 Repair sewer services (manholes) in sidewalk. Permit type: Excavation; manhole frame and cover (adjust) | Permit status: Permit expired | Expiration date: April 4, 2016 | Permit id: Pa122753 | |||||
SCORE 100 Repair sewer services (manholes) in sidewalk. Permit type: Excavation; manhole frame and cover (adjust) | Permit status: Permit expired | Expiration date: June 3, 2016 | Permit id: Pa122753-R1 | |||||
SCORE 82 Stage l & 2 will close beach drive between shoreham drive and tilden street i parle road. The work will be divided into two phases to help facilitate the bike/pedestrian detours; as well as, cross town traffic between porter street and piney branch parkway. This stage includes the reconstruction of beach drive (from sta. 99+ to sta. 195+00), the reconstruction of the rock creek trail (from sta. 99+ to sta. 159+ and from sta. 176+ to sta. 190+00), the construction of a new segment of the rock creek trail (from sta. 165+ to sta. 176+00), the rehabilitation of zoo tunnel bridge and the zoo tunnel (including sidewalk widening), the rehabilitation of the ramp to harvard street, street light replacement (sta. 99+ to sta. 111+40), and traffic signal replacement at the tilden street intersection, among other miscellaneous work. Access to the national zoo driveway and harvard street ramp will be closed. Stage 3 will close beach drive between tilden street ipark road and broad branch road. The wo Permit type: Fixture; sign-free standing | Permit status: Cancel/withdrawn | Expiration date: October 16, 2017 | |||||
SCORE 100 Repair sewer services (manholes) in sidewalk. Permit type: Excavation; manhole frame and cover (adjust) | Permit status: Permit expired | Expiration date: June 3, 2016 | Permit id: Pa122753-R1 | |||||
SCORE 100 Construction staging area Permit status: Withdrawn | Expiration date: July 28, 2013 | Permit id: 0 | |||||
SCORE 100 Construction staging area Permit status: Notpaid | Expiration date: July 20, 2013 | Permit id: 0 | |||||
SCORE 100 Steel plate permit Permit status: Expired | Expiration date: January 26, 2014 | Permit id: Pa10127852 | |||||
SCORE 100 Steel plate permit Permit status: Expired | Expiration date: June 27, 2013 | Permit id: Pa10102878 | |||||
SCORE 100 Construction staging area Permit status: Rejected | Expiration date: January 12, 2014 | Permit id: 0 | |||||
SCORE 100 Construction staging area Permit status: Notpaid | Expiration date: August 9, 2013 | Permit id: 0 | |||||
SCORE 100 Construction staging area Permit status: Expired | Expiration date: February 19, 2013 | Permit id: Pa10084590 | |||||
SCORE 100 Construction staging area Permit status: Notpaid | Expiration date: March 16, 2014 | Permit id: 0 | |||||
SCORE 99 Excavation; repair water main line Permit status: 3 | Expiration date: May 27, 2014 | Permit id: 0 | |||||
SCORE 78 Fixture; traffic signal installation Permit status: 3 | Expiration date: August 15, 2016 | Permit id: 0 | |||||
SCORE 100 Construction staging area Permit status: Expired | Expiration date: January 5, 2016 | Permit id: Pa10219776 | |||||
SCORE 100 Construction staging area Permit status: Expired | Expiration date: February 14, 2014 | Permit id: Pa10123521 | |||||
SCORE 100 Construction staging area Permit status: Notpaid | Expiration date: November 28, 2013 | Permit id: 0 | |||||
SCORE 100 Construction staging area Permit status: Rejected | Expiration date: July 28, 2013 | Permit id: 0 | |||||
SCORE 100 Construction staging area Permit status: Notpaid | Expiration date: July 28, 2013 | Permit id: 0 | |||||
SCORE 100 Construction staging area Permit status: Expired | Expiration date: July 5, 2013 | Permit id: Pa10099784 | |||||
SCORE 99 Excavation; repair water main line Permit status: 8 | Expiration date: February 28, 2014 | Permit id: Pa75014-R6 | |||||
SCORE 99 Excavation; repair water main line Permit status: 8 | Expiration date: March 9, 2013 | Permit id: Pa75013 | |||||
SCORE 100 Construction staging area Permit status: Notpaid | Expiration date: August 7, 2013 | Permit id: 0 | |||||
SCORE 100 Construction staging area Permit status: Expired | Expiration date: September 2, 2013 | Permit id: Pa10103038-R1 | |||||
SCORE 100 Construction staging area Permit status: Expired | Expiration date: June 17, 2016 | Permit id: Pa10249900 | |||||
SCORE 100 Excavate a 40x receiving pit for pulling pvc lining through the water main at 16th street n. W. Between arkansas ave n. W. And spring road n. W. As well as installing connective water main valves in pit upon completion of pvc lining. Permit status: Permit expired | Expiration date: January 27, 2013 | Permit id: Pa75014 | |||||
SCORE 100 Excavate a 30x receiving pit for pulling pvc lining through the water main. As well as installing connective water main valves in pit upon completion of pvc lining. Permit status: Permit expired | Expiration date: March 9, 2013 | Permit id: Pa75013 | |||||
SCORE 100 Excavate a 40x receiving pit for pulling pvc lining through the water main at 16th street n. W. Between arkansas ave n. W. And spring road n. W. As well as installing connective water main valves in pit upon completion of pvc lining. Permit status: Permit expired | Expiration date: February 28, 2014 | Permit id: Pa75014-R6 | |||||
SCORE 100 Excavate a 30x receiving pit for pulling pvc lining through the water main. As well as installing connective water main valves in pit upon completion of pvc lining. Permit status: Permit expired | Expiration date: March 28, 2014 | Permit id: Pa75013-R6 | |||||
SCORE 100 Excavate a 30x receiving pit for pulling pvc lining through the water main. As well as installing connective water main valves in pit upon completion of pvc lining. Permit status: Cancel/withdrawn | Expiration date: May 27, 2014 | Permit id: 0 | |||||
SCORE 78 The project consists of pavement reconstruction, bridge and parking area rehabilitation, drainage, traffic signal and street light replacement, permanent signing and striping, and other miscellaneous work. Most of the work will be on beach drive, which is a national park service road but there is some construction, and temporary traffic control signs that will be in the adjacent roads that are dc roads. Permit status: Cancel/withdrawn | Expiration date: August 15, 2016 | Permit id: 0 | |||||
SCORE 100 Construction staging area Permit status: Permit expired | Expiration date: February 19, 2013 | Permit id: Pa10084586 | |||||
SCORE 100 Steel plate- single location Permit status: Permit expired | Expiration date: April 8, 2013 | Permit id: Pa10091979 | |||||
SCORE 100 Construction staging area Permit status: Rejected | Expiration date: July 28, 2013 | Permit id: 0 | |||||
SCORE 100 Construction staging area Permit status: Not paid | Expiration date: July 28, 2013 | Permit id: 0 | |||||
SCORE 100 Construction staging area Permit status: Not paid | Expiration date: July 20, 2013 | Permit id: 0 | |||||
SCORE 100 Construction staging area Permit status: Withdrawn | Expiration date: July 28, 2013 | Permit id: 0 | |||||
SCORE 100 Construction staging area Permit status: Not paid | Expiration date: August 9, 2013 | Permit id: 0 | |||||
SCORE 100 Construction staging area Permit status: Not paid | Expiration date: August 7, 2013 | Permit id: 0 | |||||
SCORE 100 Construction staging area Permit status: Not paid | Expiration date: November 28, 2013 | Permit id: 0 | |||||
SCORE 100 Construction staging area Permit status: Rejected | Expiration date: January 12, 2014 | Permit id: 0 | |||||
SCORE 100 Construction staging area Permit status: Permit expired | Expiration date: February 14, 2014 | Permit id: Pa10123521 | |||||
SCORE 100 Steel plate- single location Permit status: Permit expired | Expiration date: January 26, 2014 | Permit id: Pa10127852 | |||||
SCORE 100 Construction staging area Permit status: Not paid | Expiration date: March 16, 2014 | Permit id: 0 | |||||
SCORE 100 Construction staging area Permit status: Permit expired | Expiration date: January 5, 2016 | Permit id: Pa10219776 | |||||
SCORE 100 Construction staging area Permit status: Permit expired | Expiration date: June 17, 2016 | Permit id: Pa10249900 | |||||
SCORE 99 Excavation; repair water main line Permit status: 3 | Expiration date: May 27, 2014 | Permit id: 0 | |||||
SCORE 78 Fixture; traffic signal installation Permit status: 3 | Expiration date: August 15, 2016 | Permit id: 0 | |||||
SCORE 100 Repair sewer services (manhole) in sidewalk. Permit type: Excavation; repair sewer service lateral | Permit status: Permit expired | Expiration date: December 29, 2015 | Permit id: Pa118402 | |||||
SCORE 100 Repair sewer services (manholes) in sidewalk. Permit type: Excavation; manhole frame and cover (adjust) | Permit status: Permit expired | Expiration date: April 4, 2016 | Permit id: Pa122753 | |||||
SCORE 100 Construction staging area Permit status: Notpaid | Expiration date: July 20, 2013 | Permit id: 0 | |||||
SCORE 100 Construction staging area Permit status: Withdrawn | Expiration date: July 28, 2013 | Permit id: 0 | |||||
SCORE 100 Construction staging area Permit status: Notpaid | Expiration date: August 7, 2013 | Permit id: 0 | |||||
SCORE 100 Construction staging area Permit status: Notpaid | Expiration date: March 16, 2014 | Permit id: 0 | |||||
SCORE 100 Construction staging area Permit status: Notpaid | Expiration date: August 9, 2013 | Permit id: 0 | |||||
SCORE 100 Construction staging area Permit status: Rejected | Expiration date: January 12, 2014 | Permit id: 0 | |||||
SCORE 100 Construction staging area Permit status: Rejected | Expiration date: July 28, 2013 | Permit id: 0 | |||||
SCORE 100 Construction staging area Permit status: Notpaid | Expiration date: July 28, 2013 | Permit id: 0 | |||||
SCORE 100 Construction staging area Permit status: Notpaid | Expiration date: November 28, 2013 | Permit id: 0 | |||||
SCORE 100 Excavate a 30x receiving pit for pulling pvc lining through the water main. As well as installing connective water main valves in pit upon completion of pvc lining. Permit status: Cancel/withdrawn | Expiration date: May 27, 2014 | Permit id: 0 | |||||
SCORE 78 The project consists of pavement reconstruction, bridge and parking area rehabilitation, drainage, traffic signal and street light replacement, permanent signing and striping, and other miscellaneous work. Most of the work will be on beach drive, which is a national park service road but there is some construction, and temporary traffic control signs that will be in the adjacent roads that are dc roads. Permit status: Cancel/withdrawn | Expiration date: August 15, 2016 | Permit id: 0 | |||||
SCORE 100 Repair sewer services (manhole) in sidewalk. Permit type: Excavation; repair sewer service lateral | Permit status: Permit expired | Expiration date: December 29, 2015 | Permit id: Pa118402 | |||||
SCORE 100 Construction staging area Permit status: Rejected | Expiration date: July 28, 2013 | Permit id: 0 | |||||
SCORE 100 Construction staging area Permit status: Not paid | Expiration date: July 28, 2013 | Permit id: 0 | |||||
SCORE 100 Construction staging area Permit status: Withdrawn | Expiration date: July 28, 2013 | Permit id: 0 | |||||
SCORE 100 Construction staging area Permit status: Not paid | Expiration date: July 20, 2013 | Permit id: 0 | |||||
SCORE 100 Construction staging area Permit status: Not paid | Expiration date: August 9, 2013 | Permit id: 0 | |||||
SCORE 100 Construction staging area Permit status: Not paid | Expiration date: August 7, 2013 | Permit id: 0 | |||||
SCORE 100 Construction staging area Permit status: Not paid | Expiration date: November 28, 2013 | Permit id: 0 | |||||
SCORE 100 Construction staging area Permit status: Rejected | Expiration date: January 12, 2014 | Permit id: 0 | |||||
SCORE 100 Construction staging area Permit status: Not paid | Expiration date: March 16, 2014 | Permit id: 0 | |||||
Stage l & 2 will close beach drive between shoreham drive and tilden street i parle road. The work will be divided into two phases to help facilitate the bike/pedestrian detours; as well as, cross town traffic between porter street and piney branch parkway. This stage includes the reconstruction of beach drive (from sta. 99+ to sta. 195+00), the reconstruction of the rock creek trail (from sta. 99+ to sta. 159+ and from sta. 176+ to sta. 190+00), the construction of a new segment of the rock creek trail (from sta. 165+ to sta. 176+00), the rehabilitation of zoo tunnel bridge and the zoo tunnel (including sidewalk widening), the rehabilitation of the ramp to harvard street, street light replacement (sta. 99+ to sta. 111+40), and traffic signal replacement at the tilden street intersection, among other miscellaneous work. Access to the national zoo driveway and harvard street ramp will be closed. This plans have been reviewed and approved by mr. Trey dickerson form dc dot office of traffi Client: National Park Service | Permit type: Fixture; sign-free standing, excavation; telecom connection | Permit status: Issued | Expiration date: October 16, 2017 | Permit id: Pa157697 | |||||
SCORE 100 Stage l & 2 will close beach drive between shoreham drive and tilden street i parle road. The work will be divided into two phases to help facilitate the bike pedestrian detours; as well as, cross town traffic between porter street and piney branch parkway. This stage includes the reconstruction of beach drive (from sta. 99+ to sta. 195+00), the reconstruction of the rock creek trail (from sta. 99+ to sta. 159+ and from sta. 176+ to sta. 190+00), the construction of a new segment of the rock creek trail (from sta. 165+ to sta. 176+00), the rehabilitation of zoo tunnel bridge and the zoo tunnel (including sidewalk widening), the rehabilitation of the ramp to harvard street, street light replacement (sta. 99+ to sta. 111+40), and traffic signal replacement at the tilden street intersection, among other miscellaneous work. Access to the national zoo driveway and harvard street ramp will be closed. This plans have been reviewed and approved by mr. Trey dickerson form dc dot office of traffi Client: National Park Service | Permit type: Fixture; sign-free standing, excavation; telecom connection | Permit status: Issued | Expiration date: October 16, 2017 | Permit id: Pa157697 | |||||
SCORE 100 Fixture; sign-free standing, excavation; telecom connection (trench), over head work; aerial telecom connection, excavation; repair telecom service (excavation), excavation; telecom ml conduits (trench), excavation; tree space, if excav within tree canopy drip line, over head work; streetlight temporary removal, over head work; streetlight(s) installation, excavation; manhole installation Permit status: 9 | Expiration date: October 16, 2017 | Permit id: Pa157697 |