Building Permits at 9r Shepard St Brighton MA


Estimated Price

Beds

Baths

Rooms

Sq.Ft.

Built:   Lot size:   Taxed:
RENOVATION HISTORY
Based on the information received from building department, associated with 9r Shepard St Brighton MA over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
SCORE
56
Bfd application tank removal
Date:  November 25, 2015
Contractor: Steven Saracino

Client: Burke Catherine | Permit id: Bfdatr542268 | Parcel: 2205451000
2015/11/250569r Shepard St Brighton MaSteven Saracino
Sidewalk deposit during the demo of an existing structure and the building of a new one./ this is not a permit to excavate occupy or install driveway openings - separate permits are required.; deposit will remain in public works until the site is in walk-away condition.; upon written request a pwd engineer will inspect the site to verify that the restored sidewalks meet ada standards.; permit fee:; ; 60. 00; inspection fee :; 100. 00; deposit; 4 200. 00
Date:  December 10, 2015

Client: Burke Catherine | Permit type: Sidewalk deposit | Permit id: Sdep-546834 | Parcel: 2205451000
2015/12/100959r Shepard St Brighton Ma
Cut off service for demolition / 7 am to 4 pm; / weekdays only; / boston police area d; 343-4210; / no street closures allowed.; / guaranteed street; 8/27/2014
Date:  January 13, 2016

Client: Burke Catherine | Permit type: Excavation permit | Expiration date: February 2, 2016 | Permit id: Exca-553987 | Parcel: 2205451000
2016/01/130959r Shepard St Brighton Ma
Bfd smoke/co inspection and
Date:  July 14, 2015

Client: Burke Catherine | Expiration date: September 12, 2015 | Current use: 1unit | Permit id: Smk489293 | Parcel: 2205451000
2015/07/140959r Shepard St Brighton Ma
Cut &; cap existing water &; sewer; (2); 5 x 5 street only; guar 2015; 7am-4pm; boston police detail area d; 343-4210; jackies law permit on file
Date:  September 22, 2016

Client: Gasi Realty Llc | Permit type: Excavation permit | Expiration date: October 11, 2016 | Permit id: Exca-639050 | Parcel: 2205451000
2016/09/220959r Shepard St Brighton Ma
SCORE
56
Bfd asbestos removal
Date:  October 17, 2016
Contractor: Adrian Soriano

Client: Gasi Realty Llc | Permit id: Asb647562 | Parcel: 2205451000
2016/10/170569r Shepard St Brighton MaAdrian Soriano
SCORE
66
Demolition off all existing structures on the property. Existing structures include a two story wood frame single family dwelling and two small sheds.
Date:  November 3, 2016
Value:   $14,000
Contractor: Steven Saraceno

Client: Gasi Realty Llc | Permit type: Short form bldg permit | Expiration date: May 3, 2017 | Current use: 1-2fam | Permit id: Sf564988 | Parcel: 2205451000
2016/11/0314000669r Shepard St Brighton MaSteven Saraceno
Cut off service for demolition ; 7 am to 4 pm; ; weekdays only; ; boston police area d; 343-4210; ; no street closures allowed.; ; guaranteed street; 8 27 2014
Date:  January 13, 2016

Client: Gasi Realty Llc | Permit type: Excavation permit | Expiration date: February 2, 2016 | Permit id: Exca-553987 | Parcel: 2205451000
2016/01/130959r Shepard St Brighton Ma
Sidewalk deposit during the demo of an existing structure and the building of a new one. ; this is not a permit to excavate occupy or install driveway openings - separate permits are required.; deposit will remain in public works until the site is in walk-away condition.; upon written request a pwd engineer will inspect the site to verify that the restored sidewalks meet ada standards.; permit fee:; ; 60. 00; inspection fee :; 100. 00; deposit; 4 200. 00
Date:  December 10, 2015

Client: Gasi Realty Llc | Permit type: Sidewalk deposit | Permit id: Sdep-546834 | Parcel: 2205451000
2015/12/100959r Shepard St Brighton Ma
SCORE
94
2 boilers 2 range 2 fireplace
Date:  February 21, 2017
Value:   $2,000
Contractor: Iosif Drizik

Client: Gasi Realty Llc | Permit type: Gas permit | Expiration date: August 21, 2017 | Current use: 1-2fam | Permit id: G682390 | Parcel: 2205451000
2017/02/212000949r Shepard St Brighton MaIosif Drizik
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.