Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 94 Hvac change out - split system - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: December 16, 2016 Contractor: Anderson Heating And Air Conditioning Inc Permit type: Mechanical - hvac change out | Permit status: Issued | Permit id: Pds2016-Resalt- | |||||
SCORE 93 18 sq ft reroof of sfd if a re-roof project is proposed, the following specifications apply. Existing roofing material asphalt shingles & built-up roofing @ garage proposed roofing material asphalt shingles & built-up roofing @ garage manufacturer gaf brand and model birchwood crrc product id #0676-0096 & gaf tpo everguard (ul er1306 -01 color (if cool roof required) copper canyon crrc product id #0676-0097(asphalt shingles built-up roofing assembly system number per attached listing report &crrc product 10#0676 -0001 tpo white 9built-up) specific exemption from cool roof requirements (no required building inspector field verification (if applicable) yes complete re-roof note self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Permit type: Misc. (antennas, tennis cts, gazebo) | Permit status: Issued | Permit id: Pds2017-Resalt- | Parcel: 3960425200 | |||||
SCORE 89 Ground mount residential solar pv for existing sfd no. Of modules: 48 no. Of inverters: 2 total system size in kilowatts: 15. 7 Date: April 11, 2012 Contractor: Clary Solar Electric Systems Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 396-042-52-00 |