Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Total tear off and reroof of existing residential dwelling. Mil tpo, 9 squares, flat roof as indicated on permit application. Date: September 24, 2010 Contractor: Tiley Roofing Inc Client: Jay Simon | Applicant: Tiley Roofing, Inc. | Permit type: Roofing | Permit status: Cmp | Completion date: October 14, 2010 | Current use: Single family d | |||||
SCORE 95 Installation of a flush mount grid-tied 3 kw photovoltaic system. Array to remain below ridge, inside below hips and rake edges, and above eave. See engineerfoots letter and drawing for specific information. Date: October 4, 2013 Contractor: City Electric Inc Client: Jay Simon | Applicant: City Electric Inc | Permit type: Photovoltaic | Permit status: Cmp | Completion date: December 10, 2013 | Current use: Single family d | |||||
SCORE 95 Installation of a flush mount grid-tied 3 kw photovoltaic system. Array to remain below ridge, inside below hips and rake edges, and above eave. See engineerfoots letter and drawing for specific information. Client: Jay Simon | Permit type: Photovoltaic | Permit status: Cmp | Completion date: December 10, 2013 | Current use: Single family detached dwelling, existin | Permit id: Pmt2013-05197 | |||||
SCORE 100 Total tear off and reroof of existing residential dwelling. Mil tpo, 9 squares, flat roof as indicated on permit application. Client: Jay Simon | Permit type: Roofing | Permit status: Cmp | Completion date: October 14, 2010 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-04149 |