104 sq. Ft. Retaining walls Date: February 3, 2015 Value: $3,848 Permit type: Other : 3313 - acc - | Permit status: Permit issued | Permit id: Pds2015-Resalt- | |||||
SCORE 93 Roof mount residential solar pv for existing sfd (new 50a subpanel). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: October 10, 2014 Contractor: Lynne Landers Permit type: Electrical : 8002 - | Permit status: Permit finaled | Completion date: November 26, 2014 | Permit id: Pds2014-Resalt- | |||||
4000sf reroof comp over comp. If a re-roof project is proposed, the following specifications apply. Existing roofing material: comp proposed roofing material: comp manufacturer: owne corning brand and model: duration color (if cool roof required): shasta white built-up roofing assembly system number per attached listing report (if applicable): specific exemption from cool roof requirements (if applicable): required building inspector field verification (if applicable): note: self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Date: September 22, 2014 Value: $23,720 Permit type: Other : 33 - res - m | Permit status: Permit finaled | Completion date: December 2, 2014 | Permit id: Pds2014-Resalt- | |||||
104 sq. Ft. Retaining walls Date: February 3, 2015 Value: $3,848 Permit type: Residential alteration-addn | Permit status: Issued | Permit id: Pds2015-Resalt- | |||||
Roof mount residential solar pv for existing sfd (new 50a subpanel). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: October 10, 2014 Permit type: Residential alteration-addn | Permit status: Completed | Completion date: November 26, 2014 | Permit id: Pds2014-Resalt- | |||||
4000sf reroof comp over comp. If a re-roof project is proposed, the following specifications apply. Existing roofing material comp proposed roofing material comp manufacturer owne corning brand and model duration color (if cool roof required) shasta white built-up roofing assembly system number per attached listing report (if applicable) specific exemption from cool roof requirements (if applicable) required building inspector field verification (if applicable) note self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Date: September 22, 2014 Value: $23,720 Permit type: Residential alteration-addn | Permit status: Completed | Completion date: December 2, 2014 | Permit id: Pds2014-Resalt- | |||||
SCORE 96 Electric heat pump and or air conditioner replacement, no modifications or alterations to existing system Date: November 17, 2016 Contractor: Champion Air Conditioning And Heating Permit type: Residential alteration-addn | Permit status: Completed | Completion date: November 29, 2016 | Permit id: Pds2016-Resalt- | |||||
SCORE 100 Roof mount residential solar pv for existing sfd (new 50a subpanel). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: October 10, 2014 Contractor: N B Baker Electric Inc Permit type: Residential alteration-addn | Permit status: Completed | Completion date: November 26, 2014 | Permit id: Pds2014-Resalt- | |||||
Final Date: March 2, 2017 Permit status: Pass | Permit id: Pds2015-Resalt- | |||||
Final Date: November 22, 2016 Permit status: Pass | Permit id: Pds2016-Resalt- | |||||
Final Date: December 2, 2014 Permit status: Pass | Permit id: Pds2014-Resalt- |