Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 64 Structure is a boarding house. Convert guest rooms into 2 suites. Mech elec and plmb permits reqd. Tmb am Date: November 15, 2010 Permit status: Pass | Completion date: May 18, 2011 | Current use: Commercial | Permit id: Bld2010-07884 | |||||
SCORE 64 Remodel dwelling rooms to education room & enlarge check in office, remove south exit. Hist dist, interior remdel only. Dd ah Date: July 19, 2010 Permit status: Pass | Completion date: May 18, 2011 | Current use: Residential | Permit id: Bld2010-04898 | |||||
SCORE 61 Existing wet system - remodel 5 heads. Date: August 17, 2010 Permit type: Fire | Permit status: Pass | Completion date: December 15, 2010 | Current use: Commercial | Permit id: Bld2010-05623 | |||||
SCORE 61 Install two heat pumps Date: August 18, 2010 Contractor: Glacier Mechanical And Plg. Inc.Rmh Remodel Permit type: Mechanical | Permit status: Pass | Completion date: May 11, 2011 | Current use: Commercial | Permit id: Bld2010-05647 | |||||
SCORE 84 Historic landmark commission Date: July 26, 2016 Contractor: Johnson Powers Permit status: Active | Completion date: July 28, 2016 | Current use: Minor alteration | Permit id: Plnhlc2016-0059 | |||||
SCORE 59 Install 8 fixtures for conversion remodel project Date: March 16, 2011 Contractor: Mcd Plumbing, Llcronald Mcdonald House Permit type: Plumbing | Permit status: Pass | Completion date: May 17, 2011 | Current use: Commercial | Permit id: Bld2011-01519 | |||||
SCORE 64 Reducting fan coil and replacing fan coil Date: March 21, 2011 Contractor: Gunthers Incronald Mcdonald House Permit type: Mechanical | Permit status: Reviews not require | Completion date: March 21, 2011 | Current use: Commercial | Permit id: Bld2011-01619 | |||||
SCORE 64 Phase i new building built on now vacant gas station lot. Slab on grade with 4-stories of steel and wood construction. With approximately 10,0 square feet per floor, the new building will have around 40,0 total square feet. The new building is mostly masonry clad and has a flat membrane roof. The new building will also have a connection to the existing building to its east which will be remodeled under a separate permit as phase ii existing building remodel. Tco extention paid, good through 5 18 2014. Date: July 10, 2012 Permit status: Completed | Completion date: May 13, 2014 | Current use: Commercial | Permit id: Bld2012-04963 | |||||
SCORE 59 This is phase 2 of the ronald mcdonald house. This is a tenant finish. All pipe will remain and heads will be relocated and added based on new wall layout. Date: July 18, 2014 Contractor: Ronald Mcdonald House Phase 2 Tenant Finish Permit type: Fire | Permit status: No certificate req | Completion date: December 19, 2014 | Current use: Commercial | Permit id: Bld2014-05109 | |||||
SCORE 64 Interceptors Date: May 30, 2013 Permit type: Plumbing | Permit status: No certificate req | Completion date: May 9, 2014 | Current use: Commercial | Permit id: Bld2013-03537 | |||||
SCORE 64 Add to existing system at ronald mcdonald house Date: September 4, 2014 Permit type: Low voltage | Permit status: Pass | Completion date: December 22, 2014 | Current use: Commercial | Permit id: Bld2014-06428 | |||||
SCORE 59 Connector bridge between the existing rmh and the new rmh building already permitted in 2013. Date: April 5, 2013 Contractor: Crsaronald Mcdonald House Phase 1 Bridge Permit type: Accessory building | Permit status: Pass | Completion date: April 7, 2014 | Current use: Commercial | Permit id: Bld2013-02032 | |||||
SCORE 59 Remodel hvac system including new equipment Date: June 30, 2014 Contractor: Gunthers Comfort Airronald Mcdonald Ph2slc Permit type: Mechanical | Permit status: No certificate req | Completion date: December 19, 2014 | Current use: Commercial | Permit id: Bld2014-04595 | |||||
SCORE 59 Install 1 break sink & 1 janitor sink Date: August 19, 2010 Contractor: Mcd Plumbing, Llcronald Mcdonald House Rm #35 Permit type: Plumbing | Permit status: Pass | Completion date: May 18, 2011 | Current use: Residential | Permit id: Bld2010-05668 | |||||
SCORE 74 Complete fire alarm system. These are revised drawings from a previous permit app bld2013-00312. Date: April 25, 2013 Contractor: Powered Control Systemsronald Mcdonald House Permit type: Low voltage | Permit status: No certificate req | Completion date: May 9, 2014 | Current use: Commercial | Permit id: Bld2013-02576 | |||||
SCORE 64 Remodel of existing ronald mcdonald house Date: June 23, 2014 Contractor: Jp Electricalronald Mcdonald House Phase 2 Permit type: Electrical | Permit status: Completed | Completion date: December 19, 2014 | Current use: Commercial | Permit id: Bld2014-04372 | |||||
SCORE 64 No inspections allowed until balance is paid, credit card declined 43-bathtubs, 5-washers, 2-drinking fountain, 1-shower, 1-kitchen sink, 2-urinals, 52-lavs, 44-water closet flush tank 1. 6, 10-water closet flushometer 1. 6, 4-water heater, 20- drains, 4-hose bibbs sillcock. Phase i new building. Date: May 17, 2013 Permit type: Plumbing | Permit status: Completed | Completion date: May 9, 2014 | Current use: Commercial | Permit id: Bld2013-03225 | |||||
SCORE 64 Hvac installation -plan, spec & install city multi with ervs, makeup air for hood & exhaust fans, & makeup air system Date: August 13, 2013 Contractor: Gunthers Comfort Airronald Mcdonald Addition Permit type: Mechanical | Permit status: Completed | Completion date: May 9, 2014 | Current use: Commercial | Permit id: Bld2013-05713 | |||||
SCORE 74 Temp power permit Date: January 10, 2013 Contractor: Scotvale Electricalronald Mcdonald House Permit type: Electrical | Permit status: No certificate req | Completion date: May 9, 2014 | Current use: Commercial | Permit id: Bld2013-00169 | |||||
SCORE 64 Install 2 new water heaters Date: January 17, 2013 Contractor: Glacier Mechanical And Plg. Inc.Rhm Permit type: Mechanical | Permit status: Pass | Completion date: December 1, 2014 | Current use: Commercial | Permit id: Bld2013-00316 | |||||
SCORE 74 Not profit center housing. Date: January 17, 2013 Contractor: Powered Control Systemsronald Mcdonald House Permit type: Low voltage | Permit status: Completed | Completion date: May 9, 2014 | Current use: Commercial | Permit id: Bld2013-00312 | |||||
SCORE 64 (1) flat sign a. A. Date: January 29, 2014 Contractor: Thomas And Sons Llcronald Mcdonald House Permit type: Sign | Permit status: Pass | Completion date: March 25, 2014 | Permit id: Bld2014-00595 | |||||
SCORE 59 7-valves Date: April 24, 2014 Contractor: Kevin Hull Landscapingrmh Phase 2 Permit type: Plumbing | Permit status: No certificate req | Completion date: December 19, 2014 | Current use: Commercial | Permit id: Bld2014-02716 | |||||
SCORE 61 Elec work for remodel Date: August 17, 2010 Contractor: Mdw Electric Incronald Mcdonald House Rm #35 Permit type: Electrical | Permit status: Pass | Completion date: May 18, 2011 | Current use: Residential | Permit id: Bld2010-05610 | |||||
SCORE 74 Electrical wiring to new construction. Temp power, power to panel, and fire alarm to be authorized by seperate permits. Date: January 10, 2013 Contractor: Scotvale Electricalronald Mcdonald House Permit type: Electrical | Permit status: Completed | Completion date: May 9, 2014 | Current use: Commercial | Permit id: Bld2013-00175 | |||||
SCORE 64 Fire line Date: May 22, 2013 Contractor: Staker And Parson Companiesronald Mcdonald House Permit type: Fire | Permit status: Completed | Completion date: May 9, 2014 | Current use: Commercial | Permit id: Bld2013-03371 | |||||
SCORE 64 Hood Date: November 12, 2013 Permit type: Fire | Permit status: Completed | Completion date: May 9, 2014 | Current use: Commercial | Permit id: Bld2013-08376 | |||||
SCORE 97 New system in ronald mcdonald house Date: March 21, 2013 Contractor: Ronald Mcdonald House Permit type: Fire | Permit status: No certificate req | Completion date: May 9, 2014 | Current use: Commercial | Permit id: Bld2013-01648 | |||||
SCORE 64 Remodel of existing ronald mcdonald house Date: June 24, 2014 Permit type: Plumbing | Permit status: No certificate req | Completion date: December 19, 2014 | Current use: Commercial | Permit id: Bld2014-04441 | |||||
SCORE 59 Remodel of the existing rmh building - not a change in use. Date: December 9, 2013 Contractor: R And O Construction Companyrmh Phase 2 Permit status: Cert occ no warranty | Completion date: December 19, 2014 | Current use: Commercial | Permit id: Bld2013-09035 | |||||
SCORE 56 Installing solar panels on the existing flat roof of the west building on the ronald mcdonald house site and solar panels on a new, 99 x 16 carport structure in the northeast corner of the parking lot behind the east building. Date: July 26, 2016 Permit type: Historic landmark commission | Permit status: Closed | Completion date: August 18, 2016 | Current use: Minor alteration | Permit id: Plnhlc2016-0059 | |||||
SCORE 59 Reroof per plnhlc2015-00841 Date: October 14, 2015 Contractor: North Face Contracting, Incronald Mcdonald House Permit type: Roofing | Permit status: Closed | Completion date: April 26, 2016 | Current use: Commercial | Permit id: Bld2015-08608 | |||||
SCORE 56 Property is in a local historic district. Please contact planning for a coa 801-535-77 install 50, kw solar system on the roof of ronald mcdonald house charities. (1 - 2 watt panels on west side, - 2 watt panels on east side). Date: July 20, 2016 Contractor: Johnson Powersronald Mcdonald House Charities Permit type: Solarpv | Permit status: Need info | Completion date: August 1, 2016 | Current use: Commercial | Permit id: Bld2016-06790 | |||||
SCORE 64 Remodel 1 room & bath, change out plmb & elec. Also install elec radiant heat in bahtroom floor (tub to remain) smoke & co alarms must meet current code, tub valve to be replaced. Rmf-35 multifamily. Gs ju Date: January 22, 2010 Permit status: Pass | Completion date: May 6, 2013 | Current use: Residential | Permit id: Bld2010-00331 |