Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 Perform the necessary electrical demo including removing all the existing light fixtures rework electrical above the suspended ceiling to bring all work up to code furnish and install twenty-seven 2x4 3-lamp troffers in the ne corner (the ceiling part) furnish and install thirty-four 2x4 3-lamp troffers in the se corner. Install new lights suspended with jack chain. Furnish and install fourteen new wall mounted occupancy sensors wire four new 3-way switches to control the lighting in the open areas wire four new single pole switches to control the lighting in the two conference rooms wire up to six new duplex receptacles wire five furniture hookups furnish and install one poke thru style floor box for the reception desk Date: December 5, 2014 Contractor: John Williams Permit type: Commercial electrical | Permit status: Issued | Permit id: Elc-14-11599 | |||||
Office Date: September 15, 2015 Value: $35,000 Permit type: Plans required - commercial remodel existing space | Permit status: Issued | Permit id: Bld-15-07078 | |||||
Cramer kreski designs Date: December 28, 2015 Permit type: Building - certificate of occupancy | Permit status: Closed | Permit id: Coo-15-00576 | |||||
SCORE 95 Cramer kreski designs #200-ductwork Date: November 18, 2015 Contractor: Michael Hynek Permit type: Commercial air conditioning air distribution systems | Permit status: Issued | Permit id: Mec-15-08806 | |||||
SCORE 95 Embassy tower #200-9-new semi-recessed chrome heads, 7-relocated heads. Dwc-163214 Date: October 26, 2015 Contractor: Jason Brown Permit type: Fire sprinkler/chemical/control systems | Permit status: Issued | Permit id: Mec-15-08170 | |||||
SCORE 95 Embassy tower-remodel floors 1,2,3- add heads, relocate 16 heads Date: October 8, 2015 Contractor: Jeff Gamm Permit type: Fire sprinkler/chemical/control systems | Permit status: Issued | Permit id: Mec-15-07633 | |||||
SCORE 95 Embassy tower 2nd fl-relocated sprinkler heads Date: December 22, 2014 Contractor: Jeff Gamm Permit type: Fire sprinkler/chemical/control systems | Permit status: Issued | Permit id: Mec-14-10077 | |||||
SCORE 95 Embassy tower-1st fl nw office-3 new heads, 2 relocated heads. Dwc-150512 Date: January 21, 2015 Contractor: Jason Brown Permit type: Fire sprinkler/chemical/control systems | Permit status: Issued | Permit id: Mec-15-00497 | |||||
SCORE 100 Northwestern mutual-2-hooking hydronic lines on 1 new hp & 1 existing hp Date: December 24, 2015 Contractor: Steve Pitlor Permit type: Hydronic/process/ammonia piping systems | Permit status: Issued | Permit id: Mec-15-09705 | |||||
Hydronic piping systems Date: March 1, 2016 Permit type: Hydronic/process/ammonia piping systems | Permit status: Issued | Permit id: Mec-16-01414 | |||||
SCORE 93 Lake superior consulting - office Permit type: Plans required - commercial remodel existing space | Permit status: Issued | Permit id: Bld-14-12117 | |||||
SCORE 97 Relocating a break room sink to an adjacent wall. Date: December 26, 2014 Contractor: David Simon Permit type: Commercial plumbing | Permit status: Issued | Permit id: Plb-14-08263 | |||||
SCORE 93 Embassy tower - common areas Permit type: Plans required - commercial remodel existing space | Permit status: Issued | Permit id: Bld-15-08817 | |||||
SCORE 99 Redo front ground lingting Date: July 6, 2011 Contractor: David Hoffman Permit type: Commercial electrical | Permit status: Issued | Permit id: Elc-11-05149 | |||||
SCORE 100 Electrical wiring for partial remodels on 3rd and 5th floors Date: November 2, 2015 Contractor: Steven Brase Permit type: Commercial electrical | Permit status: Issued | Permit id: Elc-15-09741 | |||||
SCORE 100 Northwestern mutual-water source hp 2 ton, mitzibishi split system 1. 5 ton Date: November 25, 2015 Contractor: David Hodges Permit type: Commercial air conditioning air distribution systems | Permit status: Issued | Permit id: Mec-15-09035 | |||||
SCORE 95 Northwestern mutual - office Permit type: Plans required - commercial remodel existing space | Permit status: Issued | Permit id: Bld-15-09183 | |||||
SCORE 100 Renovating first, second and third floor lobbies Date: September 23, 2015 Contractor: Steven Brase Permit type: Commercial electrical | Permit status: Issued | Permit id: Elc-15-08494 | |||||
SCORE 91 Xerox - office Permit type: Plans required - commercial remodel existing space | Permit status: Issued | Permit id: Bld-15-00299 | |||||
SCORE 82 Add some new outlets change some lights out Date: January 29, 2015 Contractor: Larry Koubsky Permit type: Commercial electrical | Permit status: Issued | Permit id: Elc-15-00783 | |||||
SCORE 100 Cb richard ellis/mega corp #150-ductwork, duct exhaust fan for it room 500cfm Date: January 22, 2015 Contractor: Gary Reiss Permit type: Commercial air conditioning air distribution systems | Permit status: Issued | Permit id: Mec-15-00556 | |||||
Remodel of suite 2 - circuits for new lights and outlets Date: November 16, 2015 Permit type: Commercial electrical | Permit status: Issued | Permit id: Elc-15-10186 | |||||
SCORE 82 Northwestern mutual #500-arm over & relocate fire sprinkler heads as needed for new ceiling layout. No 200# hydrostatic test, cannot isolate drops. Date: January 5, 2016 Contractor: J Alonso Permit type: Fire sprinkler/chemical/control systems | Permit status: Issued | Permit id: Mec-15-09394 | |||||
3rd floor pull and reset sink, new sink, water heater. 5th floor (3) pull and resets of sinks Date: November 23, 2015 Permit type: Commercial plumbing | Permit status: Issued | Permit id: Plb-15-07787 |