SCORE 93 [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] install 4 kw solar system on roof Date: January 30, 2014 Contractor: Solterra Systems Permit type: Electrical | Permit status: Permit closed | Completion date: February 13, 2014 | Expiration date: January 30, 2015 | Current use: Single family / duplex | Permit id: 6402263 | |||||
SCORE 100 Install sub-panel in garage and install (1) dedicated amp circuit for evse. Date: November 10, 2011 Contractor: Holmes Electric Company Permit type: Electrical | Permit status: Permit closed | Completion date: November 17, 2011 | Expiration date: November 9, 2012 | Current use: Single family / duplex | Permit id: 6301753 |