Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 Dupont: ti office to labs office b occupancy 12,5 sf ada upgrades, exterior asphalt slot adjustments, bathroom modifications, ada door modifications (( phase ii )) Permit status: Permit issued | Permit id: 13000-02937 | |||||
SCORE 59 Genencor: add new equipment platform, five (5) new process piping systems for air, steam, drain. Add two (2) new tranformers, electrical sub panels, and uninterupted power supplies (ups). Date: September 20, 2012 Contractor: Intergrated Engineering Services Permit status: Permit issued | Permit id: 12000-02362 | |||||
SCORE 95 13000-02937: ammr hazardous material control areas (( fees paid on 13000-02937 )) Date: December 20, 2013 Contractor: Owner Builder Permit status: Permit issued | Permit id: 13rev-00790 | |||||
SCORE 96 Commercial rooftop hvac installation and relocation of industrial hot water heater system on roof (( phase i )) Date: September 30, 2013 Contractor: Dome Construction Corporation Permit status: Permit issued | Permit id: 13000-02604 | |||||
SCORE 59 Disconnect and remove existing ups (located in d-148) from panel pu-1 and pu2 feeder circuit (located in d-102). Refeed pu1 and pu2 directly from transformer te located in room d-107 Date: September 23, 2013 Contractor: Mnr Enterprises Inc Systems Electric Permit status: Permit issued | Permit id: 13000-02544 | |||||
SCORE 59 Replacement of an interior 1000l tank with a 2000l tank which holds a glucose liquid comprised of 45% sugar and 55% water Date: February 25, 2013 Contractor: Chavez Welding And Machining Inc Permit status: Permit issued | Permit id: 13000-00513 | |||||
SCORE 99 Equipment replacement for genencor. Replace (2) chillers in similar location Date: December 11, 2012 Contractor: Johnson Controls Inc Permit status: Permit issued | Permit id: 12000-03011 | |||||
SCORE 59 Dupont genencor: install (n) aqueous ammonia storage and supply system and associate infrastructure and (n) 30amp electric panel (n) concrete pad Permit status: Permit issued | Permit id: 17000-01753 | |||||
Ti for existing tenant "dupont" (14,0 sf), scope of work includes expanding (e) fermentation area and adding additional labratory use. Scope of work includes adding new rooftop equipment, Date: August 10, 2017 Value: $2,304,633 Permit status: Approved | Permit id: 17000-01902 | |||||
SCORE 96 Provide power to temporary construction trailer (single wide) from existing panel at loading dock at building 925 Date: November 13, 2017 Contractor: Dome Construction Corporation Permit status: Permit issued | Permit id: 17000-02712 | |||||
SCORE 59 17000-01753: deferred submittal includes piping with in building to fermentation tanks and lab hood. Install leak detection system w auto shutdown. Install (2) new eye wash and safety showers. Date: October 24, 2017 Permit status: Permit issued | Permit id: 17rev-00687 | |||||
17000-01902: revision to add grade beam designation for two future frames to be added in future Date: December 7, 2017 Permit status: Completed | Permit id: 17rev-00767 |