Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Reroof for existing sfd. If a re-roof project is proposed, the following specifications apply. Existing roofing material comp shingle proposed roofing material comp shingle manufacturer owens corning brand and model duration premium color (if cool roof required) shasta white built-up roofing assembly system number per attached listing report (if applicable) na specific exemption from cool roof requirements (if applicable) na required building inspector field verification (if applicable) na note self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Date: August 3, 2015 Value: $15,418 Permit type: Residential alteration-addn | Permit status: Completed | Completion date: August 25, 2015 | Permit id: Pds2015-Resalt- | |||||
SCORE 89 Reroof for existing sfd. If a re-roof project is proposed, the following specifications apply. Existing roofing material comp shingle proposed roofing material comp shingle manufacturer owens corning brand and model duration premium color (if cool roof required) shasta white built-up roofing assembly system number per attached listing report (if applicable) na specific exemption from cool roof requirements (if applicable) na required building inspector field verification (if applicable) na note self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Permit type: Residential alteration-addn | Permit status: Completed | Completion date: August 25, 2015 | Permit id: Pds2015-Resalt- | |||||
Final Date: August 21, 2015 Permit status: Pass | Permit id: Pds2015-Resalt- |