27 sf re-roof () if a re-roof project is proposed, the following specifications apply. Existing roofing material comp shingles proposed roofing material comp shingles manufacturer gaf brand and model timberline hd color (if cool roof required) birchwood built-up roofing assembly system number per attached listing report (if applicable) n/a specific exemption from cool roof requirements (if applicable) n/a required building inspector field verification (if applicable) n/a note self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Date: October 6, 2015 Value: $16,011 Permit type: Residential alteration-addn | Permit status: Completed | Completion date: October 9, 2015 | Permit id: Pds2015-Resalt- | |||||
Roof mount residential solar pv for existing sfd with existing residential main electrical service upgrade - 125a - the scope of work is limited to upgrade of the existing main service panel. No new sub-panels or relocation permitted. Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: August 27, 2015 Permit type: Residential alteration-addn | Permit status: Completed | Completion date: November 18, 2015 | Permit id: Pds2015-Resalt- | |||||
SCORE 99 Hvac change out - split system - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: March 29, 2016 Contractor: M N Mauzy Mechanical Inc Permit type: Residential alteration-addn | Permit status: Completed | Completion date: May 4, 2016 | Permit id: Pds2016-Resalt- | |||||
SCORE 93 27 sf re-roof () if a re-roof project is proposed, the following specifications apply. Existing roofing material comp shingles proposed roofing material comp shingles manufacturer gaf brand and model timberline hd color (if cool roof required) birchwood built-up roofing assembly system number per attached listing report (if applicable) n a specific exemption from cool roof requirements (if applicable) n a required building inspector field verification (if applicable) n a note self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Permit type: Residential alteration-addn | Permit status: Completed | Completion date: October 9, 2015 | Permit id: Pds2015-Resalt- | |||||
SCORE 91 Roof mount residential solar pv for existing sfd with existing residential main electrical service upgrade - 125a - the scope of work is limited to upgrade of the existing main service panel. No new sub-panels or relocation permitted. Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: August 27, 2015 Contractor: Raneri And Long Building Specialties Inc Permit type: Residential alteration-addn | Permit status: Completed | Completion date: November 18, 2015 | Permit id: Pds2015-Resalt- | |||||
Final Date: May 3, 2016 Permit status: Pass | Permit id: Pds2016-Resalt- | |||||
Final Date: November 17, 2015 Permit status: Pass | Permit id: Pds2015-Resalt- |