Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Alteration permit Date: January 9, 2017 Client: Chelsea Zhang 2016 Invest | Permit status: Active | Permit id: 744271 | |||||
Demolition permit Date: October 11, 2016 Client: Chelsea Zhang 2016 Invest | Permit status: Active | Permit id: 728283 | |||||
Plumbing permit Date: November 3, 2016 Client: Chelsea Zhang 2016 Invest | Permit status: Active | Permit id: 734116 | |||||
SCORE 96 For the interior demolition of non load-bearing partition walls and ceilings as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans Date: October 11, 2016 Contractor: Studio 8 General Contracting Client: Chelsea Zhang 2016 Invest | Permit type: Demolition permit | Permit status: Completed | Completion date: May 19, 2017 | Permit id: 728283 | |||||
SCORE 100 Remodel 3-water closets,3-tub showers,3-lav and 3-kitchen sinks. The installation will comply with the philadephia plubming code 2004 Date: November 3, 2016 Contractor: Qq Construction Inc Client: Chelsea Zhang 2016 Invest | Permit type: Plumbing permit | Permit status: Completed | Completion date: October 13, 2017 | Permit id: 734116 | |||||
SCORE 96 For alterations in an existing structure to include new rated stair enclosure assembly, new rated horizontal floor ceiling assemblies, interior wall assemblies, and wall floor ceiling finishing. (iebc 2009, compliance method: work-area method, lvl iii alterations) separate permits reqd for plumbing, electrical, and fire suppression system alterations. Date: January 9, 2017 Contractor: Studio 8 General Contracting Client: Chelsea Zhang 2016 Invest | Permit type: Alteration permit | Permit status: Completed | Completion date: October 13, 2017 | Permit id: 744271 | |||||
SCORE 100 Re-wire a multifamily dwelling as per 2008 nec. Install light fixtures. Relocate outlets and 35 switches. 2 a electrical service. Date: April 4, 2017 Contractor: Qq Construction Inc Client: Chelsea Zhang 2016 Invest | Permit type: Electrical permit | Permit status: Expired | Completion date: April 4, 2017 | Permit id: 749813 | |||||
SCORE 89 Install 3 hvac units with ductwork (multifamily) Date: February 1, 2017 Contractor: Lcd Heating And Air Conditioning Client: Chelsea Zhang 2016 Invest | Permit type: Mechanical permit | Permit status: Completed | Completion date: October 13, 2017 | Permit id: 755438 | |||||
SCORE 89 Installation of an automatic wet sprinkler system with backflow prevention device, fire department connection and two inch (2") fire service line in accordance with npfa 13-r throughout a three (3) story structure with basement (3-family). Separate permits required for any plumbing and electrical work. Date: March 23, 2017 Contractor: Aqueduct Fire Protection Client: Chelsea Zhang 2016 Invest | Permit type: Suppression permit | Permit status: Completed | Completion date: October 13, 2017 | Permit id: 759374 |