Building Permits at 902 H Street Ne Washington DC


Estimated Price

Beds

Baths

Rooms

Sq.Ft.

Built:   Lot size:   Taxed:
RENOVATION HISTORY
Based on the information received from building department, associated with 902 H Street Ne Washington DC over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
SCORE
100
Excavation; gas main line (trench), excavation; gas connection (trench)
Date:  July 7, 2010
Contractor: Washington Gas

Permit status: 8 | Expiration date: August 3, 2010 | Permit id: Pa55713
2010/07/070100902 H Street Ne Washington DcWashington Gas
SCORE
100
Install approx. 2,3 of plastic gas main and abandon in place approx. 2,3 of plastic gas main at 902 h st. Ne between 9th st. Ne and florida ave. Ne., permit #111966, wr #834174, bca #5084-1. Attached plans and conditions are part of this permit. This work related to d. Dot project (street car project h st ne) per sub sec. 225. 6 no permit fee should be charged to a public utility. The proposed work must be completed within 22 calendar days. The duration of this permit is 22 calendar days. Washington gas shall pay all indirect and direct costs, including any delays and cost associated with any claim brought against ddot and/ or ddots contractors due to the proposed work. Washington gas must coordinate the proposed work with ddot and ddots contractor and check in daily at 1322 h street at the project office. Washington gas construction cannot impact on street parking in the 1100-14 block of h street ne. Ddot maintenance of traffic ("mot") plan. Washington shall provide an on site public re
Date:  May 26, 2010
Contractor: Washington Gas

Permit type: Excavation; gas main line (trench), excavation; gas connection (trench) | Permit status: Permit expired | Expiration date: August 3, 2010 | Permit id: Pa55713
2010/05/260100902 H Street Ne Washington DcWashington Gas
SCORE
95
Install approx. 13 of plastic gas main and abandon in place approx. 13 plastic gas main at 902 h st. Ne between 10th st. Ne and 13th st. Ne., permit # 111966, wr # 834174, bca # 5084-1. Attached plans and conditions are part of this permit. This work related to ddot project (street car project h st. Ne) per sub sec. 2256 no permit fee should be charged to a public utility. The duration of this permit is 22 calendar days. Ddot upon request by washington gas for good cause can issue another permit. Ddot will extend the standard construction-day to 12-hour workdays/6 days per week, but only for that portion of the permitted work being performed behind concrete work barriers. Washington gas must coordinate all proposed work with ddot and ddots contractor and check in daily at 1322 h street at the project office. Washington gas construction representative must coordinate with capitol paving to ensure that restrictions of on-street parking during business hours is limited to the immediate co
Date:  June 30, 2010

Permit type: Excavation; gas main line (trench), excavation; multiple house connections (utility co. Only) | Permit status: Permit expired | Expiration date: August 12, 2010 | Permit id: Pa56310
2010/06/30095902 H Street Ne Washington DcWash Gas And Light Co
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.