Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 Install 8 conduit, sidewalk at the southeast corner of 2nd & i streets, n. E., as indicated on the attached approved prints. Wr #5-3327044, cut #592, rcb. Restoration per ddot standards. Contact area assigned ddot/ufa arborist before work to consult regarding urban forest concerns. Applicant must follow all twzt notes including sidewalk only closed for 2 days maximum. Expiration date for permit and tcps as approved must be same date. Date: January 28, 2010 Contractor: Pepco Phi Holdings Inc Client: Pepco | Permit type: Excavation; electric ml conduit (trench) | Permit status: Permit expired | Expiration date: March 13, 2010 | Permit id: Pa53681 | |||||
SCORE 95 1st-extension of permit#pa53681. Install 8 conduit, sidewalk at the southeast corner of 2nd & i streets, n. E., as indicated on the attached approved prints. Wr #5-3327044, cut #592, rcb. Restoration per ddot standards. Contact area assigned ddot/ufa arborist before work to consult regarding urban forest concerns. Applicant must follow all twzt notes including sidewalk only closed for 2 days maximum. Expiration date for permit and tcps as approved must be same date. All permit renewal policies and procedures must be followed as outlined on back page of application. Date: March 1, 2010 Contractor: Pepco Phi Holdings Inc Client: Pepco | Permit type: Excavation; electric ml conduit (trench) | Permit status: Permit expired | Expiration date: April 14, 2010 | Permit id: Pa53681-R1 | |||||
SCORE 95 1st-extension of permit#pa53681. Install 8 conduit, sidewalk at the southeast corner of 2nd & i streets, n. E., as indicated on the attached approved prints. Wr #5-3327044, cut #592, rcb. Restoration per ddot standards. Contact area assigned ddot/ufa arborist before work to consult regarding urban forest concerns. Applicant must follow all twzt notes including sidewalk only closed for 2 days maximum. Expiration date for permit and tcps as approved must be same date, and is solely the responsibility of the permittee. All permit renewal policies and procedures must be followed as outlined on back page of application. Applicant must continue to very closely coordinate work with ddot/ipma. Date: April 7, 2010 Contractor: Pepco Phi Holdings Inc Client: Pepco | Permit type: Excavation; electric ml conduit (trench) | Permit status: Permit expired | Expiration date: October 14, 2010 | Permit id: Pa53681-R2 | |||||
SCORE 95 Install 8 conduit, sidewalk at the southeast corner of 2nd & i streets, n. E., as indicated on the attached approved prints. Wr #5-3327044, cut #592, rcb. Restoration per ddot standards. Contact area assigned ddot ufa arborist before work to consult regarding urban forest concerns. Applicant must follow all twzt notes including sidewalk only closed for 2 days maximum. Expiration date for permit and tcps as approved must be same date. Date: January 28, 2010 Contractor: Pepco Phi Holdings, Inc Client: Pepco | Permit type: Excavation; electric ml conduit (trench) | Permit status: Permit expired | Expiration date: March 13, 2010 | Permit id: Pa53681 | |||||
SCORE 95 1st-extension of permit#pa53681. Install 8 conduit, sidewalk at the southeast corner of 2nd & i streets, n. E., as indicated on the attached approved prints. Wr #5-3327044, cut #592, rcb. Restoration per ddot standards. Contact area assigned ddot ufa arborist before work to consult regarding urban forest concerns. Applicant must follow all twzt notes including sidewalk only closed for 2 days maximum. Expiration date for permit and tcps as approved must be same date. All permit renewal policies and procedures must be followed as outlined on back page of application. Date: March 1, 2010 Contractor: Pepco Phi Holdings, Inc Client: Pepco | Permit type: Excavation; electric ml conduit (trench) | Permit status: Permit expired | Expiration date: April 14, 2010 | Permit id: Pa53681-R1 | |||||
SCORE 95 1st-extension of permit#pa53681. Install 8 conduit, sidewalk at the southeast corner of 2nd & i streets, n. E., as indicated on the attached approved prints. Wr #5-3327044, cut #592, rcb. Restoration per ddot standards. Contact area assigned ddot ufa arborist before work to consult regarding urban forest concerns. Applicant must follow all twzt notes including sidewalk only closed for 2 days maximum. Expiration date for permit and tcps as approved must be same date, and is solely the responsibility of the permittee. All permit renewal policies and procedures must be followed as outlined on back page of application. Applicant must continue to very closely coordinate work with ddot ipma. Date: April 7, 2010 Contractor: Pepco Phi Holdings, Inc Client: Pepco | Permit type: Excavation; electric ml conduit (trench) | Permit status: Permit expired | Expiration date: October 14, 2010 | Permit id: Pa53681-R2 | |||||
SCORE 98 Construction staging area Date: May 15, 2015 Contractor: Anchor Construction Permit status: Expired | Expiration date: July 15, 2015 | Permit id: Pa10178781-R1 | |||||
SCORE 95 Excavation; electric ml conduit (trench) Date: January 29, 2010 Contractor: Pepco Phi Holdings, Inc Permit status: 8 | Expiration date: March 13, 2010 | Permit id: Pa53681 | |||||
SCORE 98 Construction staging area Date: March 3, 2015 Contractor: Anchor Construction Permit status: Permit expired | Expiration date: May 15, 2015 | Permit id: Pa10178781 |