| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Permit id: 09-07-081 | Parcel: 058330004000 | |||||
Permit id: 10-07-033 | Parcel: 058330004000 | |||||
Ug tank removal Permit id: 80-3091 | |||||
City wo#10002. 26 pot holes to locate pg&e gas lines for the bridge district infrastructure improvements. Pot holes wil be patched with set 45 (dot approved) patching concrete mix with black dye on road surface & natural color for sidewalk & curb applications. Permit expires march 11, 2009 ( working days) a preconstruction meeting is required call (916) 617-4692. All work shall comply with city standards and details. Final engineering encroachment inspection is required. Any damage to Permit id: 09-0065 | Parcel: 058330004000 | |||||
City wo# 10002 - bridge district infrastructure improvement project. Geotech test borings: one at riske lane (d5), one at drever st (d1) and 7 borings on s. River rd. (d3, d4, d11, d15, d16, d18-19) soil borings will be drilled to depths ranging from - bgs. Boring will be restored with slurry grout. Upper portion of borings will be completed with a 4" thick quick-set portland cement concrete. 4 20 09... Ammended to add 5 additional borings (4a thru 4e) within the row along riske lane. Permit id: 09-0069 | Parcel: 058330004000 | |||||
City wo#10002. Excavation of 41 pot holes to locate kinder morgan pipeline for the bridge district infrastructure improvements. Pot holes will be air knifed and patched with set 45 (dot approved) patching concrete mix with black dye on road surface & natural color for sidewalk & curb applications. Permit expires march 23, 2009 ( working days) a preconstruction meeting is required call (916) 617-4692. All work shall comply with city standards and details. Final engineering encroac Permit id: 09-0072 | Parcel: 058330004000 | |||||
SCORE 100 Wo#99022 pm#30706474. Excavate (1) 4 x 4 bell-hole on south river rd. (across the freeway ramp) to deactivate on idle 3 4" steel gas service. Bell hole and backfill shall meet or exceed citys standard detail 110. A pre-construction meeting is required call (916) 617-4692. All work shall comply with city standards and details. Final engineering encroachment inspection is required. Any damage to the curb, gutter, sidewalk or landscape will be repaired. Permit id: 09-0126 | Parcel: 058330004000 | |||||
Wo#52018 demolition of existing structure. (john sneed - proj. Mgr) Permit id: 09-0201 | Parcel: 058330004000 | |||||
The bridge district phase 1 scope of work includes: demolition of streets, grading, new streets, sidewalk infiltration, street lights, irrigation, landscaping and joint trench. Provide 4" sewer service and 2" water service to construction trailer. All work within the right-of-way shall be constructed per state and federal accessibility standards. A preconstruction meeting is required call (916) 617-4692. All work shall comply with city standards and details. Final engineering encroachment i Permit id: 10-0232 | Parcel: 058330004000 | |||||
SCORE 100 City wo# 10002 - pm 30711388bridge district infrastructure improvement project. Remove 6 powr poles at locations 706,707,710,711, 712 and 713 on drawing e-5. Install 4 poles at locations 801, 804., 806 and 811. Permit id: 10-0259 | Parcel: 058330004000 | |||||
SCORE 100 City wo# 10002 - pm 30711385bridge district infrastructure improvement project. Remove overhead facilities at the intersections of ballpark, riverfront and tower bridge gateway. Temporary road closures will be required to remove wires once cut from the poles. Mr. Hansen has approved the use of flagmen for the temporary closures. Closures should not exceed 5 minutes. Permit id: 11-0204 | Parcel: 058330004000 |