Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 Request for expedite. Replace broken down service conduit(97) at 9 south capitol street, s. E.; sidewalk and roadway of south capitol street, s. E. And "i" street. S. W. As indicated on the attached prints. Applicant considers this a "pre-emergency" wr #3331833. Applicant must follow all attached and approved tcps including work time which is 9: a. M. Through 3: p. M. Monday thru friday. Applicant accepts that the restoration standards must ensure the work and workmanship is is as good or better than before work began, and may be extensive and be inspected and approved by ddot inspector. Cut #26635 (gjn) tcp#s 5, 11, 12 Date: April 9, 2010 Contractor: Pepco Phi Holdings Inc Client: Pepco Holdings Inc | Permit type: Excavation; electric connection (trench) | Permit status: Permit expired | Expiration date: August 19, 2010 | Permit id: Pa54825 | |||||
SCORE 95 Renewal request to complete the final portion of the restoration only. Request for expedite. Replace broken down service conduit(97) at 9 south capitol street, s. E.; sidewalk and roadway of south capitol street, s. E. And "i" street. S. W. As indicated on the attached prints. Applicant considers this a "pre-emergency". Must adhere to approved, and attached tcpsr #3331833. Applicant must follow all attached and approved tcps. Date for tcps must match with permit date. Applicant accepts that the restoration standards must ensure the work and workmanship is is as good or better than before work began, and may be extensive and be inspected and approved by ddot inspector. Cut #26635 (gjn) tcp#s 5, 11, 12. Please coordinate with ipma management regarding final completion, and restoration (mr. Ali shakeri) Date: August 31, 2010 Contractor: Pepco Phi Holdings Inc Client: Pepco Holdings Inc | Permit type: Excavation; electric connection (trench) | Permit status: Permit expired | Expiration date: November 18, 2010 | Permit id: Pa54825-R1 | |||||
SCORE 95 Excavation; electric connection (trench) Date: May 18, 2010 Contractor: Pepco Phi Holdings Inc Permit status: 8 | Expiration date: August 19, 2010 | Permit id: Pa54825 |