Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Date: September 1, 2015 Contractor: James Dipalma Client: John Chatzky | Client Address: 955 East 163rd Street Bronx Ny 10459 | Client Phone: (214) 748-3647 | Client Company: Maria Estela Houses Ii Assoc. | Expiration date: August 31, 2016 | Permit id: 220451348 | |||||
SCORE 96 Date: August 10, 2015 Contractor: Simranpal Singh Client: John Chatzky | Client Address: Bank Street White Plains Ny 10606 | Client Phone: (214) 748-3647 | Client Company: Prc Andrews Aveenue Llc | Expiration date: August 9, 2016 | Permit id: 240106657 | |||||
SCORE 99 Date: June 17, 2015 Contractor: Athanasios Amaxas Client: John Chatzky | Client Address: 955 East 163rd Street Bronx Ny 10459 | Client Phone: (214) 748-3647 | Client Company: Maria Estela Houses Ii Assoc. | Expiration date: January 9, 2016 | Permit id: 220451348 | |||||
SCORE 100 Date: November 22, 2011 Contractor: Scott Kreitzer Client: David Gartenlaub | Client Address: 955 E 163 St C/o Prc Management Bronx Ny 10459 | Client Phone: (214) 748-3647 | Client Company: Maria Estella Ii Assoc. Lp | Expiration date: June 20, 2015 | Permit id: 220156863 | |||||
SCORE 100 Date: October 27, 2015 Contractor: Donald Barkin Client: John Chatzky | Client Address: 955 East 163rd Street Bronx Ny 10459 | Client Phone: (914) 729-9825 | Client Company: Maria Estela Ii Associates | Permit status: Initial | Expiration date: October 20, 2016 | Permit id: 220413942 | |||||
SCORE 100 Date: September 1, 2015 Contractor: James Dipalma Client: John Chatzky | Client Address: 955 East 163rd Street Bronx Ny 10459 | Client Phone: (914) 729-9815 | Client Company: Maria Estela Houses Ii Assoc. | Permit status: Initial | Expiration date: August 31, 2016 | Permit id: 220451348 | |||||
SCORE 96 Date: August 10, 2015 Contractor: Simranpal Singh Client: John Chatzky | Client Address: Bank Street White Plains Ny 10606 | Client Phone: (914) 729-9815 | Client Company: Prc Andrews Aveenue Llc | Permit status: Initial | Expiration date: August 9, 2016 | Permit id: 240106657 | |||||
SCORE 99 Date: June 17, 2015 Contractor: Athanasios Amaxas Client: John Chatzky | Client Address: 955 East 163rd Street Bronx Ny 10459 | Client Phone: (914) 729-9815 | Client Company: Maria Estela Houses Ii Assoc. | Permit status: Initial | Expiration date: January 9, 2016 | Permit id: 220451348 | |||||
SCORE 100 Date: November 22, 2011 Contractor: Scott Kreitzer Client: David Gartenlaub | Client Address: 955 E 163 St C/o Prc Management Bronx Ny 10459 | Client Phone: (718) 928-2131 | Client Company: Maria Estella Ii Assoc. Lp | Permit status: Renewal | Expiration date: June 20, 2015 | Permit id: 220156863 | |||||
Public parts : (1) properly repair the broken/defective metal nosing at step seventeen (17) up from bottom at public hall stairs, 4th sty. (2) supp Date: October 21, 2010 Permit type: Gc | Permit id: Eb11898 | |||||
Work must be done in accordance with all city, state and federal rules/regulations. 1) replace the broken/ leaky section of over head steam line a Date: January 25, 2011 Permit type: Plumb | Permit id: Eb19376 | |||||
Public area; remove all loose cement water proofing at left and right side and rear of building. Provide 3coats of stucco s including wire lath and t Date: June 3, 2009 Permit type: Gc | Permit id: E939001 | |||||
Alternative enforcement program (aep) obtain all neccessary permits alternative enforcement program (aep) reinforce (sister) two (2) deteri0 Date: January 12, 2011 Permit type: Gc | Permit id: Eb17471 | |||||
SCORE 100 Sidewalk shed Date: February 22, 2012 Contractor: Advanced Construction Equ Permit type: Equipment | Permit status: Permit issued | Permit id: 22016991101 | |||||
SCORE 100 Equipment work Date: April 12, 2013 Contractor: Approved Oil Co Of Bklyn Permit status: Permit issued | Permit id: 22009069302 | |||||
Public parts : (1) clear main sewer house trap from trap to street and from house trap in to building. Pump out water and sewage in basement. Clean fe Date: March 15, 2010 Permit type: Stopag | Permit id: Ea28993 | |||||
Work must be done in accordance with all city, state and federal rules/regulations. 1. As directed, demolish and discard all concrete on floor a Date: February 2, 2011 Permit type: Gc | Permit id: Eb21100 | |||||
Task fee omo for work omo e937042 Date: June 9, 2009 Permit type: Aepfee | Permit id: E941538 | |||||
SCORE 100 Alteration Date: October 22, 2010 Contractor: Mark Contracting Ny Inc Permit status: Permit issued | Permit id: 22006808502 | |||||
SCORE 99 Sidewalk shed Date: October 8, 2010 Contractor: Sunny Improvement Inc Permit type: Equipment | Permit status: Permit issued | Permit id: 22008652801 | |||||
SCORE 98 Alteration Date: March 1, 2011 Contractor: K.M.D Construction Inc Permit status: Permit issued | Permit id: 22010346601 | |||||
Remove hanging metal chimney at north side apt.#4i. Contractor must contact hpd @ (718) 636-3021, 3048, 3049, with start date. Contractor must s Date: February 1, 2006 Permit type: Gc | Permit id: E620538 | |||||
Provide automatic fuel drop to the above building for 2 months. #2 fuel. Please report any problems immedately to esb fuel unit. 212-863-7830 Date: July 1, 2011 Permit type: Util | Permit id: Ec02594 | |||||
(1) supply and install one new edison box. One 4 ampere 3 phase service switch. One meter bank with 16 apt meter pans and circuit breakers. One bypa Permit type: Elec | Permit id: Eb05450 | |||||
Install new marble tread 1st from bottom 1st floor public hall. Remove all work related debris. Note: contractor must contact hpd @ 718/636- Date: November 29, 2007 Permit type: Gc | Permit id: E812934 | |||||
Con ed provide electricity to building public areas and heating plant/hot water heater Date: May 20, 2011 Permit type: Util | Permit id: Eb32032 | |||||
Public area: replace the missing lower metal sash of 2nd story public hall window. Remove all work related debris. Note: contractor must contact Date: May 24, 2006 Permit type: Gc | Permit id: E634229 | |||||
SCORE 86 Equipment work Date: February 11, 2011 Contractor: Approved Oil Co Of Brookl Permit status: Permit issued | Permit id: 22009069301 | |||||
Public parts : (1) trace, locate and repair the concealed water leak at cellar ceiling from above. Repair the damaged ceiling, approx. Qty- sf usin Date: July 28, 2010 Permit type: Gc | Permit id: Eb05416 | |||||
Provide single fuel drop with prime and start #2 fuel fill tank. Please report any problems immediately to esb fuel unit. (212) 863-8781 Date: April 22, 2011 Permit type: Util | Permit id: Eb29381 | |||||
P/a 3rd story public hall replace 2 metal balustrades . Permit type: Gc | Permit id: E002755 | |||||
New service; work must be done using safe work practice and in accordance with all city, state and federal rules/regulations. Work must be coordinat Date: July 17, 2009 Permit type: Elec | Permit id: E940475 | |||||
As per rc # 2006001274402 (enviro-probe inc), perform total lead analysis of 03 dust wipe sample(s) via environmental protection agency (epa) sw845-30 Date: November 22, 2005 Permit type: Delead | Permit id: E613751 | |||||
Provide single fuel drop with prime and start #2 fuel fill tank. Please report any problems immediately to esb fuel unit. (212) 863-8781 Date: October 11, 2010 Permit type: Util | Permit id: Eb12164 | |||||
Public parts : (1) remove obstructions and repair clogged sewer line from building to street. After completion of work ensure that all waste water of Date: July 22, 2010 Permit type: Stopag | Permit id: Eb04826 | |||||
At boiler room- replace the existing petrometer and secure to wall. Repair the heat timer. Tune #2 oil boiler and restore to proper working order. Date: May 2, 2011 Permit type: Heat | Permit id: Eb30253 | |||||
Public parts : (1) properly repair and secure the damaged/defective metal cornic, approx. Qty- 2 sf using similar materials at roof including replac Date: September 15, 2010 Permit type: Gc | Permit id: Ea39155 | |||||
Install sidewalk bridge 43 l. F. Replace cornice at roof 43 l. F. Permit type: Gc | Permit id: E002867 | |||||
In 2nd floor hallway install 1 window unit (thermal) u/l sash. In 4th floor install 1 window unit (thermal) u/l sash. Date: January 11, 1999 Permit type: Gc | Permit id: E003256 | |||||
At public area: tar and repair leaking bulkhead roof & skylight ( sq. Ft.) supply and install new bathroom roof vents (2) where missing, also instal Date: October 28, 2003 Permit type: Gc | Permit id: E404639 | |||||
Public parts : prooerly repair and secure the damaged/defective metal cornic, approx qty 2 sf using similar matrials at roof including replacing def Date: October 1, 2010 Permit type: Gc | Permit id: Eb10287 | |||||
Task fee omo for work omo e940475 Date: July 17, 2009 Permit type: Aepfee | Permit id: Ea04349 | |||||
Public area: at 4th floor public hall: replace broken window lower sash glass, wire glass only. Remove all work related debris. Non s. W. P. Note Date: February 11, 2008 Permit type: Gc | Permit id: E821846 | |||||
Remove/pump out all waste water in the cellar and disinfect affective areas in cellar clean out stoppage in the main waste line from house main to ci Date: January 19, 2011 Permit type: Stopag | Permit id: Eb20024 | |||||
Celler: remove/pump out all waste water in the celler and disinfect affetive areas in the celler. Cean out stoppage in the main waste line from ho Permit type: Stopag | Permit id: Eb21926 | |||||
Replace brick to brick aluminum window dhc with exterior trim at 4th story public hall. Supply and install child window guard at 4th story public h Date: January 26, 1999 Permit type: Gc | Permit id: E003196 | |||||
Remove broken marble tread and install new marble tread & metal nosing 1st. Up from bottom at 1st. Sty. Public hall. Contractor must contact hpd Date: October 4, 2005 Permit type: Gc | Permit id: E609731 | |||||
Omo roof replacement. Building is occupied. Roof must not start on thursday, friday or before a holiday. Must be done in accordance with all city, s Date: June 9, 2009 Permit type: Gc | Permit id: E937042 | |||||
Public area: at 3rd story public hallway stairway: replace missing window. Remove all work related debris. Non s. W. P. Note: contractor must cont Date: January 30, 2008 Permit type: Gc | Permit id: E820876 | |||||
Public parts :(1) demolish and repair defective/broken ceiling/walls, approx. Qty- sf at cellar using 5/8 thick gwb-water proof, taped, compound Date: September 8, 2010 Permit type: Gc | Permit id: Eb08658 | |||||
As per mini rc # 2009000203302(eas), perform polarized light microscopy (plm) gravimetric matrix reduction analysis as per hpd specification of 4 no Date: April 24, 2009 Permit type: Asbest | Permit id: E936438 | |||||
P/a 4th story replace missing ballusters. P/a 3rd story pu blic hall replace 2 metal ballusters. Permit type: Gc | Permit id: E002763 | |||||
Work must be done in accordance with all city, state and federal rules/regulations. 1) remove the existing door from at 1st sty p. H to cellar. Sup Date: February 1, 2011 Permit type: Gc | Permit id: Eb21119 | |||||
Task fee omo for work omo e939001 Date: June 3, 2009 Permit type: Aepfee | Permit id: E940958 | |||||
(1) supply and install one new edison box. One 4 ampere 3 phase service switch. One meter bank with 16 apt meter pans and circuit breakers. One bypa Date: October 13, 2010 Permit type: Elec | Permit id: Eb07904 | |||||
Public hall: scrape repair and repaint south wall of 2nd story public hall approx. Sq. Ft. Replace missing floor tiles at 1st story public hall. Date: September 13, 2005 Permit type: Gc | Permit id: E607490 | |||||
Work must be done in accordance with all city, state and federal rules/regulations. Work must be coordinated with hpd and all tenants in occupancy. Date: February 7, 2011 Permit type: Gc | Permit id: Eb21000 | |||||
Demo approx. 6 sq. Ft. Of concrete and ceramic floor tile and remove metal riser with nosing at 2nd story landing . Install new metal riser with nosin Date: March 8, 2001 Permit type: Gc | Permit id: E117296 | |||||
Public parts : (1) trace and locate the leak at sewer line in basement through video investigation and give written report on location and length of Date: November 1, 2010 Permit type: Stopag | Permit id: Eb12048 | |||||
Con ed provide electricity to building public areas and heating plant/hot water heater Date: March 6, 2012 Permit type: Util | Permit id: Ec22643 | |||||
Public parts : (1) clear main sewer line of bldg to main sewer house trap from trap to street. Pump out water and sewage in basement. Sanitize basemen Date: October 13, 2010 Permit type: Stopag | Permit id: Eb12046 | |||||
The following buildings and apt. Needs to be seal and secure. 1) 916 kelly st. Entrance to boiler room from 1 st floor ph to celler. One door Date: March 15, 2011 Value: $1,060 Permit type: Gc | Permit id: Eb25363 | |||||
Supply and install padlock with chain at door leading to cellar at public hall, 1st story. Alternative enforcement program note: contractor must Date: January 26, 2011 Value: $355 Permit type: Gc | Permit id: Eb20958 | |||||
Apt # 34, supply and install new mortise lock complete assembly to p. W. O at apt #34 entrance door. Remove all work related debris. Alternative enfor Date: November 10, 2009 Value: $242 Permit type: Gc | Permit id: Ea16015 | |||||
At apt #2: at entrance door; replace the mortise lock with new Date: November 18, 2008 Value: $301 Permit type: Gc | Permit id: E915973 | |||||
Public area : at public hall 2nd, 3rd, and 4th floor : installed (1 each floors) window stops. Remove all work related debris. Date: September 27, 2007 Value: $96 Permit type: Gc | Permit id: E807963 | |||||
Apt 21) at apt 21 plywood seal door and (2) windows. Remove all work related debris. Date: January 22, 2007 Value: $41 Permit type: Gc | Permit id: E719518 | |||||
Temporarily seal all accessible openings thru-out entire apartment #21, 2nd story. Date: January 5, 2007 Permit type: Gc | Permit id: E718114 | |||||
(at apartment #3): at rear bedroom remove plywood from window. Remove all work related debris. Date: December 26, 2006 Value: $67 Permit type: Gc | Permit id: E717108 | |||||
Apt 42) at bsmt adjust mixing valve. Water is too hot. Non swp scope. Date: June 16, 2006 Value: $149 Permit type: Plumb | Permit id: E637178 | |||||
Local law #1 violation : as per hpds abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new yor Date: April 13, 2006 Permit type: Delead | Permit id: E630732 | |||||
Local law #1 violation : as per hpds abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new yor Date: January 31, 2006 Value: $299 Permit type: Delead | Permit id: E623122 | |||||
Apartment #42: supply and install window guard at small bedroom. Date: January 23, 2006 Value: $107 Permit type: Gc | Permit id: E622033 | |||||
Local law #1 violation : as per attached scope of work thoroughly remove all lead violations as per new york city administrative code 27-2056. 11 and Date: September 12, 2005 Permit type: Delead | Permit id: E607772 | |||||
Install two (2) window balance at lower sash of kitchen and upper sash. Install four (4) one way screw at kitchen window. Install four (4) one way Date: July 26, 2005 Value: $72 Permit type: Gc | Permit id: E603129 | |||||
Public hall. 2nd story, remove defective window guard and install new window guard to code at 2nd story public hall. Remove all work related debris. Date: July 18, 2005 Value: $249 Permit type: Gc | Permit id: E602358 | |||||
Apartment #1: livingroom: install air valve and shut-off valve and secure radiator Date: June 14, 2005 Permit type: Plumb | Permit id: E534567 | |||||
Apt. 22: reinstall window guard at kitchen. Date: August 3, 2005 Value: $130 Permit type: Gc | Permit id: E604011 | |||||
Re-install 1 w/g in bedroom. Date: December 28, 2004 Value: $28 Permit type: Gc | Permit id: E516327 | |||||
Apt. #23) at kitchen install (1) new window guard complete. At bedroom install (1) window guad complete at 1st room from north. Remove all work re Date: June 21, 2004 Permit type: Gc | Permit id: E426333 | |||||
Apt. #44) at bedroom reinstall window guard and stops. Date: October 3, 2003 Value: $123 Permit type: Gc | Permit id: E406017 | |||||
Apt. #21) install window guards complete at apartment. Date: June 19, 2003 Value: $65 Permit type: Gc | Permit id: E325358 | |||||
At p/a provide and install (1) window box complete thermal wire w/g complete. Date: November 2, 2002 Permit type: Gc | Permit id: E308666 | |||||
(apt.#43) at bedrooms 1 & 2 replace radiator shut off valve. Ttl (2) Date: January 8, 2003 Value: $67 Permit type: Plumb | Permit id: E312890 | |||||
L/l 38 abate: abate as per rc # 0019786a . Thoroughly remove all lead violations as per new york city health code section 173. 14 and as noted in the s Date: March 28, 2002 Permit type: Delead | Permit id: E217339 | |||||
At front room remove upper sash thermo window bring to shop. Install glass and gas for thermo window bring back to apt and install. Temporary secure w Date: June 27, 2001 Value: $28 Permit type: Gc | Permit id: E125525 | |||||
Apartment #3 kitchen remove 1 top window sash, bedroom #2 remove 1 lower window sash. Bring both windows to shop install thermo glass, reinstall (2 Date: July 20, 2001 Value: $347 Permit type: Gc | Permit id: E201317 | |||||
In bedroom (1) remove mold and mildew on south wall approxitmately (7 sq. Ft.) (1) touch up paint (1) remove debris. Date: May 9, 2001 Permit type: Gc | Permit id: E122398 | |||||
In living room (1) remove mold and mildew on south wall and east walls approxitmately ( sq. Ft.) (1) touch up paint (1) remove debris Date: May 9, 2001 Permit type: Gc | Permit id: E122395 | |||||
In bedroom (1) remove mold and mildew on south wall approxitmately (15 sq. Ft) (1) touch up paint (1) remove debris. Date: May 9, 2001 Permit type: Gc | Permit id: E122383 | |||||
In kitchen (1) remove mold and mildew approxitmately (33 sq. Ft) on south wall (1) touch up paint (1) remove debris Date: May 9, 2001 Permit type: Gc | Permit id: E122373 | |||||
In bath room install (1) window guard and stop. In l/r install (1) window and stop. Note : vendor must sign and return with your bid: contrac Date: May 5, 2001 Value: $103 Permit type: Gc | Permit id: E122168 | |||||
Install glass to lower sash at 3rd floor public hall. Date: February 27, 2001 Permit type: Gc | Permit id: E117299 | |||||
At 2nd story public hall instal one way screws on w/g. Date: February 22, 2001 Value: $67 Permit type: Gc | Permit id: E116968 | |||||
(apt #43) in bdrm, remove mold and mildew on ceiling and four (4) walls. Paint entire bdrm complete and remove work related debris. Date: April 10, 2001 Permit type: Gc | Permit id: E120436 | |||||
SCORE 86 Equipment work Date: April 12, 2013 Contractor: F And S Petroleum Corp Permit status: Permit issued | Permit id: 22009069302 | |||||
Cut padlock and remove chain at gate at south passageway to street. Date: August 18, 2000 Permit type: Gc | Permit id: E102988 | |||||
Pa ext: cut pad lock at gate south passageway to street and give access. Date: August 27, 1999 Value: $50 Permit type: Gc | Permit id: E010900 | |||||
P. H. 4th floor : install 1 window guard & stop. Date: July 29, 1999 Value: $101 Permit type: Gc | Permit id: E009906 | |||||
P/a ext: 1 story public hall # 4 up inst. 1 marble tread . Date: December 15, 1998 Value: $41 Permit type: Gc | Permit id: E002756 | |||||
P/a ext: 2nd and 4th story public hall remove 2 broken and defective thermo window units one on 2nd story. One on 4th story. Install 2 new units co Date: December 14, 1998 Value: $642 Permit type: Gc | Permit id: E002718 | |||||
P/a ext : install 2nd story public hall 1 window guard & stop. Date: December 14, 1998 Value: $54 Permit type: Gc | Permit id: E002716 | |||||
SCORE 100 Equipment work Date: December 16, 2011 Contractor: Monadnock Construction In Permit status: Permit issued | Permit id: 22015765701 | |||||
SCORE 100 Plumbing Date: April 4, 2012 Contractor: Neptune Mechanical Inc Permit status: Permit issued | Permit id: 22015765701 | |||||
SCORE 99 Equipment work Date: November 28, 2012 Contractor: Notias Construction Inc Permit status: Permit issued | Permit id: 22015765702 | |||||
(1) supply and install one new edison box. One 4 ampere 3 phase service switch. One meter bank with 16 apt meter pans and circuit breakers. One bypa Permit type: Elec | Permit id: Eb05450 | |||||
P/a 3rd story public hall replace 2 metal balustrades . Permit type: Gc | Permit id: E002755 | |||||
Install sidewalk bridge 43 l. F. Replace cornice at roof 43 l. F. Permit type: Gc | Permit id: E002867 | |||||
Celler: remove/pump out all waste water in the celler and disinfect affetive areas in the celler. Cean out stoppage in the main waste line from ho Permit type: Stopag | Permit id: Eb21926 | |||||
P/a 4th story replace missing ballusters. P/a 3rd story pu blic hall replace 2 metal ballusters. Permit type: Gc | Permit id: E002763 | |||||
SCORE 99 Date: December 16, 2011 Contractor: Anthony Diguglielmo Client: Harold Derienzo | Client Address: 863 Prospect Avenue Bronx Ny 10459 | Client Phone: (718) 328-1064 | Client Company: Kelly Street Redevelopment Dhfc | Permit status: Renewal | Permit id: 220157657 | |||||
Date: February 11, 2011 Client: Chacko Thomas | Client Address: 1 Gold St Ny Ny 10038 | Client Phone: (212) 863-8262 | Client Company: Nyc Hpd | Permit status: Initial | Permit id: 220090693 | |||||
SCORE 100 Date: February 22, 2012 Contractor: Selu Vladislavmihut Client: Selu Vladislav-Mihut | Client Address: 107 Front Street Hempstead Ny 11550 | Client Phone: (516) 505-7772 | Permit status: Initial | Permit id: 220169911 | |||||
SCORE 98 Date: April 4, 2012 Contractor: Nicholas Notias Client: Harold Derienzo | Client Address: 863 Prospect Avenue Bronx Ny 10459 | Client Phone: (718) 328-1064 | Client Company: Kelly Street Redevelopment Dhfc | Permit status: Initial | Permit id: 220157657 | |||||
SCORE 100 Date: June 17, 2010 Contractor: Amrik Singh Client: Hpd Nyc | Client Address: 1 Gold Street Manhattan Ny 10038 | Client Phone: (212) 863-7625 | Client Company: Hpd Nyc | Permit status: Renewal | Permit id: 220068085 | |||||
SCORE 100 Date: February 11, 2011 Contractor: David Wagner Client: Chacko Thomas | Client Address: 1 Gold St Ny Ny 10038 | Client Phone: (212) 863-8262 | Client Company: Nyc Hpd | Permit status: Renewal | Permit id: 220090693 | |||||
SCORE 98 Date: February 11, 2011 Contractor: Vincent Siciliano Client: Chacko Thomas | Client Address: 1 Gold St Ny Ny 10038 | Client Phone: (212) 863-8262 | Client Company: Nyc Hpd | Permit status: Renewal | Permit id: 220090693 | |||||
SCORE 98 Date: December 16, 2011 Contractor: Jens Hansen Client: Harold Derienzo | Client Address: 863 Prospect Avenue Bronx Ny 10459 | Client Phone: (718) 328-1064 | Client Company: Kelly Street Redevelopment Dhfc | Permit status: Initial | Permit id: 220157657 | |||||
SCORE 99 Date: November 22, 2011 Contractor: Bryan Ennist Client: David Gartenlaub | Client Address: 955 E 163 St C/o Prc Management Bronx Ny 10459 | Client Phone: (718) 928-2131 | Client Company: Maria Estella Ii Assoc. Lp | Permit status: Initial | Permit id: 220156863 | |||||
SCORE 96 Date: October 8, 2010 Contractor: Nariender Sargodiya Client: Hpd Nyc | Client Address: 1 Gold Street New York Ny 10038 | Client Phone: (212) 863-7625 | Client Company: Hpd Nyc | Permit status: Initial | Permit id: 220086528 | |||||
P/a 4th story replace missing ballusters. P/a 3rd story pu blic hall replace 2 metal ballusters. Permit type: Gc | Permit id: E002763 | |||||
Celler: remove/pump out all waste water in the celler and disinfect affetive areas in the celler. Cean out stoppage in the main waste line from ho Permit type: Stopag | Permit id: Eb21926 | |||||
Install sidewalk bridge 43 l. F. Replace cornice at roof 43 l. F. Permit type: Gc | Permit id: E002867 | |||||
P/a 3rd story public hall replace 2 metal balustrades . Permit type: Gc | Permit id: E002755 | |||||
(1) supply and install one new edison box. One 4 ampere 3 phase service switch. One meter bank with 16 apt meter pans and circuit breakers. One bypa Permit type: Elec | Permit id: Eb05450 | |||||
SCORE 98 Date: February 11, 2011 Contractor: Vincent Siciliano Client: Chacko Thomas | Client Address: 1 Gold St Ny Ny 10038 | Client Phone: (212) 863-8262 | Client Company: Nyc Hpd | Permit status: Initial | Permit id: 220090693 | |||||
P a ext : install 2nd story public hall 1 window guard & stop. Date: December 14, 1998 Value: $54 Permit type: Gc | Permit id: E002716 | |||||
P a ext: 2nd and 4th story public hall remove 2 broken and defective thermo window units one on 2nd story. One on 4th story. Install 2 new units co Date: December 14, 1998 Value: $642 Permit type: Gc | Permit id: E002718 | |||||
P a ext: 1 story public hall # 4 up inst. 1 marble tread . Date: December 15, 1998 Value: $41 Permit type: Gc | Permit id: E002756 | |||||
At 2nd story public hall instal one way screws on w g. Date: February 22, 2001 Value: $67 Permit type: Gc | Permit id: E116968 | |||||
In bath room install (1) window guard and stop. In l r install (1) window and stop. Note : vendor must sign and return with your bid: contrac Date: May 5, 2001 Value: $103 Permit type: Gc | Permit id: E122168 | |||||
L l 38 abate: abate as per rc # 0019786a . Thoroughly remove all lead violations as per new york city health code section 173. 14 and as noted in the s Date: March 28, 2002 Permit type: Delead | Permit id: E217339 | |||||
At p a provide and install (1) window box complete thermal wire w g complete. Date: November 2, 2002 Permit type: Gc | Permit id: E308666 | |||||
Re-install 1 w g in bedroom. Date: December 28, 2004 Value: $28 Permit type: Gc | Permit id: E516327 | |||||
Work must be done in accordance with all city, state and federal rules regulations. Work must be coordinated with hpd and all tenants in occupancy. Date: January 14, 2011 Permit type: Rub | Permit id: Eb19171 | |||||
Con ed provide electricity to building public areas and heating plant hot water heater Date: March 6, 2012 Permit type: Util | Permit id: Ec22643 | |||||
Work must be done in accordance with all city, state and federal rules regulations. 1) remove the existing door from at 1st sty p. H to cellar. Sup Date: February 1, 2011 Permit type: Gc | Permit id: Eb21119 | |||||
P a 4th story replace missing ballusters. P a 3rd story pu blic hall replace 2 metal ballusters. Permit type: Gc | Permit id: E002763 | |||||
Public parts :(1) demolish and repair defective broken ceiling walls, approx. Qty- sf at cellar using 5 8 thick gwb-water proof, taped, compound Date: September 8, 2010 Permit type: Gc | Permit id: Eb08658 | |||||
Remove pump out all waste water in the cellar and disinfect affective areas in cellar clean out stoppage in the main waste line from house main to ci Date: January 19, 2011 Permit type: Stopag | Permit id: Eb20024 | |||||
Con ed provide electricity to building public areas and heating plant hot water heater Date: July 1, 2011 Permit type: Util | Permit id: Ec00639 | |||||
Celler: remove pump out all waste water in the celler and disinfect affetive areas in the celler. Cean out stoppage in the main waste line from ho Permit type: Stopag | Permit id: Eb21926 | |||||
Public parts : prooerly repair and secure the damaged defective metal cornic, approx qty 2 sf using similar matrials at roof including replacing def Date: October 1, 2010 Permit type: Gc | Permit id: Eb10287 | |||||
Install sidewalk bridge 43 l. F. Replace cornice at roof 43 l. F. Permit type: Gc | Permit id: E002867 | |||||
Public parts : (1) properly repair and secure the damaged defective metal cornic, approx. Qty- 2 sf using similar materials at roof including replac Date: September 15, 2010 Permit type: Gc | Permit id: Ea39155 | |||||
New service; work must be done using safe work practice and in accordance with all city, state and federal rules regulations. Work must be coordinat Date: July 17, 2009 Permit type: Elec | Permit id: E940475 | |||||
In 2nd floor hallway install 1 window unit (thermal) u l sash. In 4th floor install 1 window unit (thermal) u l sash. Date: January 11, 1999 Permit type: Gc | Permit id: E003256 | |||||
P a 3rd story public hall replace 2 metal balustrades . Permit type: Gc | Permit id: E002755 | |||||
(1) supply and install one new edison box. One 4 ampere 3 phase service switch. One meter bank with 16 apt meter pans and circuit breakers. One bypa Permit type: Elec | Permit id: Eb05450 | |||||
Install new marble tread 1st from bottom 1st floor public hall. Remove all work related debris. Note: contractor must contact hpd @ 718 636- Date: November 29, 2007 Permit type: Gc | Permit id: E812934 | |||||
Work must be done in accordance with all city, state and federal rules regulations. 1) replace the broken leaky section of over head steam line a Date: January 25, 2011 Permit type: Plumb | Permit id: Eb19376 | |||||
Work must be done in accordance with all city, state and federal rules regulations. 1. As directed, demolish and discard all concrete on floor a Date: February 2, 2011 Permit type: Gc | Permit id: Eb21100 | |||||
Public parts : (1) properly repair the broken defective metal nosing at step seventeen (17) up from bottom at public hall stairs, 4th sty. (2) supp Date: October 21, 2010 Permit type: Gc | Permit id: Eb11898 | |||||
Apt. # 4d supply and install radiator air valve to room east 2. Call tenant for access at (347)2909205. At the time of this invitation to bid, it is Date: March 6, 2017 Value: $50 Permit type: Plumb | Permit id: Eh13202 | |||||
At apt 4d, in bedroom, replace defective air valve with new at heat pipe riser. Remove all work related debris. At the time of this invitation to b Date: March 16, 2017 Value: $25 Permit type: Plumb | Permit id: Eh13737 | |||||
P a 4th story replace missing ballusters. P a 3rd story pu blic hall replace 2 metal ballusters. Permit type: Gc | Permit id: E002763 | |||||
Celler: remove pump out all waste water in the celler and disinfect affetive areas in the celler. Cean out stoppage in the main waste line from ho Permit type: Stopag | Permit id: Eb21926 | |||||
Install sidewalk bridge 43 l. F. Replace cornice at roof 43 l. F. Permit type: Gc | Permit id: E002867 | |||||
P a 3rd story public hall replace 2 metal balustrades . Permit type: Gc | Permit id: E002755 | |||||
(1) supply and install one new edison box. One 4 ampere 3 phase service switch. One meter bank with 16 apt meter pans and circuit breakers. One bypa Permit type: Elec | Permit id: Eb05450 | |||||
Work must be done in accordance with all city, state and federal rules/regulations. 1) trace locates and repairs the leak at rear section of cella Date: February 3, 2011 Permit type: Gc | Permit id: Eb20974 | |||||
Work must be done in accordance with all city, state and federal rules regulations. 1) trace locates and repairs the leak at rear section of cella Date: February 3, 2011 Permit type: Gc | Permit id: Eb20974 | |||||
Apt#22 : trace, locate and repair the source of moisture/ leak causing development of mold at ceiling/walls at below listed location. Demolish and r Date: June 24, 2010 Permit type: Gc | Permit id: Ea39105 | |||||
At apt. 22 bathroom: demo ceiling, repair concealed water leak at ceiling. Sheetrock ceiling, tape, compound, prime and paint. Note: contractor must Date: January 11, 2005 Permit type: Gc | Permit id: E517292 | |||||
Apt#22 :(1) trace, locate and repair the concelaed water leak at ceiling/walls of bathroom from above apartments. Demolish and repair the defective/br Date: October 12, 2010 Permit type: Gc | Permit id: Eb11671 | |||||
Apt#22 :(1) trace, locate and repair the concelaed water leak at ceiling walls of bathroom from above apartments. Demolish and repair the defective br Date: October 12, 2010 Permit type: Gc | Permit id: Eb11671 | |||||
Apt#22 : trace, locate and repair the source of moisture leak causing development of mold at ceiling walls at below listed location. Demolish and r Date: June 24, 2010 Permit type: Gc | Permit id: Ea39105 | |||||
Work must be done in accordance with all city, state and federal rules/regulations. Work must be coordinated with hpd and all tenants in occupancy. Date: February 18, 2011 Permit type: Rub | Permit id: Eb22799 | |||||
Work must be done in accordance with all city, state and federal rules/regulations. Seal all accessible openings at apt#31, 33, and 42 as follows: a Date: January 31, 2011 Permit type: Gc | Permit id: Eb18450 | |||||
Work must be done in accordance with all city, state and federal rules regulations. Seal all accessible openings at apt#31, 33, and 42 as follows: a Date: January 31, 2011 Permit type: Gc | Permit id: Eb18450 | |||||
Work must be done in accordance with all city, state and federal rules regulations. Work must be coordinated with hpd and all tenants in occupancy. Date: February 18, 2011 Permit type: Rub | Permit id: Eb22799 | |||||
Apt#24 : (1) trace, locate and repair the source of concelaed water leak/moisture causing development of mold in room- eastsouth-3 (bed room ) . Clea Date: October 13, 2010 Permit type: Gc | Permit id: Eb11682 | |||||
(apt. #24) at room east (2): trace and repair the source of water leak and loose plaster. At room east (2): ceiling and/or wall damages 2 sq. Ft. Date: April 7, 2008 Permit type: Gc | Permit id: E827601 | |||||
Trace and repair leak at bath room ceiling. Demo and replace sheet rock ceiling at bath room 35 s. F. , clean mold and mildew at all walls above tiles Date: November 24, 2004 Permit type: Gc | Permit id: E511861 | |||||
1) dismentle and remove existing heating plant. Provide and install new cast iron similar or equivalent steam boiler to meet heating and hot water re Date: September 2, 2010 Permit type: Heat | Permit id: Eb05435 | |||||
(apt. #24) at room east (2): trace and repair the source of water leak and loose plaster. At room east (2): ceiling and or wall damages 2 sq. Ft. Date: April 7, 2008 Permit type: Gc | Permit id: E827601 | |||||
Apt#24 : (1) trace, locate and repair the source of concelaed water leak moisture causing development of mold in room- eastsouth-3 (bed room ) . Clea Date: October 13, 2010 Permit type: Gc | Permit id: Eb11682 | |||||
As per rc #2005001338404 (enviro-probe inc), perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw845-305 Date: October 3, 2005 Permit type: Delead | Permit id: E609939 | |||||
Apt#32 & 42 : (1) seal two (2) apt entrance door opening with plywood and overlay with stucco. (2) seal ten ( ) window openings with plywood incl Date: September 21, 2010 Permit type: Gc | Permit id: Eb10007 | |||||
(apt. #42) install (2) new window guards complete at bedroom #1 (1) and bedroom #2 (1). Install window stops at kitchen window. At bedroom fire esc Date: June 1, 2004 Permit type: Gc | Permit id: E424226 | |||||
As per rc #2005001338401 (enviro-probe inc), perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw845-305 Date: June 28, 2005 Permit type: Delead | Permit id: E534939 | |||||
As per rc #2004000522201 (enviro-probe inc), perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw845-305 Date: July 8, 2004 Permit type: Delead | Permit id: E427086 | |||||
(apt.#42) remove mold from east and north walls, approx. Sq. Ft. At bedroom, prime with stain killer and paint. Remove mold and mildew from ceil Date: May 26, 2004 Permit type: Gc | Permit id: E424224 | |||||
At apt. 42: remove all mold and mildew at bedroom wall and repair sheet rock and remove plastic. Use hot water, bleach and stain killer. Prime and pai Date: April 29, 2005 Permit type: Gc | Permit id: E529426 | |||||
(apt. #23) trace, locate and repair water leak at bathroom ceiling from above apt. #43 down to apt. #23. Demolish, approx. 64 sq. Ft. Ceiling and wa Date: June 25, 2004 Permit type: Gc | Permit id: E426332 | |||||
(apt.#23) locate and repair multiple water leaks cascading down (apt.#44) into bathroom above. Perform sheetrock, plaster, repairs to damaged ceilin Date: September 23, 2003 Permit type: Gc | Permit id: E404816 | |||||
Work must be done in accordance with all city, state and federal rules/regulations. Work must be coordinated with hpd and all tenants in occupancy. Date: January 24, 2011 Permit type: Gc | Permit id: Eb19224 | |||||
As per rc #2004000522201 (enviro-probe inc), perform total lead analysis of 09 dust wipe sample(s) via environmental protection agency (epa) sw845-305 Date: December 30, 2003 Permit type: Delead | Permit id: E411835 | |||||
As per the attached scope of work, scrub mildewed surfaces with a solution of one cup of chlorine bleach to one gallon of water. A detergent such as t Date: August 14, 2003 Permit type: Gc | Permit id: E402943 | |||||
At bathroom in apt 44 demo mold area of ceiling sheetrock and patch ceiling sq. Ft. Clean west wall at mold sq. Ft. Stain kill prime and paint Date: June 28, 2004 Permit type: Gc | Permit id: E426374 | |||||
Apt#44 : troble shoot and make all necessary repairs to remove exposed electrical wires at walls of the kitchen and supply adequate electrical power s Date: November 24, 2009 Permit type: Elec | Permit id: Ea17170 | |||||
Work must be done in accordance with all city, state and federal rules regulations. Work must be coordinated with hpd and all tenants in occupancy. Date: January 24, 2011 Permit type: Gc | Permit id: Eb19224 | |||||
Dismantle and remove existing heating plant located in 9 kelly street. Please note that this boiler services both buildings 9 and 924 kelly s Date: October 15, 2008 Permit type: Heat | Permit id: E911267 | |||||
Remove all mold and mildew at rear room east wall sq. Ft., and south wall sq. Ft., plaster were needed, stain kill , prime and paint white latex Date: March 1, 2002 Permit type: Gc | Permit id: E215466 | |||||
As per the below scope of work, scrub mildewed surfaces with a solution of one cup of chlorine bleach one gallon of water. A detergent such as tri-sod Date: May 1, 2003 Permit type: Gc | Permit id: E321014 | |||||
Apartment #3 locate concealed water leaks in bathroom wall by light fixture and ceiling also private hall by light fixture. Remove sheetrock from cei Date: August 6, 2001 Permit type: Gc | Permit id: E201334 | |||||
At exterior wall apply thero seal at out side wall at east approx. Sq. Ft., and south wall approx. 4 sq. Ft., once this is done..... Scrape plaster Date: May 8, 2002 Permit type: Gc | Permit id: E219403 | |||||
(apt #3) find water leak coming from ceiling at rear room and repair. Repair plastered ceiling. Remove with bleach mold and mildew at rear room (36 Date: April 10, 2001 Permit type: Gc | Permit id: E118984 | |||||
As per rc # 2006001274402 (enviro-probe inc), perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw845-30 Date: April 10, 2006 Permit type: Delead | Permit id: E629366 | |||||
Trace and repair leak from apartment above apartment#33 bathroom. Install approx (32sq. Ft.) of sheetrock tape, compound and paint ceiling of bathroom Date: June 3, 2005 Permit type: Gc | Permit id: E533024 | |||||
(apartment # 33) install a new showerbody at bathroom tub. Reset tiles disturbed during the installation . Ensure the faucet / shower and knobs are i Date: April 6, 2006 Permit type: Plumb | Permit id: E629310 | |||||
As per rc #2006001274402 (enviro-probe, inc.), perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw845-3 Date: December 30, 2005 Permit type: Delead | Permit id: E618176 | |||||
(apartment # 33) install a new showerbody at bathroom tub. Reset tiles disturbed during the installation . Ensure the faucet shower and knobs are i Date: April 6, 2006 Permit type: Plumb | Permit id: E629310 | |||||
Apartment #32: locate and repair the leak in the bathroom ceiling. Repair and paint the bathroom ceiling approximately square feet. Note: cont Date: June 20, 2005 Permit type: Gc | Permit id: E534568 | |||||
Alternative enforcement propgram remove existing damaged 2 kitchen waste stack and provide new, fl vertically and lf underground, approx. L Date: March 3, 2011 Permit type: Plumb | Permit id: Eb22539 | |||||
Apartment #32: locate and repair the leak over the bathroom. Repair and paint the bathroom ceiling approx. 25 sq. Ft. Children under 7 Date: April 24, 2006 Permit type: Gc | Permit id: E630990 | |||||
Work must be done in accordance with all city, state and federal rules/regulations. Work must be coordinated with hpd and all tenants in occupancy. Date: January 3, 2011 Permit type: Gc | Permit id: Eb17855 | |||||
Work must be done in accordance with all city, state and federal rules regulations. Work must be coordinated with hpd and all tenants in occupancy. Date: January 3, 2011 Permit type: Gc | Permit id: Eb17855 | |||||
As per rc #2005001338401 (enviro-probe inc), perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw845-305 Date: April 28, 2005 Permit type: Delead | Permit id: E529460 | |||||
Find and repair all water leaks affecting ceiling of bathroom and repair. Demolish entire illegal drop ceiling and install new ceiling 5/8 fire co Date: August 22, 2005 Permit type: Gc | Permit id: E605406 | |||||
Remove barreal waste snake out bathtub down to basement out to street. Reinstall barreal waste full in cement floor by barreal waste area. Cont Date: December 26, 2000 Permit type: Plumb | Permit id: E112072 | |||||
Find and repair all water leaks affecting ceiling of bathroom and repair. Demolish entire illegal drop ceiling and install new ceiling 5 8 fire co Date: August 22, 2005 Permit type: Gc | Permit id: E605406 | |||||
Apt#4 : trace, locate and repair the source of leak at bathroom ceiling/walls from above apartments. Demolish and repair the damaged/defective ceiling Date: June 24, 2010 Permit type: Gc | Permit id: Ea39108 | |||||
Vacuum boiler chimney and chimney base; adjust heat timer. Make all necessary repairs to #2 oil fired boiler and restore to proper working order. R Date: March 6, 2008 Permit type: Heat | Permit id: E824717 | |||||
On edison provide electric to building public areas and heating plant / hot water heater. Date: April 9, 2008 Permit type: Util | Permit id: E828837 | |||||
Con edison provide electricity to building public areas and heating plant/hot water heater. Date: June 7, 2010 Permit type: Util | Permit id: Eb03847 | |||||
Con edison provide electricity to building public areas and heating plant/hot water heater. Date: July 1, 2009 Permit type: Util | Permit id: Ea02436 | |||||
Apt#4 : (1) trace, locate and repair the concealed water leak at bathroom ceiling/walls from above apartments. Demolish and repair the broken/defectiv Date: November 5, 2010 Permit type: Gc | Permit id: Eb13021 | |||||
Boiler; dismantle and remove existing heating plant. Provide and install new cast iron similar or equivalent steam boiler to meet heating and hot wa Date: September 23, 2009 Permit type: Heat | Permit id: Ea07672 | |||||
(apt. #4) at bathroom: trace and repair the source of water leak and loose plaster. At bathroom: ceiling and/or wall damages 95 sq. Ft. Demolish Date: May 28, 2008 Permit type: Gc | Permit id: E832864 | |||||
Clear stoppage and clean and sanitize entire basement. Upon completion notify hpd utitily account pick up pending. Note: contractor must contact Date: April 30, 2008 Permit type: Stopag | Permit id: E830825 | |||||
Con edison provide electricity to building public areas and heating plant/hot water heater. Date: November 21, 2008 Permit type: Util | Permit id: E916641 | |||||
Provide single fuel drop with prime and start #2 fuel fill tank.. Please report any problems immediately to esb fuel unit.(212) 863-8781 Date: March 12, 2008 Permit type: Util | Permit id: E825384 | |||||
Con edison; provide electricity to building, public areas and heating plant, hot water heater. Date: October 21, 2008 Permit type: Util | Permit id: E912923 | |||||
As per rc #20010019679c (emsl), perform total lead analysis of 09 dust wipe sample(s) via environmental protection agency (epa) sw845-3050-74 method Date: March 8, 2002 Permit type: Delead | Permit id: E215947 | |||||
Con edison provide electricity to building public areas and heating plant hot water heater. Date: November 21, 2008 Permit type: Util | Permit id: E916641 | |||||
(apt. #4) at bathroom: trace and repair the source of water leak and loose plaster. At bathroom: ceiling and or wall damages 95 sq. Ft. Demolish Date: May 28, 2008 Permit type: Gc | Permit id: E832864 | |||||
Apt#4 : (1) trace, locate and repair the concealed water leak at bathroom ceiling walls from above apartments. Demolish and repair the broken defectiv Date: November 5, 2010 Permit type: Gc | Permit id: Eb13021 | |||||
Con edison provide electricity to building public areas and heating plant hot water heater. Date: July 1, 2009 Permit type: Util | Permit id: Ea02436 | |||||
Con edison provide electricity to building public areas and heating plant hot water heater. Date: June 7, 2010 Permit type: Util | Permit id: Eb03847 | |||||
On edison provide electric to building public areas and heating plant hot water heater. Date: April 9, 2008 Permit type: Util | Permit id: E828837 | |||||
Apt#4 : trace, locate and repair the source of leak at bathroom ceiling walls from above apartments. Demolish and repair the damaged defective ceiling Date: June 24, 2010 Permit type: Gc | Permit id: Ea39108 | |||||
Local law #1 violation : as per rc #2004000429902 (abax) court order and attached scope of work thoroughly remove all lead violations as per new york Date: October 14, 2004 Permit type: Delead | Permit id: E509976 | |||||
L/l 38 abate: abate as per rc # 0021497 thoroughly remove all lead violations as per new york city health code section 173. 14 and as noted in the scop Date: August 9, 2001 Permit type: Delead | Permit id: E202340 | |||||
Work must be done in accordance with all city, state and federal rules/regulations. Work must be coordinated with hpd and all tenants in occupancy. Date: January 12, 2011 Permit type: Gc | Permit id: Eb19130 | |||||
Perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: September 29, 2010 Permit type: Delead | Permit id: Eb11117 | |||||
Apt#43 :(1) trace, locate and repair the source of moisture/leak causing development of mold at ceiling/walls at below listed locations. Demolish and Date: July 22, 2010 Permit type: Gc | Permit id: Ea39110 | |||||
As per rc #2004000522203 (enviro-probe inc), perform total lead analysis of 02 dust wipe sample(s) via environmental protection agency (epa) sw845-305 Date: October 12, 2004 Permit type: Delead | Permit id: E509958 | |||||
Apt#43 : (1) trace, locate and repair the concealed water leak at ceiling/walls in room east-5. Demolish and repair the damaged ceiling/walls approx. Date: September 3, 2010 Permit type: Gc | Permit id: Eb08657 | |||||
Apt#43 : (1) trace, locate and repair the concealed water leak at ceiling walls in room east-5. Demolish and repair the damaged ceiling walls approx. Date: September 3, 2010 Permit type: Gc | Permit id: Eb08657 | |||||
Apt#43 :(1) trace, locate and repair the source of moisture leak causing development of mold at ceiling walls at below listed locations. Demolish and Date: July 22, 2010 Permit type: Gc | Permit id: Ea39110 | |||||
Work must be done in accordance with all city, state and federal rules regulations. Work must be coordinated with hpd and all tenants in occupancy. Date: January 12, 2011 Permit type: Gc | Permit id: Eb19130 | |||||
L l 38 abate: abate as per rc # 0021497 thoroughly remove all lead violations as per new york city health code section 173. 14 and as noted in the scop Date: August 9, 2001 Permit type: Delead | Permit id: E202340 | |||||
Boiler; dismantle and remove existing heating plant. Provide and install new cast iron similar or equivalent steam boiler to meet heating and hot wa Permit type: Heat | Permit id: E929382 | |||||
Boiler; dismantle and remove existing heating plant. Provide and install new cast iron similar or equivalent steam boiler to meet heating and hot wa Permit type: Heat | Permit id: E929380 | |||||
As per rc #2005001338404 (enviro-probe inc), perform total lead analysis of 02 dust wipe sample(s) via environmental protection agency (epa) sw845-305 Date: October 3, 2005 Permit type: Delead | Permit id: E609938 | |||||
Apt#34 : (1) trace, locate and repair the concealed water leak at bathroom ceiling/walls from above. Demolish and repair the defective/broken ceilin Date: December 28, 2009 Permit type: Gc | Permit id: Ea19975 | |||||
Boiler; dismantle and remove existing heating plant. Provide and install new cast iron similar or equivalent steam boiler to meet heating and hot wa Date: March 17, 2009 Permit type: Heat | Permit id: E929387 | |||||
Boiler; dismantle and remove existing heating plant. Provide and install new cast iron similar or equivalent steam boiler to meet heating and hot wa Permit type: Heat | Permit id: E929384 | |||||
Apt#34 : (1) make necessary repair/adjustment at thermostate to supply adequate hot water in apt#34. Complete above work with all necessary materi Date: December 28, 2009 Permit type: Heat | Permit id: Ea19978 | |||||
As per rc # 20080000809 (eastern analyt. Svc.,inc), perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw8 Date: January 30, 2008 Permit type: Delead | Permit id: E821052 | |||||
Omo heating: new boiler system replacement includes all accessories, supply & return lines. Work must be done in accordance with all city state and Permit type: Heat | Permit id: Ea03018 | |||||
Apt#34 : (1) trouble shoot and make all necessary repairs to remove existing exposed eletrical wires in the bathroom. Seal openings with similar mater Date: January 5, 2010 Permit type: Elec | Permit id: Ea17018 | |||||
Boiler; dismantle and remove existing heating plant. Provide and install new cast iron similar or equivalent steam boiler to meet heating and hot wa Permit type: Heat | Permit id: E929385 | |||||
At apt. 34: find and repair all water leaks affecting apt. 34 bathroom ceiling and walls. Remove all mold and mildew, apply bleach, stain kill primer Date: May 10, 2005 Permit type: Gc | Permit id: E530849 | |||||
Boiler; dismantle and remove existing heating plant. Provide and install new cast iron similar or equivalent steam boiler to meet heating and hot wa Permit type: Heat | Permit id: E929381 | |||||
Boiler; dismantle and remove existing heating plant. Provide and install new cast iron similar or equivalent steam boiler to meet heating and hot wa Permit type: Heat | Permit id: E929380 | |||||
Boiler; dismantle and remove existing heating plant. Provide and install new cast iron similar or equivalent steam boiler to meet heating and hot wa Permit type: Heat | Permit id: E929382 | |||||
Boiler; dismantle and remove existing heating plant. Provide and install new cast iron similar or equivalent steam boiler to meet heating and hot wa Permit type: Heat | Permit id: E929384 | |||||
Omo heating: new boiler system replacement includes all accessories, supply & return lines. Work must be done in accordance with all city state and Permit type: Heat | Permit id: Ea03018 | |||||
Boiler; dismantle and remove existing heating plant. Provide and install new cast iron similar or equivalent steam boiler to meet heating and hot wa Permit type: Heat | Permit id: E929385 | |||||
Boiler; dismantle and remove existing heating plant. Provide and install new cast iron similar or equivalent steam boiler to meet heating and hot wa Permit type: Heat | Permit id: E929381 | |||||
Boiler; dismantle and remove existing heating plant. Provide and install new cast iron similar or equivalent steam boiler to meet heating and hot wa Permit type: Heat | Permit id: E929381 | |||||
Boiler; dismantle and remove existing heating plant. Provide and install new cast iron similar or equivalent steam boiler to meet heating and hot wa Permit type: Heat | Permit id: E929385 | |||||
Omo heating: new boiler system replacement includes all accessories, supply & return lines. Work must be done in accordance with all city state and Permit type: Heat | Permit id: Ea03018 | |||||
Boiler; dismantle and remove existing heating plant. Provide and install new cast iron similar or equivalent steam boiler to meet heating and hot wa Permit type: Heat | Permit id: E929384 | |||||
Boiler; dismantle and remove existing heating plant. Provide and install new cast iron similar or equivalent steam boiler to meet heating and hot wa Permit type: Heat | Permit id: E929382 | |||||
Boiler; dismantle and remove existing heating plant. Provide and install new cast iron similar or equivalent steam boiler to meet heating and hot wa Permit type: Heat | Permit id: E929380 | |||||
Boiler; dismantle and remove existing heating plant. Provide and install new cast iron similar or equivalent steam boiler to meet heating and hot wa Permit type: Heat | Permit id: E929381 | |||||
Boiler; dismantle and remove existing heating plant. Provide and install new cast iron similar or equivalent steam boiler to meet heating and hot wa Permit type: Heat | Permit id: E929385 | |||||
Omo heating: new boiler system replacement includes all accessories, supply & return lines. Work must be done in accordance with all city state and Permit type: Heat | Permit id: Ea03018 | |||||
Apt#34 : (1) make necessary repair adjustment at thermostate to supply adequate hot water in apt#34. Complete above work with all necessary materi Date: December 28, 2009 Permit type: Heat | Permit id: Ea19978 | |||||
Boiler; dismantle and remove existing heating plant. Provide and install new cast iron similar or equivalent steam boiler to meet heating and hot wa Permit type: Heat | Permit id: E929384 | |||||
Apt#34 : (1) trace, locate and repair the concealed water leak at bathroom ceiling walls from above. Demolish and repair the defective broken ceilin Date: December 28, 2009 Permit type: Gc | Permit id: Ea19975 | |||||
Boiler; dismantle and remove existing heating plant. Provide and install new cast iron similar or equivalent steam boiler to meet heating and hot wa Permit type: Heat | Permit id: E929382 | |||||
Boiler; dismantle and remove existing heating plant. Provide and install new cast iron similar or equivalent steam boiler to meet heating and hot wa Permit type: Heat | Permit id: E929380 | |||||
Boiler; dismantle and remove existing heating plant. Provide and install new cast iron similar or equivalent steam boiler to meet heating and hot wa Permit type: Heat | Permit id: E929382 | |||||
Boiler; dismantle and remove existing heating plant. Provide and install new cast iron similar or equivalent steam boiler to meet heating and hot wa Permit type: Heat | Permit id: E929380 | |||||
Boiler; dismantle and remove existing heating plant. Provide and install new cast iron similar or equivalent steam boiler to meet heating and hot wa Permit type: Heat | Permit id: E929381 | |||||
Boiler; dismantle and remove existing heating plant. Provide and install new cast iron similar or equivalent steam boiler to meet heating and hot wa Permit type: Heat | Permit id: E929385 | |||||
Omo heating: new boiler system replacement includes all accessories, supply & return lines. Work must be done in accordance with all city state and Permit type: Heat | Permit id: Ea03018 | |||||
Boiler; dismantle and remove existing heating plant. Provide and install new cast iron similar or equivalent steam boiler to meet heating and hot wa Permit type: Heat | Permit id: E929384 | |||||
Apt#41 : (1) trouble shoot and make all necessary repairs to electrical power supply system to supply adequate electrical power to all electric outlet Permit type: Elec | Permit id: Ea39113 | |||||
Apt#41 : (1) remove all obstructions from waste line of bath tub and wash basin in bathroom. After completion of work, ensure that all waste water run Date: July 1, 2010 Permit type: Stopag | Permit id: Ea39115 | |||||
Chimney, supply and install new ga, 14 diameter steel chimney with masonry base including all brackets and heat resistant paint approx l. Ft. Date: December 16, 2009 Permit type: Gc | Permit id: Ea17159 | |||||
Inspect evaluate /review and submit a written report of the condition of the electrical system in the cellar and apartments. Please fax report to 21 Date: August 25, 2010 Permit type: Elec | Permit id: Eb07063 | |||||
Perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: May 24, 2011 Permit type: Delead | Permit id: Eb32077 | |||||
Supply and install new ga, 14 diameter steel chimney with masonry base including all brackets and heat resistant paint approx l. Ft. Cap off th Date: September 27, 2010 Permit type: Gc | Permit id: Eb08020 | |||||
Apt#41 : (1) trouble shoot and make all necessary repairs to electrical power supply system to supply adequate electrical power to all electric outlet Permit type: Elec | Permit id: Ea39113 | |||||
Apt#41 : (1) trouble shoot and make all necessary repairs to electrical power supply system to supply adequate electrical power to all electric outlet Permit type: Elec | Permit id: Ea39113 | |||||
Inspect evaluate review and submit a written report of the condition of the electrical system in the cellar and apartments. Please fax report to 21 Date: August 25, 2010 Permit type: Elec | Permit id: Eb07063 | |||||
Apt#41 : (1) trouble shoot and make all necessary repairs to electrical power supply system to supply adequate electrical power to all electric outlet Permit type: Elec | Permit id: Ea39113 | |||||
Apt#41 : (1) trouble shoot and make all necessary repairs to electrical power supply system to supply adequate electrical power to all electric outlet Permit type: Elec | Permit id: Ea39113 | |||||
Apt#1:(1) trouble shoot and make all necessary repairs to electrical power supply system to remove illegal electrical extension of cord spliced in fus Date: October 22, 2010 Permit type: Elec | Permit id: Eb11676 | |||||
Provide automatic fuel drop to the above building until futher notice #2 fuel. No prime and start necessary. (212) 863-8781 Date: November 8, 2010 Permit type: Util | Permit id: Eb14490 | |||||
Con edison provides gas to boiler/hot water heater. Date: February 23, 2006 Permit type: Util | Permit id: E625657 | |||||
Apt#1 : (1) supply and install glass pane at upper sash window in room east-3. After completion of work, ensure that entire window works properly. Date: October 13, 2010 Permit type: Gc | Permit id: Eb11674 | |||||
Apt#1: (1) supply and install code approved mortice lock at apartment entrance door including necessary adjustment with door and door frame to receive Date: August 24, 2010 Permit type: Gc | Permit id: Eb07333 | |||||
(apt #1) restore water supply to toilet tank and remove obstructions from water closet bowl. Remove all work related debris. Note: contractor m Date: July 16, 2008 Permit type: Stopag | Permit id: E901605 | |||||
(apt. #1) trace, locate and repair water leak at ceiling at bathroom. Repair and paint ceiling, approx. 25 sq. Ft. Regrout all ceramic tiles in ent Date: February 24, 2004 Permit type: Gc | Permit id: E416787 | |||||
Apt#1 : (1) trouble shoot and repair electrical power supply system to remove illegal extension cord spliced in to circuit breaker panel and to provid Date: July 23, 2010 Permit type: Elec | Permit id: Eb04830 | |||||
Con edison provides gas to boiler hot water heater. Date: February 23, 2006 Permit type: Util | Permit id: E625657 |