Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 Gas leak repair on tap connection Date: July 9, 2003 Contractor: Xcel Client: James Hearty | Applicant: Xcel | Permit type: Right-of-way | Permit status: Cmp | Completion date: March 5, 2008 | |||||
SCORE 100 Total tear-off & reroof of sfd, 15 squares of asphalt shingles on a pitch represented as 4 12. All roof materials shall be installed per manufacturerfoots specs. Mid-roof inspection required if pitch is less than 4 12. Date: December 23, 2014 Contractor: Van Lier Roofing Inc Client: Brian Haselfeld,Annie Haselfeld | Applicant: Van Lier Roofing Inc | Permit type: Roofing | Permit status: Cmp | Completion date: January 8, 2015 | Current use: Single family d | |||||
SCORE 100 Total tear-off & reroof of sfd, 15 squares of asphalt shingles on a pitch represented as 4 12. All roof materials shall be installed per manufacturerfoots specs. Mid-roof inspection required if pitch is less than 4 12. Client: Brian Haselfeld | Permit type: Roofing | Permit status: Cmp | Completion date: January 8, 2015 | Current use: Single family detached dwelling, existin | Permit id: Pmt2014-05632 | |||||
SCORE 95 Installation of replacement 80% efficient, gas-fired, 90k btu forced-air furnace. Client: Brian Haselfeld | Permit type: Mechanical | Permit status: Cmp | Completion date: April 19, 2017 | Current use: Single family detached dwelling, existin | Permit id: Pmt2017-01367 |