Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] 9. 9 kw pv system. Install (36) 275w mods, (1) 6600w inverter and (1) 3800w inverter. ![]() ![]() Permit type: Electrical | Permit status: Permit closed | Completion date: November 13, 2015 | Expiration date: September 27, 2016 | Current use: Single family / duplex | Permit id: 6497042 |