Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Vfd building (located on the site of the carrollton water treatment plant). This building is part of a larger project that consists of equipment and piping work and two (2) off-site surge control systems. The contractor for this project is to be determined following the public bid process. Permit type: New construction | Permit status: Application submitted | Current use: Not applicable - oversize load transport | Permit id: 15-20147-Newc | |||||
Place new 1" conduit from an existing telco pole on the south side of s claiborne and 219 west of leonidas directional bore 373 west on the south side of s claiborne to existing utility pole on swb property. Permit type: Street cut | Permit status: Permit approved | Current use: Business use | Permit id: 16-01425-Rstc | |||||
Installation of 2 each hertz feeders from the carrollton water plant to drainage pump station #1 - 2 circuits, 600amps Permit type: Electrical service / circuit / feeder | Permit status: Permit approved | Current use: Business use | Permit id: 14-12181-Serv | |||||
SCORE 80 Remove existing fuel tanks as per sketch, deq and state fire marshal approvals. No work to the treatment facility itself. Any further work shall require a separate permit. Permit type: Demolition | Permit status: Permit issued | Expiration date: April 23, 2016 | Current use: Business use | Permit id: 15-32009-Demo | |||||
SCORE 84 Remove existing fuel tanks as per sketch, deq and state fire marshal approvals. No work to the treatment facility itself. Any further work shall require a separate permit. Permit type: Demolition | Permit status: Permit issued | Expiration date: April 23, 2016 | Current use: Business use | Permit id: 15-32009-Demo |