Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 1. We will bring in our own dumpster and remove the existing roofing and wood shingle roofing will be torn off down to the wood deck and hauled away. 2. Existing wood decking will be inspected for any deteriorated wood decking. Home has spaced sheeting and will be resheeted with new 7 16 osb. 3. 3 feet of ice and water protective underlayment will be installed to the wood deck on the eave edges and in valleys. 4. A new synthetic felt will be nailed to roof deck as underlayment. 5. New drip metal will be installed at the roof edges, new metal will have a 12 strip of ice and water protective underlayment installed over the top at the eave edges. 6. New limited lifetime architectural style asphalt shingles will be installed in accordance with manufacturers specifications. The new shingles will be fastened with six nails (not staples) per shingle for increased wind resistance. All nails to be galvanized, large-head, roofing nails. 7. Ridgevent will be installed on the homes main ridge line Date: September 14, 2016 Contractor: Amco American Roofing Co Permit type: Roofing | Permit id: Bld2016-08628 |