RENOVATION HISTORY
Based on the information received from building department, associated with 835 Huntington Av Boston MA over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
SCORE
100
Lev-2403--replace switches receptacles lights
Date:  January 8, 2010
Value:   $700
Contractor: George Elder

Permit type: Electrical | Current use: 7more | Permit id: E10096
2010/01/08700100835 Huntington Av Boston Ma 02115George Elder
SCORE
100
30x100 frame tent set-up 06 09 13 take down 06 09 13 tenant meeting
Date:  May 30, 2013
Value:   $2,700
Contractor: Peter Harris

Permit type: Canopy | Current use: Vacld | Permit id: Sf236581
2013/05/302700100835 Huntington Av Boston Ma 02115Peter Harris
SCORE
100
Flynn building unit-307 vacancy replaced switches receptacles gfci receptacles 4-fixtures plates
Date:  September 18, 2013
Value:   $1,000
Contractor: George Elder

Permit type: Electrical | Current use: Multi | Permit id: E286745
2013/09/181000100835 Huntington Av Boston Ma 02115George Elder
SCORE
100
1-30x120 frame tent for community meeting set-up use and break down 6 8 14 in parking lot area on kempton street side of complex
Date:  May 21, 2014
Value:   $3,384
Contractor: Peter Harris

Permit type: Canopy | Current use: Vacld | Permit id: Sf363700
2014/05/213384100835 Huntington Av Boston Ma 02115Peter Harris
SCORE
100
835 huntington ave flynn building unit-312 replace switches receptacles lights
Date:  August 4, 2014
Value:   $1,000
Contractor: George Elder

Permit type: Electrical | Current use: Multi | Permit id: E391260
2014/08/041000100835 Huntington Av Boston Ma 02115George Elder
SCORE
100
Flynn building unit-2406- replaced switches receptacles gfci receptacles 4- fixtures
Date:  September 15, 2014
Value:   $1,200
Contractor: George Elder

Permit type: Electrical | Current use: Multi | Permit id: E406601
2014/09/151200100835 Huntington Av Boston Ma 02115George Elder
SCORE
100
Levinson building unit-2506- vacancy replaced switches receptacles gfci receptacles 4- light fixtures plates
Date:  December 18, 2014
Value:   $1,500
Contractor: George Elder

Permit type: Electrical | Current use: Multi | Permit id: E435313
2014/12/181500100835 Huntington Av Boston Ma 02115George Elder
Replace (3) defective os&;y gate valves in fire pump room. Building shut down. Bfd paid detail required
Date:  September 25, 2012

Permit status: Na | Permit id: Sprk183516
2012/09/25095835 Huntington Av Boston Ma 02115
Replace corroded section of pipe on suction side of fire pump. Pump shut down required. Work to be done per nfpa stands. 7 cmr.; bfd paid detail required of 1 officer; 3 fire fighters with pump set up 30-minutes before start of the shut-down. Bfd paid detail required
Date:  October 9, 2013

Permit status: Na | Permit id: Sprk288247
2013/10/09095835 Huntington Av Boston Ma 02115
Stand lift truck &; chipper at curb pedestrian staging on sidewalk
Date:  December 6, 2012

Permit type: Cranes | Permit status: Expired | Permit id: Occu-205726
2012/12/06095835 Huntington Av Boston Ma 02115
Replace corroded sections of piping and valve in fire pump room
Date:  September 4, 2014

Permit status: Na | Permit id: Sprk393928
2014/09/04095835 Huntington Av Boston Ma 02115
Replace existing pressure restricting valves with new pressure regulating valves on standpipe sprinkler system where pressure exceeds 175 psi floors 1-27 work to be done one floor and one riser at a time.; impaired riser to be clearly labled.; bfd detail with pumper required for building shut down.;fire;department connection to remain in service.
Date:  August 31, 2010

Permit status: Na | Permit id: Sprk36147
2010/08/31095835 Huntington Av Boston Ma 02115
Emergency panel replacement replace damaged fire control panel doc20110263
Date:  March 7, 2011

Permit status: Na | Permit id: Bfdf66548
2011/03/07095835 Huntington Av Boston Ma 02115
Install new fire alarm devices.; tenant 1st floor after school program~; doc# 20120363 work to be done per nfpa stands.
Date:  April 25, 2012

Permit status: Na | Permit id: Bfdf128829
2012/04/25095835 Huntington Av Boston Ma 02115
Install new fire alarm as per plans for management office doc20120460
Date:  June 28, 2012

Permit status: Na | Permit id: Bfdf139658
2012/06/28095835 Huntington Av Boston Ma 02115
Installation of fire alarm devices per drawings in unit - 506; ~; doc# 20150345
Date:  July 9, 2015

Permit status: Na | Permit id: Bfdf482697
2015/07/09095835 Huntington Av Boston Ma 02115
Only one floor shall be impaired at any given time installation inaccordance with nfpa 13 and 7 cmr.
Date:  June 26, 2014

Permit status: Na | Permit id: Sprk371962
2014/06/26095835 Huntington Av Boston Ma 02115
Remove &; install new boilers bfd paid detail required
Date:  May 31, 2012

Permit status: Na | Permit id: Cbw145858
2012/05/31095835 Huntington Av Boston Ma 02115
Welding/burning for removal of existing sidewalk lift dpl 8/19/15 bfd paid detail required
Date:  June 10, 2015

Permit status: Na | Permit id: Cbw479147
2015/06/10095835 Huntington Av Boston Ma 02115
To remove asbesos
Date:  March 7, 2012

Permit status: Na | Permit id: Asb123478
2012/03/07095835 Huntington Av Boston Ma 02115
Installation of upho
Date:  July 17, 2012

Permit status: Na | Permit id: Chm161092
2012/07/17095835 Huntington Av Boston Ma 02115
Welding for replacemnt of heating valves (dpl) bfd paid detail required
Date:  September 8, 2011

Permit status: Na | Permit id: Cbw93962
2011/09/08095835 Huntington Av Boston Ma 02115
Welding for installation of new replacement heating valves (dpl) bfd paid detail required
Date:  September 30, 2011

Permit status: Na | Permit id: Cbw97788
2011/09/30095835 Huntington Av Boston Ma 02115
Welding for emergency repairs to domestic hot water system including leaks and distribution problems bfd paid detail required
Date:  December 3, 2012

Permit status: Na | Permit id: Cbw204753
2012/12/03095835 Huntington Av Boston Ma 02115
Cutting &; welding to the underside of the metal trash containers (dpl);
Date:  May 15, 2013

Permit status: Na | Permit id: Cbw240879
2013/05/15095835 Huntington Av Boston Ma 02115
Welding to facilate emergency repairs on 10" heating lines (dpl) bfd paid detail required
Date:  September 12, 2013

Permit status: Na | Permit id: Cbw284342
2013/09/12095835 Huntington Av Boston Ma 02115
To bag smoke detectors due to drilling
Date:  August 30, 2011

Permit status: Na | Permit id: Bsd92548
2011/08/30095835 Huntington Av Boston Ma 02115
Welding for replacement of new heating valves (dpl) bfd paid detail required
Date:  September 30, 2011

Permit status: Na | Permit id: Cbw97842
2011/09/30095835 Huntington Av Boston Ma 02115
Install dialer for town-house fire alarm systems doc#20110093
Date:  March 4, 2011

Permit status: Na | Permit id: Bfdf62522
2011/03/04095835 Huntington Av Boston Ma 02115
Welding for replacemnt of heating valves (dpl) bfd paid detail required
Date:  September 8, 2011

Permit status: Na | Permit id: Cbw93960
2011/09/08095835 Huntington Av Boston Ma 02115
Construction on 1st floor
Date:  January 19, 2011

Permit status: Na | Permit id: Bsd59199
2011/01/19095835 Huntington Av Boston Ma 02115
Cutting / welding for installation of replacement heating valves (dpl) 2-firefighters bfd paid detail required
Date:  May 31, 2011

Permit status: Na | Permit id: Cbw78839
2011/05/31095835 Huntington Av Boston Ma 02115
Welding for emergency repair to hot water distribution systems (dpl)
Date:  May 17, 2013

Permit status: Na | Permit id: Cbw243578
2013/05/17095835 Huntington Av Boston Ma 02115
SCORE
93
Replacing toilets lavs kitchen sinks
Date:  January 13, 2017
Value:   $5,000
Contractor: John Cresta

Permit type: Plumbing | Permit status: Open | Current use: Comm | Permit id: Pl672698
2017/01/13500093835 Huntington Av Boston Ma 02115John Cresta
SCORE
72
Total renovating of office space and lobby with;between two;separate buildings the duggan and livinston buildings. Construction of wall framing new heating and electrical systems. Modification of sprinkler system. Duggan building will have an extention of office space by 6x25 with a foundation. The livinston lobby will be extended out by 10x25 at both entrances
Date:  January 27, 2017
Value:   $1,002,874
Contractor: John Donato

Permit type: Interior/exterior work | Permit status: Open | Current use: Comm | Permit id: Alt662885
2017/01/27100287472835 Huntington Av Boston Ma 02115John Donato
SCORE
59
Removal of ceilings walls and flooring in two offices long form to be filed to extend store front
Date:  December 1, 2016
Value:   $20,000
Contractor: Domenic Ricci

Permit type: Renovations -interior nsc | Permit status: Open | Current use: Comm | Permit id: Sf661974
2016/12/012000059835 Huntington Av Boston Ma 02115Domenic Ricci
SCORE
100
Flynn 205 demo rough finish kitchen and bathroom renovation panel is moving. 5 ft no disconnect is needed at circuit needed
Date:  December 2, 2016
Value:   $8,000
Contractor: Matthew Glynn

Permit type: Electrical | Permit status: Open | Current use: Multi | Permit id: E659928
2016/12/028000100835 Huntington Av Boston Ma 02115Matthew Glynn
SCORE
100
Neville 805 demo rough finish kitchen and bathroom renovation panel is moving 5 feet no disconnect is needed at circuit needed.
Date:  December 13, 2016
Value:   $10,000
Contractor: Matthew Glynn

Permit type: Electrical | Permit status: Open | Current use: Multi | Permit id: E663379
2016/12/1310000100835 Huntington Av Boston Ma 02115Matthew Glynn
SCORE
88
Installation of a low-voltage wireless burglar alarm
Date:  December 14, 2016
Value:   $850
Contractor: Laura Gardner

Permit type: Low voltage | Permit status: Open | Current use: 1-2fam | Permit id: Elv665166
2016/12/1485088835 Huntington Av Boston Ma 02115Laura Gardner
SCORE
91
Lobby renovations duggan and levinson
Date:  February 2, 2017
Value:   $56,980
Contractor: William Werle

Permit type: Electrical | Permit status: Open | Current use: Mixed | Permit id: E677895
2017/02/025698091835 Huntington Av Boston Ma 02115William Werle
SCORE
91
Duggan and levinson lobbies: install (1) smoke detector (4) pull stations (3) speaker strobes (4) strobes
Date:  June 22, 2017
Value:   $4,000
Contractor: William Werle

Permit type: Fire alarm | Permit status: Open | Current use: Mixed | Permit id: Efa723528
2017/06/22400091835 Huntington Av Boston Ma 02115William Werle
SCORE
100
Address is 835 huntington ave replace and retrofit light fixtures
Date:  April 25, 2017
Value:   $12,000
Contractor: Nathan Hewes

Permit type: Electrical | Permit status: Open | Current use: Multi | Permit id: E701804
2017/04/2512000100835 Huntington Av Boston Ma 02115Nathan Hewes
SCORE
100
Neville building install 2 temporary wiring to 2 temp trailers that were already temp out to other construction site now temp out to mission park
Date:  March 17, 2016
Value:   $3,500
Contractor: George Elder

Permit type: Electrical | Permit status: Expired | Current use: Comm | Permit id: E571602
2016/03/173500100835 Huntington Av Boston Ma 02115George Elder
SCORE
100
Duggan building 602- vacancy- replaced switches receptacles gfci receptacles 4- light fixtures plates
Date:  March 31, 2015
Value:   $1,300
Contractor: George Elder

Permit type: Electrical | Permit status: Expired | Current use: Multi | Permit id: E457936
2015/03/311300100835 Huntington Av Boston Ma 02115George Elder
SCORE
100
Duggan building 607- vacancy- replaced switches receptacles gfci receptacles 4- light fixtures
Date:  March 31, 2015
Value:   $2,000
Contractor: George Elder

Permit type: Electrical | Permit status: Expired | Current use: Multi | Permit id: E457935
2015/03/312000100835 Huntington Av Boston Ma 02115George Elder
SCORE
100
Flynn building 608- vacancy replaced switches receptacles gfci receptacles plates 4-light fixtures
Date:  March 31, 2015
Value:   $1,300
Contractor: George Elder

Permit type: Electrical | Permit status: Expired | Current use: Multi | Permit id: E457937
2015/03/311300100835 Huntington Av Boston Ma 02115George Elder
SCORE
100
Installation of security system
Date:  March 31, 2015
Value:   $31,962
Contractor: Mark Brophy

Permit type: Low voltage | Permit status: Expired | Current use: Comm | Permit id: Elv457420
2015/03/3131962100835 Huntington Av Boston Ma 02115Mark Brophy
SCORE
88
Demo bathroom ;new tile;flooring tub surround;tile painting. 605 flynn building
Date:  April 15, 2016
Value:   $79,250
Contractor: Francis Fasoli

Permit type: Renovations -interior nsc | Permit status: Expired | Current use: Multi | Permit id: Sf580552
2016/04/157925088835 Huntington Av Boston Ma 02115Francis Fasoli
SCORE
100
Replace kitchen ada bath
Date:  July 24, 2014
Value:   $7,500
Contractor: Adenis Camara

Permit type: Plumbing | Current use: Multi | Permit id: Pl387707
2014/07/247500100835 Huntington Av Boston Ma 02115Adenis Camara
SCORE
95
Unit 906 demo rough finish kitchen reno and bathroom reno panel is moving 5 ft but no disconnect of circuits needed
Date:  November 30, 2015
Value:   $16,720
Contractor: Amanda Williams

Permit type: Electrical | Permit status: Open | Current use: 1-2fam | Permit id: E542973
2015/11/301672095835 Huntington Av Boston Ma 02115Amanda Williams
SCORE
98
Demolition and renovation of an existing management office space.
Date:  May 24, 2012
Value:   $107,000
Contractor: Adam Goodrich

Permit type: Renovations -interior nsc | Current use: Comm | Permit id: Alt124174
2012/05/2410700098835 Huntington Av Boston Ma 02115Adam Goodrich
SCORE
100
Flynn building unit 1799 vacancy replaced switches receptacles gfci receptacles plates 4-light fixtures
Date:  January 13, 2015
Value:   $1,500
Contractor: George Elder

Permit type: Electrical | Permit status: Expired | Current use: Multi | Permit id: E441019
2015/01/131500100835 Huntington Av Boston Ma 02115George Elder
SCORE
100
Flynn building-apartment 404- replaced switches receptacles gfci receptacles plates fixtures
Date:  April 8, 2013
Value:   $900
Contractor: George Elder

Permit type: Electrical | Current use: Other | Permit id: E233577
2013/04/08900100835 Huntington Av Boston Ma 02115George Elder
SCORE
96
Installation of new shell and tube heat exchangers for existing storage tank
Date:  April 24, 2012
Value:   $100,000
Contractor: Joseph Milner

Permit type: Plumbing | Current use: 7more | Permit id: Pl133545
2012/04/2410000096835 Huntington Av Boston Ma 02115Joseph Milner
SCORE
100
Neville building -unit-907-replaced switches receptacles . Gfci receptacles light fixtures
Date:  September 15, 2014
Value:   $1,200
Contractor: George Elder

Permit type: Electrical | Current use: Multi | Permit id: E406602
2014/09/151200100835 Huntington Av Boston Ma 02115George Elder
SCORE
97
Small management office remodel
Date:  June 13, 2012
Value:   $15,000
Contractor: Kevin Callahan

Permit type: Electrical | Current use: Comm | Permit id: E150848
2012/06/131500097835 Huntington Av Boston Ma 02115Kevin Callahan
SCORE
97
Flynn kitchen renovation. New appliances and lighting
Date:  January 23, 2012
Value:   $15,000
Contractor: Kevin Callahan

Permit type: Electrical | Current use: Mixed | Permit id: E115672
2012/01/231500097835 Huntington Av Boston Ma 02115Kevin Callahan
SCORE
100
835 huntington ave neville building -unit-1103- vacancy replaced switches receptacles gfci receptacles plates 4-lights
Date:  January 7, 2014
Value:   $2,000
Contractor: George Elder

Permit type: Electrical | Current use: Multi | Permit id: E316654
2014/01/072000100835 Huntington Av Boston Ma 02115George Elder
SCORE
82
Add 1 floor drain
Date:  January 26, 2011
Value:   $3,000
Contractor: Wayne Beane

Permit type: Plumbing | Current use: 7more | Permit id: Pl61715
2011/01/26300082835 Huntington Av Boston Ma 02115Wayne Beane
SCORE
82
Install rooftop fall protection anchorage on levinson neville house duggan and flynn buildings at mission park.
Date:  June 17, 2011
Value:   $300,000
Contractor: Brett Emery

Permit type: Roofing | Current use: 7more | Permit id: Sf82276
2011/06/1730000082835 Huntington Av Boston Ma 02115Brett Emery
SCORE
79
Flynn building-unit504- replace devices switches outlets and bath kitchen gfci devices
Date:  May 21, 2014
Value:   $1,150
Contractor: Matt Elder

Permit type: Electrical | Current use: Multi | Permit id: E364944
2014/05/21115079835 Huntington Av Boston Ma 02115Matt Elder
SCORE
79
Erect staging and remove and reinstall windows replace brick at facade (at floors 9 thru 14) repair wall studs and insulation and provide new wall waterproofing.
Date:  September 2, 2011
Value:   $89,000
Contractor: Jeffrey Soderquist

Permit type: Renovations - exterior | Current use: Multi | Permit id: Sf93981
2011/09/028900079835 Huntington Av Boston Ma 02115Jeffrey Soderquist
SCORE
95
Main lobby: replace storefronts at front and rear replace accoustical ceiling install new flooring paint and electrical work
Date:  January 23, 2012
Value:   $154,522
Contractor: Chris Sullivan

Permit type: Interior/exterior work | Current use: 7more | Permit id: Sf114741
2012/01/2315452295835 Huntington Av Boston Ma 02115Chris Sullivan
SCORE
97
To fit-up units per drawings
Date:  August 14, 2013
Value:   $6,500
Contractor: David Leblanc

Permit type: Electrical | Current use: Multi | Permit id: E274120
2013/08/14650097835 Huntington Av Boston Ma 02115David Leblanc
SCORE
100
Levionson building unit-#-1204-replaced switches receptacles in 2- bedrooms living room hall way light
Date:  February 18, 2014
Value:   $1,000
Contractor: George Elder

Permit type: Electrical | Current use: Multi | Permit id: E326920
2014/02/181000100835 Huntington Av Boston Ma 02115George Elder
SCORE
100
Levinson building - unit-2706-vacancy replaced switches receptacles gfci receptacles replaced 4- fixtures
Date:  July 5, 2013
Value:   $1,000
Contractor: George Elder

Permit type: Electrical | Current use: Other | Permit id: E260401
2013/07/051000100835 Huntington Av Boston Ma 02115George Elder
SCORE
96
Replace 14 light fixtures and reconnect elec. Doors at building lobby address of work: 835 huntington ave boston 02115 (levinson building)
Date:  April 20, 2012
Value:   $1,000
Contractor: J Lotto

Permit type: Electrical | Current use: Other | Permit id: E133427
2012/04/20100096835 Huntington Av Boston Ma 02115J Lotto
SCORE
95
Unit 705 renovation including -install switches fixtures and receptacles per drawing -new cabling where needed -junction boxes to extend existing wiring where needed -utilizing existing main phone data and electrical feeds
Date:  December 4, 2014
Value:   $7,000
Contractor: Amanda Williams

Permit type: Electrical | Current use: 1-2fam | Permit id: E430505
2014/12/04700095835 Huntington Av Boston Ma 02115Amanda Williams
SCORE
100
Neville building unit 202- replaced switches receptacles lights
Date:  August 4, 2014
Value:   $1,000
Contractor: George Elder

Permit type: Electrical | Current use: Multi | Permit id: E391259
2014/08/041000100835 Huntington Av Boston Ma 02115George Elder
SCORE
59
Removal of cctv cameras and reinstall after renovations are complete. Using existing wireing.
Date:  February 21, 2012
Value:   $700
Contractor: Joshua Carmody

Permit type: Low voltage | Current use: Comm | Permit id: Elv120422
2012/02/2170059835 Huntington Av Boston Ma 02115Joshua Carmody
SCORE
100
Remodel three piece bath group kitchen laundry
Date:  January 12, 2015
Value:   $5,000
Contractor: Stephen Mcelhinney

Permit type: Plumbing | Permit status: Expired | Current use: 1-2fam | Permit id: Pl440878
2015/01/125000100835 Huntington Av Boston Ma 02115Stephen Mcelhinney
SCORE
100
Install a new generator and eliminate 2 existing generators
Date:  August 25, 2015
Value:   $440,000
Contractor: Matthew Glynn

Permit type: Electrical | Permit status: Open | Current use: Comm | Permit id: E511283
2015/08/25440000100835 Huntington Av Boston Ma 02115Matthew Glynn
SCORE
100
Neville building unit-#-517- vacancy replaced switches receptacles gfci receptacles plates bedroom living room bathroom
Date:  March 10, 2014
Value:   $1,000
Contractor: George Elder

Permit type: Electrical | Current use: Multi | Permit id: E342108
2014/03/101000100835 Huntington Av Boston Ma 02115George Elder
SCORE
100
Install digital alarm communications panel for 18 residential multi-family buildings and 1 community center per plans.
Date:  June 10, 2011
Value:   $36,700
Contractor: John Gorman

Permit type: Fire alarm | Current use: Multi | Permit id: Alt54394
2011/06/1036700100835 Huntington Av Boston Ma 02115John Gorman
SCORE
100
Levinson building unit 303 -vacancy replaced switches receptacles gfci receptacles plates 4- lights
Date:  November 5, 2013
Value:   $1,000
Contractor: George Elder

Permit type: Electrical | Current use: Multi | Permit id: E301576
2013/11/051000100835 Huntington Av Boston Ma 02115George Elder
SCORE
95
Fire alarm for material lift. Add 1 smoke detector and relay for damper.
Date:  January 29, 2016
Value:   $1,500
Contractor: Amanda Williams

Permit type: Fire alarm | Permit status: Open | Current use: 1-2fam | Permit id: Efa558392
2016/01/29150095835 Huntington Av Boston Ma 02115Amanda Williams
SCORE
69
Flooring paining repairs
Date:  July 29, 2010
Value:   $6,500
Contractor: Vadym Huzenko

Permit type: Interior/exterior work | Current use: 1-2fam | Permit id: Sf36007
2010/07/29650069835 Huntington Av Boston Ma 02115Vadym Huzenko
SCORE
95
Installatios of fire alarm devices per drawings in unit 906
Date:  January 29, 2016
Value:   $16,720
Contractor: Amanda Williams

Permit type: Fire alarm | Permit status: Open | Current use: 1-2fam | Permit id: Efa542999
2016/01/291672095835 Huntington Av Boston Ma 02115Amanda Williams
SCORE
100
Install temporary heaters in rth community center building
Date:  January 8, 2010
Value:   $1,000
Contractor: George Elder

Permit type: Electrical | Current use: 7more | Permit id: E9976
2010/01/081000100835 Huntington Av Boston Ma 02115George Elder
SCORE
100
Unit 405 - demo rough finish kitchen and bathroom renovation. Panel is moving 5 ft but no disconnect of circuit needed
Date:  February 4, 2016
Value:   $8,000
Contractor: Matthew Glynn

Permit type: Electrical | Permit status: Expired | Current use: 1-2fam | Permit id: E560464
2016/02/048000100835 Huntington Av Boston Ma 02115Matthew Glynn
SCORE
100
Installation of security system
Date:  May 26, 2015
Value:   $3,840
Contractor: Mark Brophy

Permit type: Low voltage | Permit status: Expired | Current use: Comm | Permit id: Elv472875
2015/05/263840100835 Huntington Av Boston Ma 02115Mark Brophy
SCORE
86
Installation of a 24x44 construction trailer to be utilized as a sales and marketing trailer for the rth the riverway project located at fenwood road which is currently under construction. ( may 7 15 to; may 7 16 )
Date:  May 7, 2015
Value:   $50,000
Contractor: Jay Rodriguez

Permit type: Temporary trailers | Permit status: Expired | Current use: Comm | Permit id: Sf469414
2015/05/075000086835 Huntington Av Boston Ma 02115Jay Rodriguez
SCORE
100
Install 7- pole lights and trench from fixture to fixture behind flynn building in walk way
Date:  September 8, 2010
Value:   $20,000
Contractor: George Elder

Permit type: Electrical | Current use: 1-2fam | Permit id: E41673
2010/09/0820000100835 Huntington Av Boston Ma 02115George Elder
SCORE
100
Neville-unit-212 -replace switches receptacles light fixtures cell #:; 617 590 3056
Date:  July 8, 2010
Value:   $600
Contractor: George Elder

Permit type: Electrical | Permit status: Expired | Current use: 7more | Permit id: E32710
2010/07/08600100835 Huntington Av Boston Ma 02115George Elder
SCORE
95
Unit #506 demo rough finish kitchen reno and bathroom reno -panel is moving 5ft but no disconnect of circuits needed
Date:  May 7, 2015
Value:   $8,000
Contractor: Amanda Williams

Permit type: Electrical | Permit status: Expired | Current use: Comm | Permit id: E469400
2015/05/07800095835 Huntington Av Boston Ma 02115Amanda Williams
SCORE
100
Levinson building install 30-amp disconnect and wiring for freight elevator switch & light install wiring for 2-ton a/c unit and general purpose receptacle
Date:  September 16, 2015
Value:   $4,000
Contractor: George Elder

Permit type: Electrical | Permit status: Expired | Current use: Multi | Permit id: E519957
2015/09/164000100835 Huntington Av Boston Ma 02115George Elder
SCORE
82
Install 2 spare 3 inch pipe runs; install pipe and wiring for 14 street lights on new whitney street.
Date:  August 31, 2016
Value:   $70,000
Contractor: Matthew Elder

Permit type: Electrical | Permit status: Open | Current use: Comm | Permit id: E630324
2016/08/317000082835 Huntington Av Boston Ma 02115Matthew Elder
SCORE
86
Replace tiolet and lav and install kithchen sink with new rough and finish plumbing
Date:  March 8, 2012
Value:   $6,000
Contractor: Jeff Bean

Permit type: Plumbing | Current use: Comm | Permit id: Pl122825
2012/03/08600086835 Huntington Av Boston Ma 02115Jeff Bean
SCORE
86
Low voltage wiring - 1st. Floor.
Date:  March 8, 2012
Value:   $1,800
Contractor: R Monroe

Permit type: Electrical | Current use: Comm | Permit id: Elv123731
2012/03/08180086835 Huntington Av Boston Ma 02115R Monroe
SCORE
100
Flynn building 805- vacancy replace switches receptacles gfic receptacles plates 6- fixtures
Date:  September 27, 2013
Value:   $1,500
Contractor: George Elder

Permit type: Electrical | Current use: Multi | Permit id: E289042
2013/09/271500100835 Huntington Av Boston Ma 02115George Elder
SCORE
100
Flynn building unit 508- vacancy -replaced switches receptacles gfci receptacles plates light fixtures
Date:  September 9, 2013
Value:   $1,500
Contractor: George Elder

Permit type: Electrical | Current use: Multi | Permit id: E282885
2013/09/091500100835 Huntington Av Boston Ma 02115George Elder
SCORE
100
25 st albans st -replace switches receptacles lights cell #:; 617 590 3056
Date:  July 8, 2010
Value:   $700
Contractor: George Elder

Permit type: Electrical | Permit status: Expired | Current use: 7more | Permit id: E32742
2010/07/08700100835 Huntington Av Boston Ma 02115George Elder
SCORE
82
Renovation to the apartment building.
Date:  December 2, 2014
Value:   $7,500
Contractor: Erika Johnson

Permit type: Electrical | Current use: Comm | Permit id: E430869
2014/12/02750082835 Huntington Av Boston Ma 02115Erika Johnson
SCORE
100
Levinson building -vacancy unit 906- replaced switches receptacles gfci receptacle replaced 4- fixtures
Date:  July 5, 2013
Value:   $1,500
Contractor: George Elder

Permit type: Electrical | Current use: Other | Permit id: E260428
2013/07/051500100835 Huntington Av Boston Ma 02115George Elder
SCORE
99
Interior non-structural modifications to existing unit. Work to include new kitchen cabinets & countertop bathroom upgrade removing tub and install shower base. Erect walls and finish tiles. (unit 206)
Date:  June 5, 2014
Value:   $65,350
Contractor: Michael Leung

Permit type: Renovations -interior nsc | Current use: Multi | Permit id: Sf370420
2014/06/056535099835 Huntington Av Boston Ma 02115Michael Leung
SCORE
100
Flynn building unit 406- replace switches receptacles gfci receptacles . Phone & cable jacks light fixtures
Date:  September 2, 2014
Value:   $1,000
Contractor: George Elder

Permit type: Electrical | Current use: Multi | Permit id: E403270
2014/09/021000100835 Huntington Av Boston Ma 02115George Elder
SCORE
98
Change off occupancy from day care to after school program. Renovating current space into a after school program space. Fire alarm and sprinkler .;full interior renovation
Date:  January 17, 2012
Value:   $253,210
Contractor: Adam Goodrich

Permit type: Renovations -interior nsc | Current use: Mixed | Permit id: Alt105798
2012/01/1725321098835 Huntington Av Boston Ma 02115Adam Goodrich
SCORE
96
Installing ten gas fired boilers and one gas fired mae up air unit
Date:  April 24, 2012
Value:   $500,000
Contractor: Joseph Milner

Permit type: Gas | Current use: 7more | Permit id: G133471
2012/04/2450000096835 Huntington Av Boston Ma 02115Joseph Milner
SCORE
100
Levinson building -unit-807- replace switches receptacles gfci receptacles light fixtures (vacancy)
Date:  June 6, 2013
Value:   $800
Contractor: George Elder

Permit type: Electrical | Current use: Multi | Permit id: E250631
2013/06/06800100835 Huntington Av Boston Ma 02115George Elder
SCORE
100
835 huntington ave levinson building unit-2009- replaced switches receptacles plates 4-light fixtures
Date:  November 19, 2014
Value:   $2,000
Contractor: George Elder

Permit type: Electrical | Current use: Multi | Permit id: E427026
2014/11/192000100835 Huntington Av Boston Ma 02115George Elder
SCORE
100
Levinson -2604- replace switches receptacles lights cell #:; 617 590 3056
Date:  July 8, 2010
Value:   $700
Contractor: George Elder

Permit type: Electrical | Permit status: Expired | Current use: 7more | Permit id: E32719
2010/07/08700100835 Huntington Av Boston Ma 02115George Elder
SCORE
79
Install temporary electrical panel at kempton street for outside community meeting june 8th
Date:  May 30, 2014
Value:   $1,000
Contractor: Matt Elder

Permit type: Electrical | Current use: Multi | Permit id: E368158
2014/05/30100079835 Huntington Av Boston Ma 02115Matt Elder
SCORE
100
4 mission park dr- install pipe and wiring for outside gfci receptacle for air quality unit on building ; cell #:; 617 590 3056
Date:  July 8, 2010
Value:   $500
Contractor: George Elder

Permit type: Electrical | Permit status: Expired | Current use: 7more | Permit id: E32744
2010/07/08500100835 Huntington Av Boston Ma 02115George Elder
SCORE
96
30x1 frame tent set-up 06/09/13 take down 06/09/13 tenant meeting
Date:  May 30, 2013
Value:   $2,700

Permit type: Canopy | Permit status: Expired | Current use: Vacld | Permit id: Sf236581
2013/05/30270096835 Huntington Av Boston Ma 02115Boston Party Rental Inc
SCORE
71
Replacement of damaged parts in fire alarm control panel as a result of a sprinkler head break.
Date:  April 11, 2011
Value:   $50,000
Contractor: Pauric Baxter

Permit type: Fire alarm | Current use: Other | Permit id: Efa71750
2011/04/115000071835 Huntington Av Boston Ma 02115Pauric Baxter
SCORE
96
1-30x1 frame tent for community meeting set-up use and break down 6/8/14 in parking lot area on kempton street side of complex
Date:  May 21, 2014
Value:   $3,384

Permit type: Canopy | Permit status: Expired | Current use: Vacld | Permit id: Sf363700
2014/05/21338496835 Huntington Av Boston Ma 02115Boston Party Rental Inc
SCORE
71
Repair of fire alarm panel damaged as a result of a sprinkler break requiring the replacment of multiple parts in the fire control panel.
Date:  April 11, 2011
Value:   $1
Contractor: Pauric Baxter

Permit type: Fire alarm | Current use: Other | Permit id: Sf71745
2011/04/11171835 Huntington Av Boston Ma 02115Pauric Baxter
SCORE
100
Conduit and wire for boiler control and mua at mission park levinson building
Date:  November 6, 2012
Value:   $16,500
Contractor: Dana Crosby

Permit type: Low voltage | Current use: Multi | Permit id: Elv184740
2012/11/0616500100835 Huntington Av Boston Ma 02115Dana Crosby
SCORE
100
Flynn building -unit-801- remodel bathroom & kitchen relocate electrical panel replaced switches receptacles gfci receptacles
Date:  January 6, 2015
Value:   $4,000
Contractor: George Elder

Permit type: Electrical | Permit status: Expired | Current use: Multi | Permit id: E439307
2015/01/064000100835 Huntington Av Boston Ma 02115George Elder
SCORE
65
Legal occupancy:; 240 apartments after school program parking garage and wireless communications. Doc.#1153 2009. C o -;after school program. Alt#105798 issued: 1 17 2012.
Date:  August 23, 2012
Value:   $95,934
Contractor: Madeline Stein

Permit type: Renovations -interior nsc | Permit status: Expired | Current use: Mixed | Permit id: Coo156081
2012/08/239593465835 Huntington Av Boston Ma 02115Madeline Stein
SCORE
100
Replace one backflow preventer for pool water supply.
Date:  July 7, 2010
Value:   $500
Contractor: Stephen Mcelhinney

Permit type: Plumbing | Current use: Multi | Permit id: Pl32691
2010/07/07500100835 Huntington Av Boston Ma 02115Stephen Mcelhinney
SCORE
100
Renovation of front and elevator lobby areas. Installation of lighting in lobbies
Date:  January 14, 2011
Value:   $10,000
Contractor: Richard Piazza

Permit type: Electrical | Current use: 7more | Permit id: E58819
2011/01/1410000100835 Huntington Av Boston Ma 02115Richard Piazza
SCORE
100
Levinson building -1206-vacancy-replace switches receptacles gfci receptacles light fixtures
Date:  December 2, 2010
Value:   $1,000
Contractor: George Elder

Permit type: Electrical | Current use: 7more | Permit id: E53929
2010/12/021000100835 Huntington Av Boston Ma 02115George Elder
SCORE
100
Levinson building unit-2607-vacancy replaced switches receptacles gfci receptacles replaced 5- fixtures
Date:  July 11, 2013
Value:   $1,200
Contractor: George Elder

Permit type: Electrical | Current use: Multi | Permit id: E261879
2013/07/111200100835 Huntington Av Boston Ma 02115George Elder
SCORE
100
Duggan building unit 1301- vacancy replaced switches receptacles gfci receptales light fixtures
Date:  September 10, 2013
Value:   $1,000
Contractor: George Elder

Permit type: Electrical | Current use: Multi | Permit id: E284123
2013/09/101000100835 Huntington Av Boston Ma 02115George Elder
SCORE
100
Duggan building apartment 809- replaced switches receptacles fixtures plates
Date:  April 8, 2013
Value:   $850
Contractor: George Elder

Permit type: Electrical | Current use: Other | Permit id: E233571
2013/04/08850100835 Huntington Av Boston Ma 02115George Elder
SCORE
97
Data and cable installations in afterschool program area renovation
Date:  January 23, 2012
Value:   $2,500
Contractor: Kevin Callahan

Permit type: Low voltage | Current use: Mixed | Permit id: Elv115669
2012/01/23250097835 Huntington Av Boston Ma 02115Kevin Callahan
SCORE
100
Vacancy -flynn building unit 505 - replace switches receptacles lights
Date:  October 21, 2010
Value:   $1,000
Contractor: George Elder

Permit type: Electrical | Current use: 7more | Permit id: E47365
2010/10/211000100835 Huntington Av Boston Ma 02115George Elder
SCORE
97
Rework existing fire alarm system to accomodate new kitchen layout
Date:  January 23, 2012
Value:   $4,000
Contractor: Kevin Callahan

Permit type: Fire alarm | Current use: Mixed | Permit id: Efa115674
2012/01/23400097835 Huntington Av Boston Ma 02115Kevin Callahan
SCORE
83
Installing (2)addressable relays and (1) addressable smoke with programming to complete elevator modifications
Date:  June 2, 2010
Value:   $2,000
Contractor: John Spadafora

Permit type: Fire alarm | Current use: Comm | Permit id: Efa28139
2010/06/02200083835 Huntington Av Boston Ma 02115John Spadafora
SCORE
100
Install temporary electrical panel for outside community meeting
Date:  June 9, 2010
Value:   $500
Contractor: George Elder

Permit type: Electrical | Current use: 7more | Permit id: E28747
2010/06/09500100835 Huntington Av Boston Ma 02115George Elder
SCORE
100
Levinson building apt-1308- replaced switches lights receptacles
Date:  January 23, 2013
Value:   $800
Contractor: George Elder

Permit type: Electrical | Current use: Other | Permit id: E213537
2013/01/23800100835 Huntington Av Boston Ma 02115George Elder
SCORE
100
Renovating kitchen and bathroom.
Date:  August 14, 2013
Value:   $8,000
Contractor: Douglas Wambolt

Permit type: Plumbing | Current use: Comm | Permit id: Pl272349
2013/08/148000100835 Huntington Av Boston Ma 02115Douglas Wambolt
SCORE
100
Duggan building -unit 304 - replaced switches receptacles gfci receptacles plates . 4-light fixtures
Date:  January 6, 2015
Value:   $2,000
Contractor: George Elder

Permit type: Electrical | Permit status: Expired | Current use: Multi | Permit id: E439306
2015/01/062000100835 Huntington Av Boston Ma 02115George Elder
SCORE
100
835 huntington ave- levinson building water damages install 8 temporary heater temporary lights disconnect water damaged devices as needed & lights
Date:  February 17, 2015
Value:   $100,000
Contractor: George Elder

Permit type: Electrical | Permit status: Expired | Current use: Multi | Permit id: E447693
2015/02/17100000100835 Huntington Av Boston Ma 02115George Elder
SCORE
100
Duggan-bld.-301- replace switches receptacles lights
Date:  January 8, 2010
Value:   $700
Contractor: George Elder

Permit type: Electrical | Current use: 7more | Permit id: E10091
2010/01/08700100835 Huntington Av Boston Ma 02115George Elder
SCORE
97
Fire alarm modifications for afterschool program
Date:  January 23, 2012
Value:   $6,000
Contractor: Kevin Callahan

Permit type: Fire alarm | Current use: Mixed | Permit id: Efa115668
2012/01/23600097835 Huntington Av Boston Ma 02115Kevin Callahan
SCORE
100
Flynn building -unit-799 -replaced switches receptacles gfci receptacles plates
Date:  September 18, 2014
Value:   $1,500
Contractor: George Elder

Permit type: Electrical | Current use: Multi | Permit id: E408722
2014/09/181500100835 Huntington Av Boston Ma 02115George Elder
SCORE
100
Install temporary generator on stand by existing in house generator is off line install at levinson building
Date:  January 24, 2014
Value:   $3,000
Contractor: George Elder

Permit type: Electrical | Current use: Multi | Permit id: E321749
2014/01/243000100835 Huntington Av Boston Ma 02115George Elder
SCORE
100
Electrical demo of old boilers. Power wiring includes (10) boiler and pumps. Install new motor control center. Furnish and install new feeders. Furnish and install wiring for new auh.
Date:  July 11, 2012
Value:   $51,198
Contractor: Stephen Nardone

Permit type: Electrical | Current use: Comm | Permit id: E151563
2012/07/1151198100835 Huntington Av Boston Ma 02115Stephen Nardone
SCORE
100
Vacancy-levinson building unit-1407-replace switches receptacles gfci receptacles fixtures
Date:  December 2, 2010
Value:   $800
Contractor: George Elder

Permit type: Electrical | Current use: 7more | Permit id: E53920
2010/12/02800100835 Huntington Av Boston Ma 02115George Elder
SCORE
92
Install a 20a 1p - 120v circuit to radio equipment cabinet in the levinson flynn duggan and neville bldgs. Install empty conduit for installation of antenna cable to mast location.
Date:  April 11, 2012
Value:   $14,000
Contractor: Brian Queenan

Permit type: Electrical | Permit status: Expired | Current use: 7more | Permit id: E128797
2012/04/111400092835 Huntington Av Boston Ma 02115Brian Queenan
SCORE
100
Neville building unit-#-313 replace switches receptacles gfci receptacles plates 4-lights
Date:  September 18, 2014
Value:   $1,500
Contractor: George Elder

Permit type: Electrical | Current use: Multi | Permit id: E407977
2014/09/181500100835 Huntington Av Boston Ma 02115George Elder
SCORE
67
Repairing replacing existing retaining wall next to driveway that leads from;underground garage. This is being done due to deterioration of existing wall. This will also include a fence guardrail on top of wall.
Date:  December 22, 2010
Value:   $87,325
Contractor: Timothy Reid

Permit type: Other | Permit status: Expired | Current use: 7more | Permit id: Sf56139
2010/12/228732567835 Huntington Av Boston Ma 02115Timothy Reid
SCORE
100
Install temporary electrical panel for outside community meeting on june 10-2012
Date:  May 21, 2012
Value:   $1,000
Contractor: George Elder

Permit type: Electrical | Current use: Other | Permit id: E141279
2012/05/211000100835 Huntington Av Boston Ma 02115George Elder
SCORE
100
835 huntington ave -duggan building unit-410- replaced switches receptacles light fixtures
Date:  August 11, 2014
Value:   $1,200
Contractor: George Elder

Permit type: Electrical | Current use: Multi | Permit id: E393077
2014/08/111200100835 Huntington Av Boston Ma 02115George Elder
SCORE
100
Neville building unit 408- vacancy replaced switches receptacles gfci receptacles 4- light fixtures
Date:  July 5, 2013
Value:   $1,200
Contractor: George Elder

Permit type: Electrical | Current use: Other | Permit id: E260774
2013/07/051200100835 Huntington Av Boston Ma 02115George Elder
SCORE
100
Installation of cctv system consisting of (10) devices
Date:  October 24, 2014
Value:   $3,541
Contractor: Mark Brophy

Permit type: Low voltage | Current use: Comm | Permit id: Elv417351
2014/10/243541100835 Huntington Av Boston Ma 02115Mark Brophy
SCORE
86
Remodel plumbing new drainage and water piping and fixtures
Date:  January 17, 2012
Value:   $22,000
Contractor: Jeff Bean

Permit type: Plumbing | Current use: Comm | Permit id: Pl114258
2012/01/172200086835 Huntington Av Boston Ma 02115Jeff Bean
SCORE
100
Duggan building unit-212 vacancy - replaced switches receptacles gfci receptacles plates lights
Date:  January 30, 2014
Value:   $1,200
Contractor: George Elder

Permit type: Electrical | Current use: Multi | Permit id: E323079
2014/01/301200100835 Huntington Av Boston Ma 02115George Elder
SCORE
100
835 huntington ave levinson building unit-#-1101- vacancy replaced switches receptacles gfci receptacles plates 4- light fixtures
Date:  February 13, 2015
Value:   $2,000
Contractor: George Elder

Permit type: Electrical | Permit status: Expired | Current use: Multi | Permit id: E446869
2015/02/132000100835 Huntington Av Boston Ma 02115George Elder
SCORE
100
Duggan building unit-409- replaced all devices and 4-lights
Date:  April 8, 2014
Value:   $1,500
Contractor: George Elder

Permit type: Electrical | Current use: Multi | Permit id: E350619
2014/04/081500100835 Huntington Av Boston Ma 02115George Elder
SCORE
100
Install temporary electrical panel for outside community meeting
Date:  June 7, 2011
Value:   $500
Contractor: George Elder

Permit type: Temporary service | Current use: 7more | Permit id: Ets80438
2011/06/07500100835 Huntington Av Boston Ma 02115George Elder
SCORE
100
835 huntington ave flynn building unit- 604 vacancy replaced switches receptacles gfci receptacles plates 4- fixtures
Date:  February 13, 2015
Value:   $1,500
Contractor: George Elder

Permit type: Electrical | Permit status: Expired | Current use: Multi | Permit id: E444719
2015/02/131500100835 Huntington Av Boston Ma 02115George Elder
SCORE
100
Neville building -unit-206 - replaced 4-receptacles in living rm replaced 3-receptacles in bedroom 1-switch in hallway
Date:  September 27, 2013
Value:   $800
Contractor: George Elder

Permit type: Electrical | Current use: Multi | Permit id: E290051
2013/09/27800100835 Huntington Av Boston Ma 02115George Elder
SCORE
100
Neville building unit #-406 relocate & replaced electrical panel in unit
Date:  July 15, 2014
Value:   $1,000
Contractor: George Elder

Permit type: Electrical | Current use: Multi | Permit id: E383604
2014/07/151000100835 Huntington Av Boston Ma 02115George Elder
SCORE
100
Yearly electrical maintence
Date:  July 5, 2013
Value:   $10,000
Contractor: George Elder

Permit type: Annual maintenance | Current use: Multi | Permit id: E260442
2013/07/0510000100835 Huntington Av Boston Ma 02115George Elder
SCORE
100
835 huntington ave flynn building -#-1803 vacancy replaced switches receptacles gfci receptacles plates
Date:  January 7, 2014
Value:   $2,000
Contractor: George Elder

Permit type: Electrical | Current use: Multi | Permit id: E316653
2014/01/072000100835 Huntington Av Boston Ma 02115George Elder
SCORE
100
Kitchen & bath renovations to accomodate ada space allowances. Includes new plumbing electrical carpentry cabinets flooring & painting
Date:  August 9, 2013
Value:   $61,000
Contractor: Denise Regan

Permit type: Interior/exterior work | Current use: Multi | Permit id: Sf272108
2013/08/0961000100835 Huntington Av Boston Ma 02115Denise Regan
SCORE
100
Neville building unit-515 - vacancy replaced switches receptacles gfci receptacles lights plates
Date:  October 4, 2013
Value:   $1,000
Contractor: George Elder

Permit type: Electrical | Current use: Multi | Permit id: E292398
2013/10/041000100835 Huntington Av Boston Ma 02115George Elder
SCORE
100
Levinson -2506 replace switches receptacles lights
Date:  January 8, 2010
Value:   $600
Contractor: George Elder

Permit type: Electrical | Current use: 7more | Permit id: E9982
2010/01/08600100835 Huntington Av Boston Ma 02115George Elder
SCORE
95
Nstar outage to perorm maintenance to the levison building 480 volt switchgear at mission park. Nstar w o 2003682
Date:  May 30, 2014
Value:   $3,000
Contractor: Joseph Cipolla

Permit type: Electrical | Permit status: Expired | Current use: Multi | Permit id: E368433
2014/05/30300095835 Huntington Av Boston Ma 02115Joseph Cipolla
SCORE
100
835 huntington ave levinson building unit-#-1203- vacancy replaced switches receptacles gfci receptacles plates 6- lights fixtures
Date:  December 10, 2013
Value:   $3,000
Contractor: George Elder

Permit type: Electrical | Current use: Multi | Permit id: E311634
2013/12/103000100835 Huntington Av Boston Ma 02115George Elder
SCORE
100
Levinson building -unit 2109 vacancy replace switches receptacles gfci receptacles fixtures
Date:  July 31, 2013
Value:   $1,000
Contractor: George Elder

Permit type: Electrical | Current use: Multi | Permit id: E269138
2013/07/311000100835 Huntington Av Boston Ma 02115George Elder
SCORE
100
Install temporary electrical panel for outside community meeting on june 9 2013
Date:  June 4, 2013
Value:   $1,000
Contractor: George Elder

Permit type: Electrical | Current use: Mixed | Permit id: E250173
2013/06/041000100835 Huntington Av Boston Ma 02115George Elder
SCORE
97
Renovation of afterschool program area
Date:  January 23, 2012
Value:   $35,000
Contractor: Kevin Callahan

Permit type: Electrical | Current use: Mixed | Permit id: E115666
2012/01/233500097835 Huntington Av Boston Ma 02115Kevin Callahan
SCORE
85
Repair existion exterior cmu foundation wall as per plan
Date:  October 26, 2011
Value:   $13,000
Contractor: William Foster

Permit type: Other | Current use: Multi | Permit id: Sf102797
2011/10/261300085835 Huntington Av Boston Ma 02115William Foster
SCORE
96
Rework & install new fire alarm devices in the flynn kitchen
Date:  April 11, 2012
Value:   $6,680
Contractor: Chris Nolin

Permit type: Fire alarm | Current use: Comm | Permit id: Efa130694
2012/04/11668096835 Huntington Av Boston Ma 02115Chris Nolin
SCORE
83
Elevator modifications to include 3 60amp 480v fusible disconnects a dedicated 20a circuit gfci & lights in machine room & pit
Date:  June 2, 2010
Value:   $26,000
Contractor: John Spadafora

Permit type: Electrical | Current use: Comm | Permit id: E28137
2010/06/022600083835 Huntington Av Boston Ma 02115John Spadafora
SCORE
100
Neville building -unit-201-vacancy replace switches receptacles gfci receptacles plates 4- light fixtures
Date:  November 5, 2013
Value:   $1,000
Contractor: George Elder

Permit type: Electrical | Current use: Multi | Permit id: E301579
2013/11/051000100835 Huntington Av Boston Ma 02115George Elder
SCORE
96
Demolition and like reconstruction of existing exterior decks
Date:  September 13, 2012
Value:   $57,100
Contractor: Stephen Callahan

Permit type: Renovations - exterior | Current use: Other | Permit id: Sf182575
2012/09/135710096835 Huntington Av Boston Ma 02115Stephen Callahan
SCORE
100
Install water pipe and backflow preventer .
Date:  October 5, 2010
Value:   $1,000
Contractor: Stephen Mcelhinney

Permit type: Plumbing | Current use: Multi | Permit id: Pl45701
2010/10/051000100835 Huntington Av Boston Ma 02115Stephen Mcelhinney
SCORE
100
Levinson building-apartment 1106- replaced switches receptacles lights
Date:  January 23, 2013
Value:   $900
Contractor: George Elder

Permit type: Electrical | Current use: Other | Permit id: E213538
2013/01/23900100835 Huntington Av Boston Ma 02115George Elder
SCORE
100
Levinson bld-#-2507- replace switches receptacles lights
Date:  January 8, 2010
Value:   $700
Contractor: George Elder

Permit type: Electrical | Current use: 7more | Permit id: E10230
2010/01/08700100835 Huntington Av Boston Ma 02115George Elder
SCORE
98
For unit 406 installing one combination smoke detector sounder and one visual only to the existing fire alarm loop.
Date:  August 4, 2014
Value:   $4,000
Contractor: Michael Harrington

Permit type: Fire alarm | Permit status: Expired | Current use: Multi | Permit id: Efa391508
2014/08/04400098835 Huntington Av Boston Ma 02115Michael Harrington
SCORE
100
Install new fire alarm commumicator
Date:  December 1, 2010
Value:   $25,000
Contractor: Karen Sykes

Permit type: Fire alarm | Current use: Comm | Permit id: Efa53652
2010/12/0125000100835 Huntington Av Boston Ma 02115Karen Sykes
SCORE
100
Neville building unit-705 - vacancy replaced switches receptacles gfci receptacles light fixtures
Date:  July 17, 2013
Value:   $1,000
Contractor: George Elder

Permit type: Electrical | Current use: Multi | Permit id: E264051
2013/07/171000100835 Huntington Av Boston Ma 02115George Elder
SCORE
96
Rewiring kitchen and bathroom. Making apt handicap accessable.
Date:  July 11, 2014
Value:   $3,000
Contractor: Jimmy Aguilar

Permit type: Electrical | Current use: Multi | Permit id: E383278
2014/07/11300096835 Huntington Av Boston Ma 02115Jimmy Aguilar
SCORE
100
Levinson building -unit-501 vacancy replaced switches receptacles gfci receptacles plates lights
Date:  January 23, 2014
Value:   $1,000
Contractor: George Elder

Permit type: Electrical | Current use: Multi | Permit id: E320653
2014/01/231000100835 Huntington Av Boston Ma 02115George Elder
SCORE
100
835 huntington ave duggan building unit-813- replaced switches receptacles gfci receptacles plates 3- light fixtures
Date:  April 22, 2014
Value:   $2,000
Contractor: George Elder

Permit type: Electrical | Current use: Multi | Permit id: E353078
2014/04/222000100835 Huntington Av Boston Ma 02115George Elder
SCORE
69
Interior repairs to walls and ceilings to unit#39 new whinty
Date:  April 22, 2010
Value:   $2,400
Contractor: Vadym Huzenko

Permit type: Renovations -interior nsc | Current use: 1unit | Permit id: Sf22691
2010/04/22240069835 Huntington Av Boston Ma 02115Vadym Huzenko
SCORE
100
835 huntington ave levinson building unit-#-1203- vacancy replaced switches receptacles gfci receptacles plates 6- lights fixtures
Date:  December 10, 2013
Value:   $3,000
Contractor: George Elder

Permit type: Electrical permit | Expiration date: June 10, 2014 | Current use: Multi | Permit id: E311634
2013/12/103000100835 Huntington Av Boston MaGeorge Elder
SCORE
100
Remodel three piece bath group kitchen laundry
Date:  January 12, 2015
Value:   $5,000
Contractor: Stephen Mcelhinney

Permit type: Plumbing permit | Expiration date: July 12, 2015 | Current use: 1-2fam | Permit id: Pl440878
2015/01/125000100835 Huntington Av Boston MaStephen Mcelhinney
SCORE
100
Duggan building unit-212 vacancy - replaced switches receptacles gfci receptacles plates lights
Date:  January 30, 2014
Value:   $1,200
Contractor: George Elder

Permit type: Electrical permit | Expiration date: July 30, 2014 | Current use: Multi | Permit id: E323079
2014/01/301200100835 Huntington Av Boston MaGeorge Elder
Replace (3) defective os&;y gate valves in fire pump room. Building shut down. Bfd paid detail required
Date:  September 25, 2012

Permit type: Bfd sprinkler system | Permit id: Sprk183516
2012/09/25095835 Huntington Av Boston Ma
SCORE
100
Flynn building-apartment 404- replaced switches receptacles gfci receptacles plates fixtures
Date:  April 8, 2013
Value:   $900
Contractor: George Elder

Permit type: Electrical permit | Expiration date: October 8, 2013 | Current use: Other | Permit id: E233577
2013/04/08900100835 Huntington Av Boston MaGeorge Elder
Replace corroded section of pipe on suction side of fire pump. Pump shut down required. Work to be done per nfpa stands. 7 cmr.; bfd paid detail required of 1 officer; 3 fire fighters with pump set up 30-minutes before start of the shut-down. Bfd paid detail required
Date:  October 9, 2013

Permit type: Bfd sprinkler system | Permit id: Sprk288247
2013/10/09095835 Huntington Av Boston Ma
SCORE
100
Levinson building unit-2607-vacancy replaced switches receptacles gfci receptacles replaced 5- fixtures
Date:  July 11, 2013
Value:   $1,200
Contractor: George Elder

Permit type: Electrical permit | Expiration date: January 11, 2014 | Current use: Multi | Permit id: E261879
2013/07/111200100835 Huntington Av Boston MaGeorge Elder
SCORE
100
835 huntington ave flynn building unit-312 replace switches receptacles lights
Date:  August 4, 2014
Value:   $1,000
Contractor: George Elder

Permit type: Electrical permit | Expiration date: February 4, 2015 | Current use: Multi | Permit id: E391260
2014/08/041000100835 Huntington Av Boston MaGeorge Elder
Stand lift truck &; chipper at curb / pedestrian staging on sidewalk
Date:  December 6, 2012

Permit type: Street occupancy permit | Expiration date: December 14, 2012 | Permit id: Occu-205726
2012/12/06095835 Huntington Av Boston Ma
SCORE
100
Neville building unit-515 - vacancy replaced switches receptacles gfci receptacles lights plates
Date:  October 4, 2013
Value:   $1,000
Contractor: George Elder

Permit type: Electrical permit | Expiration date: April 4, 2014 | Current use: Multi | Permit id: E292398
2013/10/041000100835 Huntington Av Boston MaGeorge Elder
SCORE
100
Vacancy-levinson building unit-1407-replace switches receptacles gfci receptacles fixtures
Date:  December 2, 2010
Value:   $800
Contractor: George Elder

Permit type: Electrical permit | Expiration date: June 2, 2011 | Current use: 7more | Permit id: E53920
2010/12/02800100835 Huntington Av Boston MaGeorge Elder
Replace corroded sections of piping and valve in fire pump room
Date:  September 4, 2014

Permit type: Bfd sprinkler system | Permit id: Sprk393928
2014/09/04095835 Huntington Av Boston Ma
SCORE
100
Flynn building unit 508- vacancy -replaced switches receptacles gfci receptacles plates light fixtures
Date:  September 9, 2013
Value:   $1,500
Contractor: George Elder

Permit type: Electrical permit | Expiration date: March 9, 2014 | Current use: Multi | Permit id: E282885
2013/09/091500100835 Huntington Av Boston MaGeorge Elder
SCORE
97
Small management office remodel
Date:  June 13, 2012
Value:   $15,000
Contractor: Kevin Callahan

Permit type: Electrical permit | Expiration date: December 13, 2012 | Current use: Comm | Permit id: E150848
2012/06/131500097835 Huntington Av Boston MaKevin Callahan
Replace existing pressure restricting valves with new pressure regulating valves on standpipe/ sprinkler system where pressure exceeds 175 psi floors 1-27 work to be done one floor and one riser at a time.; impaired riser to be clearly labled.; bfd detail with pumper required for building shut down.;fire;department connection to remain in service.
Date:  August 31, 2010

Permit type: Bfd sprinkler system | Permit id: Sprk36147
2010/08/31095835 Huntington Av Boston Ma
SCORE
100
835 huntington ave levinson building unit-#-1101- vacancy replaced switches receptacles gfci receptacles plates 4- light fixtures
Date:  February 13, 2015
Value:   $2,000
Contractor: George Elder

Permit type: Electrical permit | Expiration date: August 13, 2015 | Current use: Multi | Permit id: E446869
2015/02/132000100835 Huntington Av Boston MaGeorge Elder
SCORE
100
Levinson building unit-2506- vacancy replaced switches receptacles gfci receptacles 4- light fixtures plates
Date:  December 18, 2014
Value:   $1,500
Contractor: George Elder

Permit type: Electrical permit | Expiration date: June 18, 2015 | Current use: Multi | Permit id: E435313
2014/12/181500100835 Huntington Av Boston MaGeorge Elder
SCORE
100
Duggan building -unit 304 - replaced switches receptacles gfci receptacles plates . 4-light fixtures
Date:  January 6, 2015
Value:   $2,000
Contractor: George Elder

Permit type: Electrical permit | Expiration date: July 6, 2015 | Current use: Multi | Permit id: E439306
2015/01/062000100835 Huntington Av Boston MaGeorge Elder
SCORE
100
Levinson building -1206-vacancy-replace switches receptacles gfci receptacles light fixtures
Date:  December 2, 2010
Value:   $1,000
Contractor: George Elder

Permit type: Electrical permit | Expiration date: June 2, 2011 | Current use: 7more | Permit id: E53929
2010/12/021000100835 Huntington Av Boston MaGeorge Elder
SCORE
97
Data and cable installations in afterschool program area renovation
Date:  January 23, 2012
Value:   $2,500
Contractor: Kevin Callahan

Permit type: Electrical low voltage | Expiration date: July 23, 2012 | Current use: Mixed | Permit id: Elv115669
2012/01/23250097835 Huntington Av Boston MaKevin Callahan
SCORE
100
835 huntington ave flynn building -#-1803 vacancy replaced switches receptacles gfci receptacles plates
Date:  January 7, 2014
Value:   $2,000
Contractor: George Elder

Permit type: Electrical permit | Expiration date: July 7, 2014 | Current use: Multi | Permit id: E316653
2014/01/072000100835 Huntington Av Boston MaGeorge Elder
SCORE
100
Levinson building apt-1308- replaced switches lights receptacles
Date:  January 23, 2013
Value:   $800
Contractor: George Elder

Permit type: Electrical permit | Expiration date: July 23, 2013 | Current use: Other | Permit id: E213537
2013/01/23800100835 Huntington Av Boston MaGeorge Elder
Emergency panel replacement replace damaged fire control panel doc20110263
Date:  March 7, 2011

Permit type: Bfd fire alarm installations | Permit id: Bfdf66548
2011/03/07095835 Huntington Av Boston Ma
SCORE
100
Levinson building - unit-2706-vacancy replaced switches receptacles gfci receptacles replaced 4- fixtures
Date:  July 5, 2013
Value:   $1,000
Contractor: George Elder

Permit type: Electrical permit | Expiration date: January 5, 2014 | Current use: Other | Permit id: E260401
2013/07/051000100835 Huntington Av Boston MaGeorge Elder
SCORE
69
Flooring paining repairs
Date:  July 29, 2010
Value:   $6,500
Contractor: Vadym Huzenko

Permit type: Short form bldg permit | Expiration date: January 29, 2011 | Current use: 1-2fam | Permit id: Sf36007
2010/07/29650069835 Huntington Av Boston MaVadym Huzenko
SCORE
100
835 huntington ave levinson building unit-2009- replaced switches receptacles plates 4-light fixtures
Date:  November 19, 2014
Value:   $2,000
Contractor: George Elder

Permit type: Electrical permit | Expiration date: May 19, 2015 | Current use: Multi | Permit id: E427026
2014/11/192000100835 Huntington Av Boston MaGeorge Elder
SCORE
96
Demolition and like reconstruction of existing exterior decks
Date:  September 13, 2012
Value:   $57,100
Contractor: Stephen Callahan

Permit type: Short form bldg permit | Expiration date: March 13, 2013 | Current use: Other | Permit id: Sf182575
2012/09/135710096835 Huntington Av Boston MaStephen Callahan
SCORE
100
Flynn building unit 406- replace switches receptacles gfci receptacles . Phone & cable jacks light fixtures
Date:  September 2, 2014
Value:   $1,000
Contractor: George Elder

Permit type: Electrical permit | Expiration date: March 2, 2015 | Current use: Multi | Permit id: E403270
2014/09/021000100835 Huntington Av Boston MaGeorge Elder
SCORE
100
Duggan building unit 1301- vacancy replaced switches receptacles gfci receptales light fixtures
Date:  September 10, 2013
Value:   $1,000
Contractor: George Elder

Permit type: Electrical permit | Expiration date: March 10, 2014 | Current use: Multi | Permit id: E284123
2013/09/101000100835 Huntington Av Boston MaGeorge Elder
SCORE
71
Replacement of damaged parts in fire alarm control panel as a result of a sprinkler head break.
Date:  April 11, 2011
Value:   $50,000
Contractor: Pauric Baxter

Permit type: Electrical fire alarms | Expiration date: October 11, 2011 | Current use: Other | Permit id: Efa71750
2011/04/115000071835 Huntington Av Boston MaPauric Baxter
SCORE
100
Flynn building 805- vacancy replace switches receptacles gfic receptacles plates 6- fixtures
Date:  September 27, 2013
Value:   $1,500
Contractor: George Elder

Permit type: Electrical permit | Expiration date: March 27, 2014 | Current use: Multi | Permit id: E289042
2013/09/271500100835 Huntington Av Boston MaGeorge Elder
SCORE
100
Kitchen & bath renovations to accomodate ada space allowances. Includes new plumbing electrical carpentry cabinets flooring & painting
Date:  August 9, 2013
Value:   $61,000
Contractor: Denise Regan

Permit type: Short form bldg permit | Expiration date: February 9, 2014 | Current use: Multi | Permit id: Sf272108
2013/08/0961000100835 Huntington Av Boston MaDenise Regan
SCORE
96
Rework & install new fire alarm devices in the flynn kitchen
Date:  April 11, 2012
Value:   $6,680
Contractor: Chris Nolin

Permit type: Electrical fire alarms | Expiration date: October 11, 2012 | Current use: Comm | Permit id: Efa130694
2012/04/11668096835 Huntington Av Boston MaChris Nolin
SCORE
100
Levinson -2604- replace switches receptacles lights cell #:; 617 5 3056
Date:  July 8, 2010
Value:   $700
Contractor: George Elder

Permit type: Electrical permit | Expiration date: January 8, 2011 | Current use: 7more | Permit id: E32719
2010/07/08700100835 Huntington Av Boston MaGeorge Elder
SCORE
97
To fit-up units per drawings
Date:  August 14, 2013
Value:   $6,500
Contractor: David Leblanc

Permit type: Electrical permit | Expiration date: February 14, 2014 | Current use: Multi | Permit id: E274120
2013/08/14650097835 Huntington Av Boston MaDavid Leblanc
SCORE
100
Levinson building -unit-501 vacancy replaced switches receptacles gfci receptacles plates lights
Date:  January 23, 2014
Value:   $1,000
Contractor: George Elder

Permit type: Electrical permit | Expiration date: July 23, 2014 | Current use: Multi | Permit id: E320653
2014/01/231000100835 Huntington Av Boston MaGeorge Elder
SCORE
100
Neville building unit-#-517- vacancy replaced switches receptacles gfci receptacles plates bedroom living room bathroom
Date:  March 10, 2014
Value:   $1,000
Contractor: George Elder

Permit type: Electrical permit | Expiration date: September 10, 2014 | Current use: Multi | Permit id: E342108
2014/03/101000100835 Huntington Av Boston MaGeorge Elder
SCORE
100
Duggan building apartment 809- replaced switches receptacles fixtures plates
Date:  April 8, 2013
Value:   $850
Contractor: George Elder

Permit type: Electrical permit | Expiration date: October 8, 2013 | Current use: Other | Permit id: E233571
2013/04/08850100835 Huntington Av Boston MaGeorge Elder
Install new fire alarm devices.; tenant 1st floor after school program~; doc# 20120363 work to be done per nfpa stands.
Date:  April 25, 2012

Permit type: Bfd fire alarm installations | Permit id: Bfdf128829
2012/04/25095835 Huntington Av Boston Ma
SCORE
100
Installation of cctv system consisting of (10) devices
Date:  October 24, 2014
Value:   $3,541
Contractor: Mark Brophy

Permit type: Electrical low voltage | Expiration date: April 24, 2015 | Current use: Comm | Permit id: Elv417351
2014/10/243541100835 Huntington Av Boston MaMark Brophy
SCORE
97
Rework existing fire alarm system to accomodate new kitchen layout
Date:  January 23, 2012
Value:   $4,000
Contractor: Kevin Callahan

Permit type: Electrical fire alarms | Expiration date: July 23, 2012 | Current use: Mixed | Permit id: Efa115674
2012/01/23400097835 Huntington Av Boston MaKevin Callahan
SCORE
100
Levinson building -vacancy unit 906- replaced switches receptacles gfci receptacle replaced 4- fixtures
Date:  July 5, 2013
Value:   $1,500
Contractor: George Elder

Permit type: Electrical permit | Expiration date: January 5, 2014 | Current use: Other | Permit id: E260428
2013/07/051500100835 Huntington Av Boston MaGeorge Elder
SCORE
100
835 huntington ave- levinson building water damages install 8 temporary heater temporary lights disconnect water damaged devices as needed & lights
Date:  February 17, 2015
Value:   $100,000
Contractor: George Elder

Permit type: Electrical permit | Expiration date: August 17, 2015 | Current use: Multi | Permit id: E447693
2015/02/17100000100835 Huntington Av Boston MaGeorge Elder
SCORE
100
Levinson -2506 replace switches receptacles lights
Date:  January 8, 2010
Value:   $600
Contractor: George Elder

Permit type: Electrical permit | Expiration date: July 8, 2010 | Current use: 7more | Permit id: E9982
2010/01/08600100835 Huntington Av Boston MaGeorge Elder
SCORE
100
Levinson building -unit 2109 vacancy replace switches receptacles gfci receptacles fixtures
Date:  July 31, 2013
Value:   $1,000
Contractor: George Elder

Permit type: Electrical permit | Expiration date: January 31, 2014 | Current use: Multi | Permit id: E269138
2013/07/311000100835 Huntington Av Boston MaGeorge Elder
SCORE
100
Neville building -unit-907-replaced switches receptacles . Gfci receptacles light fixtures
Date:  September 15, 2014
Value:   $1,200
Contractor: George Elder

Permit type: Electrical permit | Expiration date: March 15, 2015 | Current use: Multi | Permit id: E406602
2014/09/151200100835 Huntington Av Boston MaGeorge Elder
SCORE
100
Duggan building unit-409- replaced all devices and 4-lights
Date:  April 8, 2014
Value:   $1,500
Contractor: George Elder

Permit type: Electrical permit | Expiration date: October 8, 2014 | Current use: Multi | Permit id: E350619
2014/04/081500100835 Huntington Av Boston MaGeorge Elder
SCORE
100
Install digital alarm communications panel for 18 residential multi-family buildings and 1 community center per plans.
Date:  June 10, 2011
Value:   $36,700
Contractor: John Gorman

Permit type: Long form/alteration permit | Expiration date: December 10, 2011 | Current use: Multi | Permit id: Alt54394
2011/06/1036700100835 Huntington Av Boston MaJohn Gorman
SCORE
100
835 huntington ave flynn building unit- 604 vacancy replaced switches receptacles gfci receptacles plates 4- fixtures
Date:  February 13, 2015
Value:   $1,500
Contractor: George Elder

Permit type: Electrical permit | Expiration date: August 13, 2015 | Current use: Multi | Permit id: E444719
2015/02/131500100835 Huntington Av Boston MaGeorge Elder
SCORE
100
835 huntington ave duggan building unit-813- replaced switches receptacles gfci receptacles plates 3- light fixtures
Date:  April 22, 2014
Value:   $2,000
Contractor: George Elder

Permit type: Electrical permit | Expiration date: October 22, 2014 | Current use: Multi | Permit id: E353078
2014/04/222000100835 Huntington Av Boston MaGeorge Elder
SCORE
86
Installation of a 24x44 construction trailer to be utilized as a sales and marketing trailer for the rth the riverway project located at fenwood road which is currently under construction. ( may 7 15 to; may 7 16 )
Date:  May 7, 2015
Value:   $50,000
Contractor: Jay Rodriguez

Permit type: Short form bldg permit | Expiration date: November 7, 2015 | Current use: Comm | Permit id: Sf469414
2015/05/075000086835 Huntington Av Boston MaJay Rodriguez
SCORE
95
Unit #506 demo rough finish kitchen reno and bathroom reno -panel is moving 5ft but no disconnect of circuits needed
Date:  May 7, 2015
Value:   $8,000
Contractor: Amanda Williams

Permit type: Electrical permit | Expiration date: November 7, 2015 | Current use: Comm | Permit id: E469400
2015/05/07800095835 Huntington Av Boston MaAmanda Williams
SCORE
100
Installation of security system
Date:  May 26, 2015
Value:   $3,840
Contractor: Mark Brophy

Permit type: Electrical low voltage | Expiration date: November 26, 2015 | Current use: Comm | Permit id: Elv472875
2015/05/263840100835 Huntington Av Boston MaMark Brophy
SCORE
95
Unit 906 demo rough finish kitchen reno and bathroom reno panel is moving 5 ft but no disconnect of circuits needed
Date:  November 30, 2015
Value:   $16,720
Contractor: Amanda Williams

Permit type: Electrical permit | Expiration date: May 30, 2016 | Current use: 1-2fam | Permit id: E542973
2015/11/301672095835 Huntington Av Boston MaAmanda Williams
SCORE
100
Install a new generator and eliminate 2 existing generators
Date:  August 25, 2015
Value:   $440,000
Contractor: Matthew Glynn

Permit type: Electrical permit | Expiration date: February 25, 2016 | Current use: Comm | Permit id: E511283
2015/08/25440000100835 Huntington Av Boston MaMatthew Glynn
SCORE
95
Installatios of fire alarm devices per drawings in unit 906
Date:  January 29, 2016
Value:   $16,720
Contractor: Amanda Williams

Permit type: Electrical fire alarms | Expiration date: July 29, 2016 | Current use: 1-2fam | Permit id: Efa542999
2016/01/291672095835 Huntington Av Boston MaAmanda Williams
SCORE
95
Fire alarm for material lift. Add 1 smoke detector and relay for damper.
Date:  January 29, 2016
Value:   $1,500
Contractor: Amanda Williams

Permit type: Electrical fire alarms | Expiration date: July 29, 2016 | Current use: 1-2fam | Permit id: Efa558392
2016/01/29150095835 Huntington Av Boston MaAmanda Williams
SCORE
100
Flynn building unit 1799 vacancy replaced switches receptacles gfci receptacles plates 4-light fixtures
Date:  January 13, 2015
Value:   $1,500
Contractor: George Elder

Permit type: Electrical permit | Expiration date: July 13, 2015 | Current use: Multi | Permit id: E441019
2015/01/131500100835 Huntington Av Boston MaGeorge Elder
Install new fire alarm as per plans for management office doc20120460
Date:  June 28, 2012

Permit type: Bfd fire alarm installations | Permit id: Bfdf139658
2012/06/28095835 Huntington Av Boston Ma
SCORE
100
Replace kitchen ada bath
Date:  July 24, 2014
Value:   $7,500
Contractor: Adenis Camara

Permit type: Plumbing permit | Expiration date: January 24, 2015 | Current use: Multi | Permit id: Pl387707
2014/07/247500100835 Huntington Av Boston MaAdenis Camara
Installation of fire alarm devices per drawings in unit - 506; ~; doc# 20150345
Date:  July 9, 2015

Permit type: Bfd fire alarm installations | Permit id: Bfdf482697
2015/07/09095835 Huntington Av Boston Ma
SCORE
100
Neville building -unit-201-vacancy replace switches receptacles gfci receptacles plates 4- light fixtures
Date:  November 5, 2013
Value:   $1,000
Contractor: George Elder

Permit type: Electrical permit | Expiration date: May 5, 2014 | Current use: Multi | Permit id: E301579
2013/11/051000100835 Huntington Av Boston MaGeorge Elder
SCORE
100
Levinson building unit 303 -vacancy replaced switches receptacles gfci receptacles plates 4- lights
Date:  November 5, 2013
Value:   $1,000
Contractor: George Elder

Permit type: Electrical permit | Expiration date: May 5, 2014 | Current use: Multi | Permit id: E301576
2013/11/051000100835 Huntington Av Boston MaGeorge Elder
SCORE
100
Neville building unit-#-313 replace switches receptacles gfci receptacles plates 4-lights
Date:  September 18, 2014
Value:   $1,500
Contractor: George Elder

Permit type: Electrical permit | Expiration date: March 18, 2015 | Current use: Multi | Permit id: E407977
2014/09/181500100835 Huntington Av Boston MaGeorge Elder
SCORE
95
Unit 705 renovation including -install switches fixtures and receptacles per drawing -new cabling where needed -junction boxes to extend existing wiring where needed -utilizing existing main phone data and electrical feeds
Date:  December 4, 2014
Value:   $7,000
Contractor: Amanda Williams

Permit type: Electrical permit | Expiration date: June 4, 2015 | Current use: 1-2fam | Permit id: E430505
2014/12/04700095835 Huntington Av Boston MaAmanda Williams
SCORE
100
Electrical demo of old boilers. Power wiring includes (10) boiler and pumps. Install new motor control center. Furnish and install new feeders. Furnish and install wiring for new auh.
Date:  July 11, 2012
Value:   $51,198
Contractor: Stephen Nardone

Permit type: Electrical permit | Expiration date: January 11, 2013 | Current use: Comm | Permit id: E151563
2012/07/1151198100835 Huntington Av Boston MaStephen Nardone
SCORE
97
Flynn kitchen renovation. New appliances and lighting
Date:  January 23, 2012
Value:   $15,000
Contractor: Kevin Callahan

Permit type: Electrical permit | Expiration date: July 23, 2012 | Current use: Mixed | Permit id: E115672
2012/01/231500097835 Huntington Av Boston MaKevin Callahan
SCORE
100
Renovating kitchen and bathroom.
Date:  August 14, 2013
Value:   $8,000
Contractor: Douglas Wambolt

Permit type: Plumbing permit | Expiration date: February 14, 2014 | Current use: Comm | Permit id: Pl272349
2013/08/148000100835 Huntington Av Boston MaDouglas Wambolt
Only one floor shall be impaired at any given time installation inaccordance with nfpa 13 and 7 cmr.
Date:  June 26, 2014

Permit type: Bfd sprinkler system | Permit id: Sprk371962
2014/06/26095835 Huntington Av Boston Ma
SCORE
100
25 st albans st -replace switches receptacles lights cell #:; 617 5 3056
Date:  July 8, 2010
Value:   $700
Contractor: George Elder

Permit type: Electrical permit | Expiration date: January 8, 2011 | Current use: 7more | Permit id: E32742
2010/07/08700100835 Huntington Av Boston MaGeorge Elder
SCORE
100
835 huntington ave -duggan building unit-410- replaced switches receptacles light fixtures
Date:  August 11, 2014
Value:   $1,200
Contractor: George Elder

Permit type: Electrical permit | Expiration date: February 11, 2015 | Current use: Multi | Permit id: E393077
2014/08/111200100835 Huntington Av Boston MaGeorge Elder
SCORE
99
Interior non-structural modifications to existing unit. Work to include new kitchen cabinets & countertop bathroom upgrade removing tub and install shower base. Erect walls and finish tiles. (unit 206)
Date:  June 5, 2014
Value:   $65,350
Contractor: Michael Leung

Permit type: Short form bldg permit | Expiration date: December 5, 2014 | Current use: Multi | Permit id: Sf370420
2014/06/056535099835 Huntington Av Boston MaMichael Leung
Remove &; install new boilers bfd paid detail required
Date:  May 31, 2012

Permit type: Bfd cutting-burning-welding | Permit id: Cbw145858
2012/05/31095835 Huntington Av Boston Ma
SCORE
100
Neville building unit 408- vacancy replaced switches receptacles gfci receptacles 4- light fixtures
Date:  July 5, 2013
Value:   $1,200
Contractor: George Elder

Permit type: Electrical permit | Expiration date: January 5, 2014 | Current use: Other | Permit id: E260774
2013/07/051200100835 Huntington Av Boston MaGeorge Elder
SCORE
100
Renovation of front and elevator lobby areas. Installation of lighting in lobbies
Date:  January 14, 2011
Value:   $10,000
Contractor: Richard Piazza

Permit type: Electrical permit | Expiration date: July 14, 2011 | Current use: 7more | Permit id: E58819
2011/01/1410000100835 Huntington Av Boston MaRichard Piazza
SCORE
100
Levinson building-apartment 1106- replaced switches receptacles lights
Date:  January 23, 2013
Value:   $900
Contractor: George Elder

Permit type: Electrical permit | Expiration date: July 23, 2013 | Current use: Other | Permit id: E213538
2013/01/23900100835 Huntington Av Boston MaGeorge Elder
SCORE
100
Flynn building -unit-799 -replaced switches receptacles gfci receptacles plates
Date:  September 18, 2014
Value:   $1,500
Contractor: George Elder

Permit type: Electrical permit | Expiration date: March 18, 2015 | Current use: Multi | Permit id: E408722
2014/09/181500100835 Huntington Av Boston MaGeorge Elder
SCORE
100
Levinson building -unit-807- replace switches receptacles gfci receptacles light fixtures (vacancy)
Date:  June 6, 2013
Value:   $800
Contractor: George Elder

Permit type: Electrical permit | Expiration date: December 6, 2013 | Current use: Multi | Permit id: E250631
2013/06/06800100835 Huntington Av Boston MaGeorge Elder
SCORE
97
Fire alarm modifications for afterschool program
Date:  January 23, 2012
Value:   $6,000
Contractor: Kevin Callahan

Permit type: Electrical fire alarms | Expiration date: July 23, 2012 | Current use: Mixed | Permit id: Efa115668
2012/01/23600097835 Huntington Av Boston MaKevin Callahan
SCORE
100
Yearly electrical maintence
Date:  July 5, 2013
Value:   $10,000
Contractor: George Elder

Permit type: Electrical permit | Expiration date: January 5, 2014 | Current use: Multi | Permit id: E260442
2013/07/0510000100835 Huntington Av Boston MaGeorge Elder
SCORE
100
835 huntington ave neville building -unit-1103- vacancy replaced switches receptacles gfci receptacles plates 4-lights
Date:  January 7, 2014
Value:   $2,000
Contractor: George Elder

Permit type: Electrical permit | Expiration date: July 7, 2014 | Current use: Multi | Permit id: E316654
2014/01/072000100835 Huntington Av Boston MaGeorge Elder
SCORE
100
Neville building unit-705 - vacancy replaced switches receptacles gfci receptacles light fixtures
Date:  July 17, 2013
Value:   $1,000
Contractor: George Elder

Permit type: Electrical permit | Expiration date: January 17, 2014 | Current use: Multi | Permit id: E264051
2013/07/171000100835 Huntington Av Boston MaGeorge Elder
SCORE
100
Levionson building unit-#-1204-replaced switches receptacles in 2- bedrooms living room hall way light
Date:  February 18, 2014
Value:   $1,000
Contractor: George Elder

Permit type: Electrical permit | Expiration date: August 18, 2014 | Current use: Multi | Permit id: E326920
2014/02/181000100835 Huntington Av Boston MaGeorge Elder
SCORE
79
Erect staging and remove and reinstall windows replace brick at facade (at floors 9 thru 14) repair wall studs and insulation and provide new wall waterproofing.
Date:  September 2, 2011
Value:   $89,000
Contractor: Jeffrey Soderquist

Permit type: Short form bldg permit | Expiration date: March 2, 2012 | Current use: Multi | Permit id: Sf93981
2011/09/028900079835 Huntington Av Boston MaJeffrey Soderquist
SCORE
100
Neville building unit 202- replaced switches receptacles lights
Date:  August 4, 2014
Value:   $1,000
Contractor: George Elder

Permit type: Electrical permit | Expiration date: February 4, 2015 | Current use: Multi | Permit id: E391259
2014/08/041000100835 Huntington Av Boston MaGeorge Elder
SCORE
86
Low voltage wiring - 1st. Floor.
Date:  March 8, 2012
Value:   $1,800
Contractor: R Monroe

Permit type: Electrical low voltage | Expiration date: September 8, 2012 | Current use: Comm | Permit id: Elv123731
2012/03/08180086835 Huntington Av Boston MaR Monroe
SCORE
100
Flynn building -unit-801- remodel bathroom & kitchen relocate electrical panel replaced switches receptacles gfci receptacles
Date:  January 6, 2015
Value:   $4,000
Contractor: George Elder

Permit type: Electrical permit | Expiration date: July 6, 2015 | Current use: Multi | Permit id: E439307
2015/01/064000100835 Huntington Av Boston MaGeorge Elder
SCORE
100
Flynn building unit-307 vacancy replaced switches receptacles gfci receptacles 4-fixtures plates
Date:  September 18, 2013
Value:   $1,000
Contractor: George Elder

Permit type: Electrical permit | Expiration date: March 18, 2014 | Current use: Multi | Permit id: E286745
2013/09/181000100835 Huntington Av Boston MaGeorge Elder
SCORE
100
Vacancy -flynn building unit 505 - replace switches receptacles lights
Date:  October 21, 2010
Value:   $1,000
Contractor: George Elder

Permit type: Electrical permit | Expiration date: April 21, 2011 | Current use: 7more | Permit id: E47365
2010/10/211000100835 Huntington Av Boston MaGeorge Elder
SCORE
100
Flynn building unit-2406- replaced switches receptacles gfci receptacles 4- fixtures
Date:  September 15, 2014
Value:   $1,200
Contractor: George Elder

Permit type: Electrical permit | Expiration date: March 15, 2015 | Current use: Multi | Permit id: E406601
2014/09/151200100835 Huntington Av Boston MaGeorge Elder
SCORE
100
Flynn building 608- vacancy replaced switches receptacles gfci receptacles plates 4-light fixtures
Date:  March 31, 2015
Value:   $1,300
Contractor: George Elder

Permit type: Electrical permit | Expiration date: September 30, 2015 | Current use: Multi | Permit id: E457937
2015/03/311300100835 Huntington Av Boston MaGeorge Elder
SCORE
100
Duggan building 607- vacancy- replaced switches receptacles gfci receptacles 4- light fixtures
Date:  March 31, 2015
Value:   $2,000
Contractor: George Elder

Permit type: Electrical permit | Expiration date: September 30, 2015 | Current use: Multi | Permit id: E457935
2015/03/312000100835 Huntington Av Boston MaGeorge Elder
SCORE
100
Duggan building 602- vacancy- replaced switches receptacles gfci receptacles 4- light fixtures plates
Date:  March 31, 2015
Value:   $1,300
Contractor: George Elder

Permit type: Electrical permit | Expiration date: September 30, 2015 | Current use: Multi | Permit id: E457936
2015/03/311300100835 Huntington Av Boston MaGeorge Elder
Welding/burning for removal of existing sidewalk lift dpl 8/19/15 bfd paid detail required
Date:  June 10, 2015

Permit type: Bfd cutting-burning-welding | Permit id: Cbw479147
2015/06/10095835 Huntington Av Boston Ma
SCORE
100
Neville-unit-212 -replace switches receptacles light fixtures cell #:; 617 5 3056
Date:  July 8, 2010
Value:   $600
Contractor: George Elder

Permit type: Electrical permit | Expiration date: January 8, 2011 | Current use: 7more | Permit id: E32710
2010/07/08600100835 Huntington Av Boston MaGeorge Elder
SCORE
97
Renovation of afterschool program area
Date:  January 23, 2012
Value:   $35,000
Contractor: Kevin Callahan

Permit type: Electrical permit | Expiration date: July 23, 2012 | Current use: Mixed | Permit id: E115666
2012/01/233500097835 Huntington Av Boston MaKevin Callahan
SCORE
86
Replace tiolet and lav and install kithchen sink with new rough and finish plumbing
Date:  March 8, 2012
Value:   $6,000
Contractor: Jeff Bean

Permit type: Plumbing permit | Expiration date: September 8, 2012 | Current use: Comm | Permit id: Pl122825
2012/03/08600086835 Huntington Av Boston MaJeff Bean
SCORE
100
Installation of security system
Date:  March 31, 2015
Value:   $31,962
Contractor: Mark Brophy

Permit type: Electrical low voltage | Expiration date: September 30, 2015 | Current use: Comm | Permit id: Elv457420
2015/03/3131962100835 Huntington Av Boston MaMark Brophy
To remove asbesos
Date:  March 7, 2012

Permit type: Bfd asbestos removal | Permit id: Asb123478
2012/03/07095835 Huntington Av Boston Ma
SCORE
98
Change off occupancy from day care to after school program. Renovating current space into a after school program space. Fire alarm and sprinkler .;full interior renovation
Date:  January 17, 2012
Value:   $253,210
Contractor: Adam Goodrich

Permit type: Long form/alteration permit | Expiration date: July 17, 2012 | Current use: Mixed | Permit id: Alt105798
2012/01/1725321098835 Huntington Av Boston MaAdam Goodrich
SCORE
59
Removal of cctv cameras and reinstall after renovations are complete. Using existing wireing.
Date:  February 21, 2012
Value:   $700
Contractor: Joshua Carmody

Permit type: Electrical low voltage | Expiration date: August 21, 2012 | Current use: Comm | Permit id: Elv120422
2012/02/2170059835 Huntington Av Boston MaJoshua Carmody
Bfd chemist certificate proces
Date:  July 17, 2012

Permit id: Chm161092
2012/07/17095835 Huntington Av Boston Ma
Welding for replacemnt of heating valves (dpl) bfd paid detail required
Date:  September 8, 2011

Permit type: Bfd cutting-burning-welding | Permit id: Cbw93962
2011/09/08095835 Huntington Av Boston Ma
SCORE
100
Neville building unit #-406 relocate & replaced electrical panel in unit
Date:  July 15, 2014
Value:   $1,000
Contractor: George Elder

Permit type: Electrical permit | Expiration date: January 15, 2015 | Current use: Multi | Permit id: E383604
2014/07/151000100835 Huntington Av Boston MaGeorge Elder
SCORE
82
Renovation to the apartment building.
Date:  December 2, 2014
Value:   $7,500
Contractor: Erika Johnson

Permit type: Electrical permit | Expiration date: June 2, 2015 | Current use: Comm | Permit id: E430869
2014/12/02750082835 Huntington Av Boston MaErika Johnson
SCORE
100
4 mission park dr- install pipe and wiring for outside gfci receptacle for air quality unit on building ; cell #:; 617 5 3056
Date:  July 8, 2010
Value:   $500
Contractor: George Elder

Permit type: Electrical permit | Expiration date: January 8, 2011 | Current use: 7more | Permit id: E32744
2010/07/08500100835 Huntington Av Boston MaGeorge Elder
SCORE
96
Installation of new shell and tube heat exchangers for existing storage tank
Date:  April 24, 2012
Value:   $100,000
Contractor: Joseph Milner

Permit type: Plumbing permit | Expiration date: October 24, 2012 | Current use: 7more | Permit id: Pl133545
2012/04/2410000096835 Huntington Av Boston MaJoseph Milner
SCORE
100
Install temporary electrical panel for outside community meeting
Date:  June 7, 2011
Value:   $500
Contractor: George Elder

Permit type: Electrical temporary service | Expiration date: December 7, 2011 | Current use: 7more | Permit id: Ets80438
2011/06/07500100835 Huntington Av Boston MaGeorge Elder
SCORE
100
Install temporary heaters in rth community center building
Date:  January 8, 2010
Value:   $1,000
Contractor: George Elder

Permit type: Electrical permit | Expiration date: July 8, 2010 | Current use: 7more | Permit id: E9976
2010/01/081000100835 Huntington Av Boston MaGeorge Elder
SCORE
100
Replace one backflow preventer for pool water supply.
Date:  July 7, 2010
Value:   $500
Contractor: Stephen Mcelhinney

Permit type: Plumbing permit | Expiration date: January 7, 2011 | Current use: Multi | Permit id: Pl32691
2010/07/07500100835 Huntington Av Boston MaStephen Mcelhinney
SCORE
100
Levinson bld-#-2507- replace switches receptacles lights
Date:  January 8, 2010
Value:   $700
Contractor: George Elder

Permit type: Electrical permit | Expiration date: July 8, 2010 | Current use: 7more | Permit id: E10230
2010/01/08700100835 Huntington Av Boston MaGeorge Elder
SCORE
86
Remodel plumbing new drainage and water piping and fixtures
Date:  January 17, 2012
Value:   $22,000
Contractor: Jeff Bean

Permit type: Plumbing permit | Expiration date: July 17, 2012 | Current use: Comm | Permit id: Pl114258
2012/01/172200086835 Huntington Av Boston MaJeff Bean
Welding for installation of new replacement heating valves (dpl) bfd paid detail required
Date:  September 30, 2011

Permit type: Bfd cutting-burning-welding | Permit id: Cbw97788
2011/09/30095835 Huntington Av Boston Ma
SCORE
82
Install rooftop fall protection anchorage on levinson neville house duggan and flynn buildings at mission park.
Date:  June 17, 2011
Value:   $300,000
Contractor: Brett Emery

Permit type: Short form bldg permit | Expiration date: December 17, 2011 | Current use: 7more | Permit id: Sf82276
2011/06/1730000082835 Huntington Av Boston MaBrett Emery
Welding for emergency repairs to domestic hot water system including leaks and distribution problems bfd paid detail required
Date:  December 3, 2012

Permit type: Bfd cutting-burning-welding | Permit id: Cbw204753
2012/12/03095835 Huntington Av Boston Ma
SCORE
100
Install temporary electrical panel for outside community meeting on june 10-2012
Date:  May 21, 2012
Value:   $1,000
Contractor: George Elder

Permit type: Electrical permit | Expiration date: November 21, 2012 | Current use: Other | Permit id: E141279
2012/05/211000100835 Huntington Av Boston MaGeorge Elder
SCORE
100
Neville building -unit-206 - replaced 4-receptacles in living rm replaced 3-receptacles in bedroom 1-switch in hallway
Date:  September 27, 2013
Value:   $800
Contractor: George Elder

Permit type: Electrical permit | Expiration date: March 27, 2014 | Current use: Multi | Permit id: E290051
2013/09/27800100835 Huntington Av Boston MaGeorge Elder
Cutting &; welding to the underside of the metal trash containers (dpl);
Date:  May 15, 2013

Permit type: Bfd cutting-burning-welding | Permit id: Cbw240879
2013/05/15095835 Huntington Av Boston Ma
SCORE
100
Lev-2403--replace switches receptacles lights
Date:  January 8, 2010
Value:   $700
Contractor: George Elder

Permit type: Electrical permit | Expiration date: July 8, 2010 | Current use: 7more | Permit id: E10096
2010/01/08700100835 Huntington Av Boston MaGeorge Elder
SCORE
100
Install 7- pole lights and trench from fixture to fixture behind flynn building in walk way
Date:  September 8, 2010
Value:   $20,000
Contractor: George Elder

Permit type: Electrical permit | Expiration date: March 8, 2011 | Current use: 1-2fam | Permit id: E41673
2010/09/0820000100835 Huntington Av Boston MaGeorge Elder
SCORE
85
Repair existion exterior cmu foundation wall as per plan
Date:  October 26, 2011
Value:   $13,000
Contractor: William Foster

Permit type: Short form bldg permit | Expiration date: April 26, 2012 | Current use: Multi | Permit id: Sf102797
2011/10/261300085835 Huntington Av Boston MaWilliam Foster
SCORE
98
Demolition and renovation of an existing management office space.
Date:  May 24, 2012
Value:   $107,000
Contractor: Adam Goodrich

Permit type: Long form/alteration permit | Expiration date: November 24, 2012 | Current use: Comm | Permit id: Alt124174
2012/05/2410700098835 Huntington Av Boston MaAdam Goodrich
SCORE
96
Replace 14 light fixtures and reconnect elec. Doors at building lobby address of work: 835 huntington ave boston 02115 (levinson building)
Date:  April 20, 2012
Value:   $1,000
Contractor: J Lotto

Permit type: Electrical permit | Expiration date: October 20, 2012 | Current use: Other | Permit id: E133427
2012/04/20100096835 Huntington Av Boston MaJ Lotto
Welding to facilate emergency repairs on 10" heating lines (dpl) bfd paid detail required
Date:  September 12, 2013

Permit type: Bfd cutting-burning-welding | Permit id: Cbw284342
2013/09/12095835 Huntington Av Boston Ma
To bag smoke detectors due to drilling
Date:  August 30, 2011

Permit type: Bfd bag smoke detectors | Permit id: Bsd92548
2011/08/30095835 Huntington Av Boston Ma
Welding for replacement of new heating valves (dpl) bfd paid detail required
Date:  September 30, 2011

Permit type: Bfd cutting-burning-welding | Permit id: Cbw97842
2011/09/30095835 Huntington Av Boston Ma
Install dialer for town-house fire alarm systems doc#20110093
Date:  March 4, 2011

Permit type: Bfd fire alarm installations | Permit id: Bfdf62522
2011/03/04095835 Huntington Av Boston Ma
SCORE
69
Interior repairs to walls and ceilings to unit#39 new whinty
Date:  April 22, 2010
Value:   $2,400
Contractor: Vadym Huzenko

Permit type: Short form bldg permit | Expiration date: October 22, 2010 | Current use: 1unit | Permit id: Sf22691
2010/04/22240069835 Huntington Av Boston MaVadym Huzenko
SCORE
100
Install temporary electrical panel for outside community meeting on june 9 2013
Date:  June 4, 2013
Value:   $1,000
Contractor: George Elder

Permit type: Electrical permit | Expiration date: December 4, 2013 | Current use: Mixed | Permit id: E250173
2013/06/041000100835 Huntington Av Boston MaGeorge Elder
Welding for replacemnt of heating valves (dpl) bfd paid detail required
Date:  September 8, 2011

Permit type: Bfd cutting-burning-welding | Permit id: Cbw93960
2011/09/08095835 Huntington Av Boston Ma
Construction on 1st floor
Date:  January 19, 2011

Permit type: Bfd bag smoke detectors | Permit id: Bsd59199
2011/01/19095835 Huntington Av Boston Ma
SCORE
100
Install temporary generator on stand by existing in house generator is off line install at levinson building
Date:  January 24, 2014
Value:   $3,000
Contractor: George Elder

Permit type: Electrical permit | Expiration date: July 24, 2014 | Current use: Multi | Permit id: E321749
2014/01/243000100835 Huntington Av Boston MaGeorge Elder
SCORE
79
Flynn building-unit504- replace devices switches outlets and bath kitchen gfci devices
Date:  May 21, 2014
Value:   $1,150
Contractor: Matt Elder

Permit type: Electrical permit | Expiration date: November 21, 2014 | Current use: Multi | Permit id: E364944
2014/05/21115079835 Huntington Av Boston MaMatt Elder
SCORE
83
Elevator modifications to include 3 60amp 480v fusible disconnects a dedicated 20a circuit gfci & lights in machine room & pit
Date:  June 2, 2010
Value:   $26,000
Contractor: John Spadafora

Permit type: Electrical permit | Expiration date: December 2, 2010 | Current use: Comm | Permit id: E28137
2010/06/022600083835 Huntington Av Boston MaJohn Spadafora
Cutting / welding for installation of replacement heating valves (dpl) 2-firefighters bfd paid detail required
Date:  May 31, 2011

Permit type: Bfd cutting-burning-welding | Permit id: Cbw78839
2011/05/31095835 Huntington Av Boston Ma
SCORE
100
Install temporary electrical panel for outside community meeting
Date:  June 9, 2010
Value:   $500
Contractor: George Elder

Permit type: Electrical permit | Expiration date: December 9, 2010 | Current use: 7more | Permit id: E28747
2010/06/09500100835 Huntington Av Boston MaGeorge Elder
SCORE
100
Conduit and wire for boiler control and mua at mission park levinson building
Date:  November 6, 2012
Value:   $16,500
Contractor: Dana Crosby

Permit type: Electrical low voltage | Expiration date: May 6, 2013 | Current use: Multi | Permit id: Elv184740
2012/11/0616500100835 Huntington Av Boston MaDana Crosby
SCORE
82
Add 1 floor drain
Date:  January 26, 2011
Value:   $3,000
Contractor: Wayne Beane

Permit type: Plumbing permit | Expiration date: July 26, 2011 | Current use: 7more | Permit id: Pl61715
2011/01/26300082835 Huntington Av Boston MaWayne Beane
Welding for emergency repair to hot water distribution systems (dpl)
Date:  May 17, 2013

Permit type: Bfd cutting-burning-welding | Permit id: Cbw243578
2013/05/17095835 Huntington Av Boston Ma
SCORE
83
Installing (2)addressable relays and (1) addressable smoke with programming to complete elevator modifications
Date:  June 2, 2010
Value:   $2,000
Contractor: John Spadafora

Permit type: Electrical fire alarms | Expiration date: December 2, 2010 | Current use: Comm | Permit id: Efa28139
2010/06/02200083835 Huntington Av Boston MaJohn Spadafora
SCORE
96
Rewiring kitchen and bathroom. Making apt handicap accessable.
Date:  July 11, 2014
Value:   $3,000
Contractor: Jimmy Aguilar

Permit type: Electrical permit | Expiration date: January 11, 2015 | Current use: Multi | Permit id: E383278
2014/07/11300096835 Huntington Av Boston MaJimmy Aguilar
SCORE
71
Repair of fire alarm panel damaged as a result of a sprinkler break requiring the replacment of multiple parts in the fire control panel.
Date:  April 11, 2011
Value:   $1
Contractor: Pauric Baxter

Permit type: Short form bldg permit | Expiration date: October 11, 2011 | Current use: Other | Permit id: Sf71745
2011/04/11171835 Huntington Av Boston MaPauric Baxter
SCORE
100
Duggan-bld.-301- replace switches receptacles lights
Date:  January 8, 2010
Value:   $700
Contractor: George Elder

Permit type: Electrical permit | Expiration date: July 8, 2010 | Current use: 7more | Permit id: E10091
2010/01/08700100835 Huntington Av Boston MaGeorge Elder
SCORE
100
Install new fire alarm commumicator
Date:  December 1, 2010
Value:   $25,000
Contractor: Karen Sykes

Permit type: Electrical fire alarms | Expiration date: June 1, 2011 | Current use: Comm | Permit id: Efa53652
2010/12/0125000100835 Huntington Av Boston MaKaren Sykes
SCORE
79
Install temporary electrical panel at kempton street for outside community meeting june 8th
Date:  May 30, 2014
Value:   $1,000
Contractor: Matt Elder

Permit type: Electrical permit | Expiration date: November 30, 2014 | Current use: Multi | Permit id: E368158
2014/05/30100079835 Huntington Av Boston MaMatt Elder
SCORE
95
Main lobby: replace storefronts at front and rear replace accoustical ceiling install new flooring paint and electrical work
Date:  January 23, 2012
Value:   $154,522
Contractor: Chris Sullivan

Permit type: Short form bldg permit | Expiration date: July 23, 2012 | Current use: 7more | Permit id: Sf114741
2012/01/2315452295835 Huntington Av Boston MaChris Sullivan
SCORE
100
Install water pipe and backflow preventer .
Date:  October 5, 2010
Value:   $1,000
Contractor: Stephen Mcelhinney

Permit type: Plumbing permit | Expiration date: April 5, 2011 | Current use: Multi | Permit id: Pl45701
2010/10/051000100835 Huntington Av Boston MaStephen Mcelhinney
SCORE
96
Installing ten gas fired boilers and one gas fired mae up air unit
Date:  April 24, 2012
Value:   $500,000
Contractor: Joseph Milner

Permit type: Gas permit | Expiration date: October 24, 2012 | Current use: 7more | Permit id: G133471
2012/04/2450000096835 Huntington Av Boston MaJoseph Milner
SCORE
100
Neville building install 2 temporary wiring to 2 temp trailers that were already temp out to other construction site now temp out to mission park
Date:  March 17, 2016
Value:   $3,500
Contractor: George Elder

Permit type: Electrical permit | Expiration date: September 17, 2016 | Current use: Comm | Permit id: E571602
2016/03/173500100835 Huntington Av Boston MaGeorge Elder
Welding burning for removal of existing sidewalk lift dpl 8 19 15 bfd paid detail required
Date:  June 10, 2015

Permit type: Bfd cutting-burning-welding | Permit id: Cbw479147
2015/06/10095835 Huntington Av Boston Ma
Stand lift truck &; chipper at curb pedestrian staging on sidewalk
Date:  December 6, 2012

Permit type: Street occupancy permit | Expiration date: December 14, 2012 | Permit id: Occu-205726
2012/12/06095835 Huntington Av Boston Ma
SCORE
88
Demo bathroom ;new tile;flooring tub surround;tile painting. 605 flynn building
Date:  April 15, 2016
Value:   $79,250
Contractor: Francis Fasoli

Permit type: Short form bldg permit | Expiration date: October 15, 2016 | Current use: Multi | Permit id: Sf580552
2016/04/157925088835 Huntington Av Boston MaFrancis Fasoli
Replace existing pressure restricting valves with new pressure regulating valves on standpipe sprinkler system where pressure exceeds 175 psi floors 1-27 work to be done one floor and one riser at a time.; impaired riser to be clearly labled.; bfd detail with pumper required for building shut down.;fire;department connection to remain in service.
Date:  August 31, 2010

Permit type: Bfd sprinkler system | Permit id: Sprk36147
2010/08/31095835 Huntington Av Boston Ma
SCORE
82
Install 2 spare 3 inch pipe runs; install pipe and wiring for 14 street lights on new whitney street.
Date:  August 31, 2016
Value:   $70,000
Contractor: Matthew Elder

Permit type: Electrical permit | Expiration date: February 28, 2017 | Current use: Comm | Permit id: E630324
2016/08/317000082835 Huntington Av Boston MaMatthew Elder
SCORE
100
Unit 405 - demo rough finish kitchen and bathroom renovation. Panel is moving 5 ft but no disconnect of circuit needed
Date:  February 4, 2016
Value:   $8,000
Contractor: Matthew Glynn

Permit type: Electrical permit | Expiration date: August 4, 2016 | Current use: 1-2fam | Permit id: E560464
2016/02/048000100835 Huntington Av Boston MaMatthew Glynn
Cutting welding for installation of replacement heating valves (dpl) 2-firefighters bfd paid detail required
Date:  May 31, 2011

Permit type: Bfd cutting-burning-welding | Permit id: Cbw78839
2011/05/31095835 Huntington Av Boston Ma
Welding and burning of leaking underground piping for replacement
Date:  September 12, 2016

Permit type: Bfd cutting-burning-welding | Permit id: Cbw635281
2016/09/12095835 Huntington Av Boston Ma
SCORE
65
Removal and disposal of 15 sf of mastic
Date:  April 3, 2017
Contractor: Joe Mata

Permit type: Bfd asbestos removal | Permit id: Asb693741
2017/04/03065835 Huntington Av Boston MaJoe Mata
SCORE
82
Removal of asbestos; all common areas onto walls and ceilings
Date:  April 4, 2017
Contractor: Patrick Sennott

Permit type: Bfd asbestos removal | Permit id: Asb695148
2017/04/04082835 Huntington Av Boston MaPatrick Sennott
Bfd alter stationary portable
Date:  April 10, 2017

Permit id: Aspce685705
2017/04/10095835 Huntington Av Boston Ma
SCORE
82
Removal and dispose of asbestos
Date:  April 11, 2017
Contractor: Brandy Bucknell

Permit type: Bfd asbestos removal | Permit id: Asb697290
2017/04/11082835 Huntington Av Boston MaBrandy Bucknell
SCORE
67
Repairing/replacing existing retaining wall next to driveway that leads from;underground garage. This is being done due to deterioration of existing wall. This will also include a fence/guardrail on top of wall.
Date:  December 22, 2010
Value:   $87,325
Contractor: Timothy Reid

Permit type: Short form bldg permit | Expiration date: June 22, 2011 | Current use: 7more | Permit id: Sf56139
2010/12/228732567835 Huntington Av Boston MaTimothy Reid
SCORE
100
Address is 835 huntington ave replace and retrofit light fixtures
Date:  April 25, 2017
Value:   $12,000
Contractor: Nathan Hewes

Permit type: Electrical permit | Expiration date: October 25, 2017 | Current use: Multi | Permit id: E701804
2017/04/2512000100835 Huntington Av Boston MaNathan Hewes
SCORE
65
Legal occupancy:; 2 apartments after school program parking garage and wireless communications. Doc.#1153/2009. C/o -;after school program. Alt#105798 issued: 1/17/2012.
Date:  August 23, 2012
Value:   $95,934
Contractor: Madeline Stein

Permit type: Certificate of occupancy | Current use: Mixed | Permit id: Coo156081
2012/08/239593465835 Huntington Av Boston MaMadeline Stein
SCORE
82
Bfd asbestos removal
Date:  May 19, 2017
Contractor: Patrick Sennott

Permit id: Asb710879
2017/05/19082835 Huntington Av Boston MaPatrick Sennott
SCORE
96
Grinding only;of fittings to install new valves on the heating cooling piping (dpl)
Date:  May 30, 2017
Contractor: Joseph Milner

Permit type: Bfd cutting-burning-welding | Permit id: Cbw713364
2017/05/30096835 Huntington Av Boston MaJoseph Milner
SCORE
96
30x1 frame tent set-up 06/09/13 take down 06/09/13 tenant meeting
Date:  May 30, 2013
Value:   $2,700

Permit type: Short form bldg permit | Expiration date: November 30, 2013 | Current use: Vacld | Permit id: Sf236581
2013/05/30270096835 Huntington Av Boston MaBoston Party Rental Inc
SCORE
88
Installation of a low-voltage wireless burglar alarm
Date:  December 14, 2016
Value:   $850
Contractor: Laura Gardner

Permit type: Electrical low voltage | Expiration date: June 14, 2017 | Current use: 1-2fam | Permit id: Elv665166
2016/12/1485088835 Huntington Av Boston MaLaura Gardner
SCORE
59
Removal of ceilings walls and flooring in two offices long form to be filed to extend store front
Date:  December 1, 2016
Value:   $20,000
Contractor: Domenic Ricci

Permit type: Short form bldg permit | Expiration date: June 1, 2017 | Current use: Comm | Permit id: Sf661974
2016/12/012000059835 Huntington Av Boston MaDomenic Ricci
SCORE
100
Flynn 205 demo rough finish kitchen and bathroom renovation panel is moving. 5 ft no disconnect is needed at circuit needed
Date:  December 2, 2016
Value:   $8,000
Contractor: Matthew Glynn

Permit type: Electrical permit | Expiration date: June 2, 2017 | Current use: Multi | Permit id: E659928
2016/12/028000100835 Huntington Av Boston MaMatthew Glynn
SCORE
100
Neville 805 demo rough finish kitchen and bathroom renovation panel is moving 5 feet no disconnect is needed at circuit needed.
Date:  December 13, 2016
Value:   $10,000
Contractor: Matthew Glynn

Permit type: Electrical permit | Expiration date: June 13, 2017 | Current use: Multi | Permit id: E663379
2016/12/1310000100835 Huntington Av Boston MaMatthew Glynn
SCORE
91
Duggan and levinson lobbies: install (1) smoke detector (4) pull stations (3) speaker strobes (4) strobes
Date:  June 22, 2017
Value:   $4,000
Contractor: William Werle

Permit type: Electrical fire alarms | Expiration date: December 22, 2017 | Current use: Mixed | Permit id: Efa723528
2017/06/22400091835 Huntington Av Boston MaWilliam Werle
SCORE
100
Levinson building install 30-amp disconnect and wiring for freight elevator switch & light install wiring for 2-ton a/c unit and general purpose receptacle
Date:  September 16, 2015
Value:   $4,000
Contractor: George Elder

Permit type: Electrical permit | Expiration date: March 16, 2016 | Current use: Multi | Permit id: E519957
2015/09/164000100835 Huntington Av Boston MaGeorge Elder
SCORE
98
For unit 406 installing one combination smoke detector/sounder and one visual only to the existing fire alarm loop.
Date:  August 4, 2014
Value:   $4,000
Contractor: Michael Harrington

Permit type: Electrical fire alarms | Expiration date: February 4, 2015 | Current use: Multi | Permit id: Efa391508
2014/08/04400098835 Huntington Av Boston MaMichael Harrington
Bfd chemist certificate proces
Date:  March 13, 2017

Permit id: Chm684921
2017/03/13095835 Huntington Av Boston Ma
SCORE
82
Only one sprinkler zone may be impaired at any time within the building.... Coordinated sprinkler impairment with the buildings listed nfpa 241 impairment coordinator..... Installation shall be in accordance with the requirements of 7 cmr and nfpa 13 and isd approved shop drawings.
Date:  January 26, 2017
Contractor: Justin Fishlin

Permit type: Bfd sprinkler system | Permit id: Sprk670089
2017/01/26082835 Huntington Av Boston MaJustin Fishlin
SCORE
72
Total renovating of office space and lobby with;between two;separate buildings the duggan and livinston buildings. Construction of wall framing new heating and electrical systems. Modification of sprinkler system. Duggan building will have an extention of office space by 6x25 with a foundation. The livinston lobby will be extended out by 10x25 at both entrances
Date:  January 27, 2017
Value:   $1,002,874
Contractor: John Donato

Permit type: Long form/alteration permit | Expiration date: July 27, 2017 | Current use: Comm | Permit id: Alt662885
2017/01/27100287472835 Huntington Av Boston MaJohn Donato
SCORE
99
Welding only for the replacement of entry doors at front and rear of building (dpl) ; bfd paid detail required
Date:  March 15, 2017
Contractor: Richard Shaw

Permit type: Bfd cutting-burning-welding | Permit id: Cbw687599
2017/03/15099835 Huntington Av Boston MaRichard Shaw
SCORE
91
Lobby renovations duggan and levinson
Date:  February 2, 2017
Value:   $56,980
Contractor: William Werle

Permit type: Electrical permit | Expiration date: August 2, 2017 | Current use: Mixed | Permit id: E677895
2017/02/025698091835 Huntington Av Boston MaWilliam Werle
SCORE
95
Nstar outage to perorm maintenance to the levison building 4 volt switchgear at mission park. Nstar w/o 2003682
Date:  May 30, 2014
Value:   $3,000
Contractor: Joseph Cipolla

Permit type: Electrical permit | Expiration date: November 30, 2014 | Current use: Multi | Permit id: E368433
2014/05/30300095835 Huntington Av Boston MaJoseph Cipolla
SCORE
96
Fraser needs to weld to repair leaking heat pipes underground on mission park dr.
Date:  November 9, 2016
Contractor: Joseph Milner

Permit type: Bfd cutting-burning-welding | Permit id: Cbw654033
2016/11/09096835 Huntington Av Boston MaJoseph Milner
Alteration to an existing system or less
Date:  January 14, 2017

Permit type: Bfd fire alarm installations | Permit id: Bfdf671959
2017/01/14095835 Huntington Av Boston Ma
SCORE
96
To bag smoke detectors due to drilling
Date:  August 30, 2011

Permit type: Bfd bag smoke detectors | Permit id: Bsd92548
2011/08/30096835 Huntington Av Boston MaBond Cancelled Knollmeyer Building Corp
SCORE
65
Removal of 51 square feet of vinyl tile and mastic
Date:  December 30, 2016
Contractor: Joe Mata

Permit type: Bfd asbestos removal | Permit id: Asb668427
2016/12/30065835 Huntington Av Boston MaJoe Mata
SCORE
93
Replacing toilets lavs kitchen sinks
Date:  January 13, 2017
Value:   $5,000
Contractor: John Cresta

Permit type: Plumbing permit | Expiration date: July 13, 2017 | Current use: Comm | Permit id: Pl672698
2017/01/13500093835 Huntington Av Boston MaJohn Cresta
SCORE
96
1-30x1 frame tent for community meeting set-up use and break down 6/8/14 in parking lot area on kempton street side of complex
Date:  May 21, 2014
Value:   $3,384

Permit type: Short form bldg permit | Expiration date: November 21, 2014 | Current use: Vacld | Permit id: Sf363700
2014/05/21338496835 Huntington Av Boston MaBoston Party Rental Inc
SCORE
92
Install a 20a/1p - 120v circuit to radio equipment cabinet in the levinson flynn duggan and neville bldgs. Install empty conduit for installation of antenna cable to mast location.
Date:  April 11, 2012
Value:   $14,000
Contractor: Brian Queenan

Permit type: Electrical permit | Expiration date: October 11, 2012 | Current use: 7more | Permit id: E128797
2012/04/111400092835 Huntington Av Boston MaBrian Queenan
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.