Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Roof mount residential solar pv for existing sfd (no meter upgrade). Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. 12-11-13:plan change elec only:maz Date: November 27, 2013 Contractor: Michael Tanner Permit type: Electrical : 8002 - | Permit status: Permit finaled | Completion date: December 16, 2013 | Permit id: Pds2013-Resalt- | |||||
SCORE 96 Roof mount residential solar pv for existing sfd (no meter upgrade). Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. 12-11-13 plan change elec only maz Date: November 27, 2013 Contractor: Quality Home Renovators Inc Permit type: Residential alteration-addn | Permit status: Completed | Completion date: December 16, 2013 | Permit id: Pds2013-Resalt- | |||||
SCORE 96 Hvac change out - fau or wall heater - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: July 26, 2017 Contractor: Jerrys Heating And Air Conditioning Inc Permit type: Addn | Permit status: Issued | Permit id: Pds2017-Resalt- | |||||
SCORE 89 Hvac change out - split system - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: September 28, 2017 Contractor: The Right Choice Heating And Air Inc Permit type: Addn | Permit status: Completed | Completion date: October 27, 2017 | Permit id: Pds2017-Resalt- | |||||
SCORE 79 Roof mount residential solar pv for existing sfd with existing residential main electrical service upgrade - 125a - the scope of work is limited to upgrades of the existing main service panel, relocation of the existing loads, new sub-panels to accomodate solar loads, and relocation of existing panels in compliance with all zoning ordinances only, does not include additional new main service panels. This permit does not exempt any existing structures from compliance with applicable building code and zoning ordinance requirements. Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. 01-02-18 plan change see c of a for details... Lmy Date: November 16, 2017 Contractor: N R G Clean Power Inc Permit type: Addn | Permit status: Issued | Permit id: Pds2017-Resalt- | |||||
Final Date: December 16, 2013 Permit status: Pass | Permit id: Pds2013-Resalt- |