Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Permit id: 00-06-118 | Parcel: 014640005000 | |||||
Permit id: 09-07-068 | Parcel: 014794007000 | |||||
Permit id: 10-01-104 | Parcel: 014794007000 | |||||
SCORE 56 Replace approximately section of curb which is sunken along stillwater. Verify location of water meter and sewer cleanout are within city right of way. If not, they shall be relocated into right-of-way. On site, relocation storm drain from under proposed building. Landscape: install backflow device to landscape connection. A preconstruction meeting is required call (916) 617-4692. All work shall comply with city standards and details. Final engineering encroachment inspection is required. Permit id: 09-0204 | Parcel: 014794007000 |