| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Revision to permit b1109284 the original scope was to remove the roof above the proposed master bedroom and raise the rear wall by about 3 feet. Then install a new roof ready for a green roof. We decided not to tear off the old roof after we performed the interior demolition. We still needed to increase the strength of the existing roof for the green roof material which we did as per the engineers drawings. We also changed out the existing air conditioner with a new rooftop unit but utilized the existing ductwork. Basically all that was added was the penetration through the roof to connect where the unit in the closet had been and the compressor on the roof changed to an all in one unit. Client: Howard Crystal | Applicant: Howard Crystal; Scott Hammar | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1211644 | |||||
Electrical Client: Ann R Crystal | Applicant: Eugene S Ahns | Permit status: Completed | Permit id: E1203693 | |||||
2. 5 ton Client: Howard M Crystal | Applicant: Kewal K Khatta | Permit type: Mechanical | Permit status: Completed | Permit id: M1201102 | |||||
SCORE 96 Plumbing and gas Client: Howard M Crystal | Permit status: Completed | Permit id: P1203310 | |||||
SCORE 96 Electrical Client: Ann R Crystal | Permit status: Completed | Permit id: E1203693 | |||||
SCORE 96 Electrical Client: Howard M Crystal | Permit status: Permit issued | Permit id: E1603194 | |||||
SCORE 96 Plumbing and gas Client: Howard M Crystal | Permit status: Completed | Permit id: P1603651 | |||||
SCORE 96 Electrical Client: Ann R Crystal | Permit status: Completed | Permit id: E1203693 | |||||
SCORE 56 Revision to permit b1109284 the original scope was to remove the roof above the proposed master bedroom and raise the rear wall by about 3 feet. Then install a new roof ready for a green roof. We decided not to tear off the old roof after we performed the interior demolition. We still needed to increase the strength of the existing roof for the green roof material which we did as per the engineers drawings. We also changed out the existing air conditioner with a new rooftop unit but utilized the existing ductwork. Basically all that was added was the penetration through the roof to connect where the unit in the closet had been and the compressor on the roof changed to an all in one unit. Client: Howard Crystal | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1211644 | |||||
SCORE 96 Plumbing and gas Client: Howard M Crystal | Permit status: Completed | Permit id: P1203310 | |||||
SCORE 96 Electrical Client: Howard M Crystal | Permit status: Completed | Permit id: E1603194 | |||||
SCORE 96 Plumbing and gas Client: Howard M Crystal | Permit status: Completed | Permit id: P1603651 | |||||
SCORE 56 Revision to permit b1109284 the original scope was to remove the roof above the proposed master bedroom and raise the rear wall by about 3 feet. Then install a new roof ready for a green roof. We decided not to tear off the old roof after we performed the interior demolition. We still needed to increase the strength of the existing roof for the green roof material which we did as per the engineers drawings. We also changed out the existing air conditioner with a new rooftop unit but utilized the existing ductwork. Basically all that was added was the penetration through the roof to connect where the unit in the closet had been and the compressor on the roof changed to an all in one unit. Client: Howard Crystal | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1211644 | |||||
SCORE 96 Electrical Client: Ann R Crystal | Permit status: Completed | Permit id: E1203693 | |||||
SCORE 96 Plumbing and gas Client: Howard M Crystal | Permit status: Completed | Permit id: P1203310 | |||||
SCORE 84 2. 5 ton Client: Howard M Crystal | Permit type: Mechanical | Permit status: Completed | Permit id: M1201102 | |||||
SCORE 67 Remove and replace kitchen cabinets and gas range. Client: Howard Crystal | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1602326 | |||||
SCORE 67 Repairing and replacing rotten shutters Client: Howard Crystal | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1605161 | |||||
SCORE 82 Install one direct vent insert using csst gas piping. Client: Howard Crystal | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1604607 | |||||
SCORE 96 Electrical Client: Howard M Crystal | Permit status: Completed | Permit id: E1603194 | |||||
SCORE 96 Plumbing and gas Client: Howard M Crystal | Permit status: Completed | Permit id: P1603651 |