Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 New sewer, water, and fire services to be stubbed into the flag lot of 802 arapahoe Date: December 29, 2010 Contractor: Nixcavating Inc Client: Chris Maurer,West Llc | Applicant: Nixcavating, Inc. | Permit type: Fire, water, wastewa | Permit status: N&v | Current use: Multifamily dwe | |||||
SCORE 100 Install new gas service for multi family residence Date: August 26, 2011 Contractor: Xcel Energy Client: Chris Maurer,West Llc | Applicant: Xcel Energy | Permit type: Right-of-way | Permit status: Iss | Current use: Multifamily dwe | |||||
Install new gas service for multi family residence Date: August 26, 2011 Client: Chris Maurer | Permit type: Right-of-way | Permit status: Iss | Current use: Multifamily dwellings, existing | Permit id: Pmt2011-03652 | |||||
SCORE 95 New sewer, water, and fire services to be stubbed into the flag lot of 802 arapahoe Contractor: Nixcavating, Inc Client: Chris Maurer | Permit type: Fire, water, wastewater, right-of-way | Permit status: N&v | Current use: Multifamily dwellings, new | Permit id: Pmt2010-05799 |