Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Mechanical permit Date: June 9, 2015 Client: Shipon Helene Family Trust #2 | Permit status: Expired | Permit id: 595749 | |||||
Plumbing permit Date: August 31, 2015 Client: Shipon Helene Family Trust #2 | Permit status: Completed | Permit id: 635688 | |||||
Alteration permit Date: April 21, 2014 Client: Helene Shipon, Tr | Client Company: The 2011 Shipon Family Trust#1 | Permit status: Completed | Permit id: 510980 | |||||
Alteration permit Date: November 25, 2013 Client: Helene Shipon, Tr | Client Company: The 2011 Shipon Family Trust#1 | Permit status: Completed | Permit id: 490316 | |||||
Zoning/use permit Date: August 29, 2012 Client: Helene Shipon, Tr | Client Company: The 2011 Shipon Family Trust#1 | Permit status: Completed | Permit id: 410039 | |||||
Electrical permit Date: June 5, 2015 Client: Helene Shipon, Tr | Client Company: The 2011 Shipon Family Trust#1 | Permit status: Completed | Permit id: 604371 | |||||
Zoning/use permit Date: August 13, 2015 Client: Helene Shipon, Tr | Client Company: The 2011 Shipon Family Trust#1 | Permit status: Completed | Permit id: 625684 | |||||
Suppression permit Date: July 15, 2015 Client: Helene Shipon, Tr | Client Company: The 2011 Shipon Family Trust#1 | Permit status: Completed | Permit id: 601078 | |||||
Zoning/use permit Date: March 6, 2014 Client: Helene Shipon, Tr | Client Company: The 2011 Shipon Family Trust#1 | Permit status: Completed | Permit id: 520256 | |||||
Administrative permit Date: August 21, 2015 Client: Helene Shipon, Tr | Client Company: The 2011 Shipon Family Trust#1 | Permit status: Completed | Permit id: 625668 | |||||
Plumbing permit Date: January 29, 2015 Client: Helene Shipon, Tr | Client Company: The 2011 Shipon Family Trust#1 | Permit status: Expired | Permit id: 584858 | |||||
Zoning use permit Date: August 13, 2015 Client: Helene Shipon, Tr | Client Company: The 2011 Shipon Family Trust#1 | Permit status: Completed | Permit id: 625684 | |||||
Zoning use permit Date: August 29, 2012 Client: Helene Shipon, Tr | Client Company: The 2011 Shipon Family Trust#1 | Permit status: Completed | Permit id: 410039 | |||||
Zoning use permit Date: March 6, 2014 Client: Helene Shipon, Tr | Client Company: The 2011 Shipon Family Trust#1 | Permit status: Completed | Permit id: 520256 | |||||
SCORE 93 For the demolition of one-story garage at rear. For the erection of a one-story rear addition. For interior alterations to include construction of interior non-load bearing walls and all other alterations as per approved plans in an existing structure to be used as an eight (8) family dwelling. Date: April 21, 2014 Contractor: Dn Construction Llc Permit type: Alteration permit | Permit status: Completed | Completion date: October 27, 2015 | Permit id: 510980 | |||||
Reduce 12 cmu wall to 8 3" wall. New additional embelishemnts @ front & side facades Date: August 13, 2015 Permit type: Zoning/use permit | Permit status: Completed | Completion date: August 13, 2015 | Permit id: 625684 | |||||
Erection of a roof deck with 42" guard rails above the existing second floor roof access from existing third floor (accessory roof deck for residential use only. Size and location as shown on the application. For use as (8) family dwelling as previously approved in the same existing structure. Date: March 6, 2014 Permit type: Zoning/use permit | Permit status: Completed | Completion date: April 16, 2014 | Permit id: 520256 | |||||
SCORE 100 Interior plumbing alterations to a point 5-0" outside only for an (8)family dwelling - note: backflow prevention containment device at the water meter, exterior plumbing & sewer water connections to the city mains required separate permit(s) - plastic drainage and water supply piping is prohibited in this occupancy type Date: January 29, 2015 Contractor: Richards Barrymore Permit type: Plumbing permit | Permit status: Completed | Completion date: March 29, 2017 | Permit id: 584858 | |||||
Amending permit# 5109 to reflect modification of proposed fire suppression system from previously approved nfpa 13 to nfpa 13r as per plans. Date: April 8, 2015 Permit type: Administrative permit | Permit status: Completed | Completion date: October 27, 2015 | Permit id: 594756 | |||||
SCORE 100 For the installation of an automatic fire suppression system throughout a multi-family residence in accordance with nfpa 13r standards. System provide with a backflow prevention assembly and serviced via a 2" fire service main line with 1-1 2" risers, cross mains, and branch lines. Date: July 15, 2015 Contractor: Oneida Fire Protection Permit type: Suppression permit | Permit status: Completed | Completion date: October 27, 2015 | Permit id: 601078 | |||||
SCORE 86 Wiring throughout a 8 family dwelling with switches, lights, outlets and smokes and install a 400amp 3 phase service as per 2008 nec (south district) install fire alarm system as per nfpa72 Date: June 5, 2015 Contractor: Sigma Electric Group Inc Permit type: Electrical permit | Permit status: Completed | Completion date: November 12, 2015 | Permit id: 604371 | |||||
To amend permit #5109 to reflect change in height of the structure from previously approved 24-4" to 26-4", for reduction of exisitng 12 ft cmu wall to 8-6" and new architectural embellishment as per approved plans. Date: August 21, 2015 Permit type: Administrative permit | Permit status: Completed | Completion date: October 27, 2015 | Permit id: 625668 | |||||
Relocation of lot lines to make (1) lot from (3) lots. To be used as existing laundromat and (9) proposed residential units. Date: August 29, 2012 Permit type: Zoning/use permit | Permit status: Completed | Completion date: August 29, 2012 | Permit id: 410039 | |||||
SCORE 96 Interior and partial demolition. Remove asbestos prior to commencing work per asbestos inspection report Date: November 25, 2013 Contractor: James Dibartolo Permit type: Alteration permit | Permit status: Completed | Completion date: April 27, 2015 | Permit id: 490316 | |||||
Zoning permit Date: February 8, 2012 Client: Shipon Helene Tr | Permit status: Completed | Permit id: 387159 | |||||
Plumbing permit Date: August 31, 2015 Client: Shipon Helene Family Trust #2 | Permit status: Completed | Permit id: 635688 | |||||
Mechanical permit Date: June 9, 2015 Client: Shipon Helene Family Trust #2 | Permit status: Expired | Permit id: 595749 | |||||
SCORE 100 Install 2" water service pa20152391438(multi family)self certifications are no longer permitted","all excavations and plumbing trenches in excess of 5 ft in depth must have approved shoring in place at the time of inspection" Date: August 31, 2015 Contractor: Richards Barrymore Client: Shipon Helene Family Trust #2 | Permit type: Plumbing permit | Permit status: Completed | Completion date: October 5, 2015 | Permit id: 635688 | |||||
SCORE 93 3 apartments - minisplits - 5 apartments - gas furnace 60,0 btu 90% - 2 ton coil, 2 ton condenser and associated ductwork. Date: June 9, 2015 Contractor: Igs Services Llc Client: Shipon Helene Family Trust #2 | Permit type: Mechanical permit | Permit status: Expired | Completion date: April 6, 2016 | Permit id: 595749 | |||||
Zoning permit Date: February 8, 2012 Client: Shipon Helene Tr | Permit status: Completed | Permit id: 387159 | |||||
Relocation of lot lines to make (1) lot from (3) lots. To be used as existing laundromat and (9) proposed residential units. Date: February 8, 2012 Client: Shipon Helene Tr | Permit type: Zoning permit | Permit status: Completed | Completion date: February 8, 2012 | Permit id: 387159 |