Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Wellington estates Date: October 17, 2013 Permit status: Closed | Permit id: 13-04892 | |||||
SCORE 100 Wellington estates Date: October 17, 2013 Contractor: Energy Solutions Co Client: Wellington Estates | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 13-04892 | Parcel: 1947068 | |||||
SCORE 100 Wellington estates Date: October 17, 2013 Contractor: R And D Modular And Mobile Const Client: Wellington Estates | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 13-04892 | Parcel: 1947068 | |||||
July 24, 2013 4:21:01 pm scarver. Setting new double wide 3br/2ba-master approval 09-6160; october 17, 2013 8:39:07 am ssalyer. No premise number did not call duke;sls; october 17, 2013 8:38:52 am ssalyer. Setting new double wide 3br/2ba-master approval 09-6160;sls; manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. Deck & landing larger than 5 square feet requires separate deck permit. Building "final" includes water/waste line hook-ups. Permit type: Permits - historical | Permit status: Closed | Permit id: 13-04892 | Parcel: 1947068 | |||||
SCORE 100 Wellington estates Date: October 17, 2013 Contractor: R And D Modular And Mobile Const Client: Wellington Estates | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 13-04892 | Parcel: 1947068 | |||||
July 24, 2013 4:21:01 pm scarver. Setting new double wide 3br 2ba-master approval 09-6160; october 17, 2013 8:39:07 am ssalyer. No premise number did not call duke;sls; october 17, 2013 8:38:52 am ssalyer. Setting new double wide 3br 2ba-master approval 09-6160;sls; manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. Deck & landing larger than 5 square feet requires separate deck permit. Building "final" includes water waste line hook-ups. Date: October 17, 2013 Permit type: Permits - historical | Permit status: Closed | Permit id: 13-04892 | Parcel: 1947068 |