RENOVATION HISTORY
Based on the information received from building department, associated with 8 22nd Street Nw Washington DC over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
To install ada ramp at eye street nw as per drawings.
Date:  December 22, 2014
Value:   $300

Client: George Wasahington University | Permit type: Projections; ada ram | Permit id: Pa104167
2014/12/22300958 22nd Street Nw Washington Dc
SCORE
99
Mill and overlay approx ft wide curb lane around the entire block: on 22nd st nw between h st and eye st; 23rd st nw between h st and eye st; eye st nw between 22nd st and 23rd st; h st nw between 22nd st and 23rd st. Duration of work: 2 days.
Date:  January 15, 2015
Value:   $1,569
Contractor: Kalos Construction

Client: George Washington University | Permit type: Paving; mill and ove | Permit id: Pa104959
2015/01/151569998 22nd Street Nw Washington DcKalos Construction
3450332 - make repairs burnt up service conduit and cable 2 x 2 in the sidewalk.
Date:  February 20, 2015
Value:   $300

Client: Pepco Electric Power Co | Permit type: Excavation; repair e | Permit id: Pa106390
2015/02/20300958 22nd Street Nw Washington Dc
SCORE
89
Winter moratorium letter required. Excavation sheeting and shoring, foundations to grade and building permit this construction permit requires a separate occupancy permit. The attached plans and conditions are a part of this permit. If steel plates are used at this job site an additional permit is needed this permit expires duration of project.
Date:  December 6, 2011

Permit type: Excavation; sheeting & shoring (for buildings) | Permit status: Cancel/withdrawn | Expiration date: June 4, 2012
2011/12/060898 22nd Street Nw Washington DcGeorge Wasahington University
Kalos construction have deposit bond #7844 on file - deposit fee waived; install in 23rd st nw: approx 2 of 8" watermain, 6" lateral connection to jbko hall, 6" domestic water w meter vault, 8" fire service, 12" sanitary w 2 manholes, 4" storm drain connection. Install in h st nw: 12" storm lateral w 2 manholes, 10" sanitary lateral w 2 manholes. Install at intersection 22nd & h st nw: approx of 6" watermain, 6" lateral w new fire hydrant. Install at intersection 22nd & eye st nw: approx of 8" watermain.
Date:  November 30, 2012

Client: George Washington University | Permit type: Excavation; fire hydrant | Permit status: Permit expired | Expiration date: March 16, 2013 | Permit id: Pa77348
2012/11/300958 22nd Street Nw Washington Dc
1st - extension of permit number pa77348 ( 77348r1=80360); kalos construction have deposit bond #7844 on file - deposit fee waived; install in 23rd st nw: approx 2 of 8" watermain, 6" lateral connection to jbko hall, 6" domestic water w meter vault, 8" fire service, 12" sanitary w 2 manholes, 4" storm drain connection. Install in h st nw: 12" storm lateral w 2 manholes, 10" sanitary lateral w 2 manholes. Install at intersection 22nd & h st nw: approx of 6" watermain, 6" lateral w new fire hydrant. Install at intersection 22nd & eye st nw: approx of 8" watermain.
Date:  March 12, 2013

Client: George Washington University | Permit type: Excavation; fire hydrant | Permit status: Permit expired | Expiration date: May 21, 2013 | Permit id: Pa77348-R1
2013/03/120958 22nd Street Nw Washington Dc
SCORE
65
60,000. Dollar street light deposit required. Removal of 12 exsiting street lights. Installation of 21 new streetlights and 7 new manholes along h-street nw, 23rd street nw, 22nd street nw, and eye street nw. Also, traffic signal modification for intersection of 23rd and h-street nw, as well as, signal modification fo intersection of 23rd and eye street nw. This construction permit requires a separate occupancy permit. The attached plans and conditions are a part of this permit. If steel plates are used at this job site an additional permit is needed.
Date:  March 18, 2013
Contractor: Tyler Dockendorf

Client: Damona Strautmanis | Permit type: Excavation; electric connection (trench), excavation; manhole installation, over head work; streetlight temporary removal, over head work; streetlight(s) installation | Permit status: Cancel/withdrawn | Expiration date: July 11, 2013
2013/03/180658 22nd Street Nw Washington DcTyler Dockendorf
SCORE
95
Direct bury 241 of 4"pla-20# main in 23rd st. Nw to serve the campus bldg., at 8 22nd st nw ( gwu science & engineering hall) between h st nw and i st nw, permit#1720 wr#1073228 bca#85959-1 request staging area attached drawing condition of permit should be 6 months duration
Date:  April 22, 2013

Permit type: Excavation; cathodic protection, excavation; gas main line (trench) | Permit status: Cancel/withdrawn | Expiration date: October 31, 2013
2013/04/220958 22nd Street Nw Washington DcWash Gas And Light Co
1st - extension of permit number pa77348 ( 77348r1=80360); kalos construction have deposit bond #7844 on file - deposit fee waived; install in 23rd st nw: approx 2 of 8" watermain, 6" lateral connection to jbko hall, 6" domestic water w meter vault, 8" fire service, 12" sanitary w 2 manholes, 4" storm drain connection. Install in h st nw: 12" storm lateral w 2 manholes, 10" sanitary lateral w 2 manholes. Install at intersection 22nd & h st nw: approx of 6" watermain, 6" lateral w new fire hydrant. Install at intersection 22nd & eye st nw: approx of 8" watermain.
Date:  January 28, 2014

Client: George Washington University | Permit type: Excavation; fire hydrant | Permit status: Permit expired | Expiration date: April 1, 2014 | Permit id: Pa77348-R6
2014/01/280958 22nd Street Nw Washington Dc
SCORE
89
3451838 - cut out 8 x 8 wall manhole collasping - 1 ft south of the south curb of i st and 89 ft west of the west curb 22nd st nw
Date:  May 3, 2014

Permit type: Excavation; manhole roof (repair or replace only) | Permit status: Permit expired | Expiration date: July 1, 2014 | Permit id: Pa95053
2014/05/030898 22nd Street Nw Washington DcPepco Electric Power Co
SCORE
93
Direct bury install 241 of 4"pla-20# main in the roadway 23rd street n. W. Intersecting h street to i street to serve the campus bldg., at 8 22nd street n. W ( gwu science & engineering hall) permit#331674 wr#1073228 bca#85959
Date:  May 27, 2014
Contractor: Dci Dci

Permit type: Excavation; gas main line (trench) | Permit status: Permit expired | Expiration date: December 18, 2014 | Permit id: Pa95949
2014/05/270938 22nd Street Nw Washington DcDci Dci
Mill and overlay approx ft wide curb lane around the entire block: on 22nd st nw between h st and eye st; 23rd st nw between h st and eye st; eye st nw between 22nd st and 23rd st; h st nw between 22nd st and 23rd st. Duration of work: 2 days.
Date:  January 15, 2015

Client: George Washington University | Permit type: Paving; mill and overlay | Permit status: Permit expired | Expiration date: May 30, 2015 | Permit id: Pa104959
2015/01/150958 22nd Street Nw Washington Dc
SCORE
89
3450332 - make repairs burnt up service conduit and cable 2 x 2 in the sidewalk.
Date:  February 20, 2015

Permit type: Excavation; repair electric ml conduit | Permit status: Permit expired | Expiration date: April 20, 2015 | Permit id: Pa106390
2015/02/200898 22nd Street Nw Washington DcPepco Electric Power Co
SCORE
98
Mobile crane work zone
Date:  June 19, 2012
Contractor: United Rigging

Permit status: Expired | Expiration date: June 23, 2012 | Permit id: Pa10061161
2012/06/190988 22nd Street Nw Washington DcUnited Rigging
SCORE
99
Construction staging area

Permit status: Resubmit | Expiration date: June 14, 2012 | Permit id: 0
0998 22nd Street Nw Washington DcGeorge Washington University
SCORE
94
Mobile crane work zone
Date:  May 16, 2013
Contractor: Clark Concrete

Permit status: Revoked | Expiration date: May 29, 2013 | Permit id: 0
2013/05/160948 22nd Street Nw Washington DcClark Concrete
SCORE
93
Excavation; gas main line (trench)
Date:  October 8, 2014
Contractor: Dci Dci

Permit status: 8 | Expiration date: December 18, 2014 | Permit id: Pa95949
2014/10/080938 22nd Street Nw Washington DcDci Dci
SCORE
99
Mobile crane work zone
Date:  July 9, 2012
Contractor: Clark Construction

Permit status: Expired | Expiration date: August 5, 2012 | Permit id: Pa10065365
2012/07/090998 22nd Street Nw Washington DcClark Construction
SCORE
100
Mobile crane work zone
Date:  November 30, 2012

Permit status: Expired | Expiration date: December 8, 2012 | Permit id: Pa10080364
2012/11/3001008 22nd Street Nw Washington DcCrane Service Company
SCORE
99
Mobile crane work zone
Contractor: A And A Transfer

Permit status: Notpaid | Expiration date: August 22, 2015 | Permit id: 0
0998 22nd Street Nw Washington DcA And A Transfer
SCORE
95
Excavation; cathodic protection, excavation; gas main line (trench)

Permit status: 3 | Expiration date: October 31, 2013 | Permit id: 0
0958 22nd Street Nw Washington DcWash Gas And Light Co
SCORE
65
Excavation; electric connection (trench), excavation; manhole installation, over head work; streetlight temporary removal, over head work; streetlight(s) installation
Contractor: Tyler Dockendorf

Permit status: 3 | Expiration date: July 11, 2013 | Permit id: 0
0658 22nd Street Nw Washington DcTyler Dockendorf
SCORE
89
Excavation; sheeting & shoring (for buildings)

Permit status: 3 | Expiration date: June 4, 2012 | Permit id: 0
0898 22nd Street Nw Washington DcGeorge Wasahington University
SCORE
69
Construction staging area

Permit status: Notpaid | Expiration date: February 15, 2016 | Permit id: 0
0698 22nd Street Nw Washington DcBoston Properties Llc
SCORE
75
Other reserved parking
Contractor: Lesly Bell

Permit status: Resubmit | Expiration date: February 12, 2016 | Permit id: 0
0758 22nd Street Nw Washington DcLesly Bell
SCORE
93
60,000. Dollar street light deposit required. Removal of 12 exsiting street lights. Installation of 21 new streetlights and 7 new manholes along h-street nw, 23rd street nw, 22nd street nw, and eye street nw. Also, traffic signal modification for intersection of 23rd and h-street nw, as well as, signal modification fo intersection of 23rd and eye street nw. This construction permit requires a separate occupancy permit. The attached plans and conditions are a part of this permit. If steel plates are used at this job site an additional permit is needed.
Contractor: Wiles Mensch

Permit status: Cancel/withdrawn | Expiration date: July 11, 2013 | Permit id: 0
0938 22nd Street Nw Washington DcWiles Mensch
SCORE
95
Direct bury 241 of 4"pla-20# main in 23rd st. Nw to serve the campus bldg., at 8 22nd st nw ( gwu science & engineering hall) between h st nw and i st nw, permit#1720 wr#1073228 bca#85959-1 request staging area attached drawing condition of permit should be 6 months duration

Permit status: Cancel/withdrawn | Expiration date: October 31, 2013 | Permit id: 0
0958 22nd Street Nw Washington DcWash Gas And Light Co
SCORE
96
Direct bury install 241 of 4"pla-20# main in the roadway 23rd street n. W. Intersecting h street to i street to serve the campus bldg., at 8 22nd street n. W ( gwu science & engineering hall) permit#331674 wr#1073228 bca#85959
Date:  October 8, 2014
Contractor: Wash Gas And Light

Permit status: Permit expired | Expiration date: December 18, 2014 | Permit id: Pa95949
2014/10/080968 22nd Street Nw Washington DcWash Gas And Light
SCORE
94
Mobile crane work zone
Date:  May 16, 2013
Contractor: Clark Concrete

Permit status: Revoked | Expiration date: May 29, 2013 | Permit id: 0
2013/05/160948 22nd Street Nw Washington DcClark Concrete
SCORE
99
Mobile crane work zone
Contractor: A And A Transfer

Permit status: Not paid | Expiration date: August 22, 2015 | Permit id: 0
0998 22nd Street Nw Washington DcA And A Transfer
SCORE
69
Construction staging area

Permit status: Not paid | Expiration date: February 15, 2016 | Permit id: 0
0698 22nd Street Nw Washington DcBoston Properties Llc
SCORE
75
Other reserved parking
Contractor: Lesly Bell

Permit status: Resubmit | Expiration date: February 12, 2016 | Permit id: 0
0758 22nd Street Nw Washington DcLesly Bell
SCORE
99
Mobile crane work zone
Date:  April 14, 2016
Contractor: Wo Grubb

Permit status: Permit expired | Expiration date: May 14, 2016 | Permit id: Pa10238687
2016/04/140998 22nd Street Nw Washington DcWo Grubb
SCORE
82
Proposed route begin on 22nd street approx. 78 south of the intersection of i street nw and 22nd street nw at an existing fibergate manhole. Trench to place 128 of (1) 4" pvc equipped with (3) 1. 25" indt equipped with (1) 96 fiber southerly along 22nd street to the building located at 8 22nd street nw.
Date:  June 6, 2017

Client: Pete Zdebski | Permit type: Excavation; telecom connection (trench) | Permit status: Permit expired | Expiration date: August 7, 2017 | Permit id: Pa202104-R1
2017/06/060828 22nd Street Nw Washington DcNational Telecom Design National Telecom Design
SCORE
89
Excavation sheeting and shoring at 8 22nd st. Nw. Follow all wasa conditions set in their memo dated june 28,2011. Wmata conditional approval is per their memo dated 8/24/11.(1) the excavation support system design is based on recommendations of the geotechnical report prepared by ecs llc and therefore is acceptable. (2) the dewatering plans and movements monitoring plan are acceptable. Ipma has no objection to this application. Public space and ufa conditions are part of this permit.
Date:  May 17, 2011

Permit type: Excavation; sheeting & shoring (for buildings), over head work; streetlight damage deposit (office use only) | Permit status: Permit expired | Expiration date: September 6, 2012 | Permit id: Pa62479
2011/05/170898 22nd Street Nw Washington DcGeorge Wasahington University
SCORE
89
Excavation; sheeting & shoring (for buildings)

Permit status: 3 | Expiration date: June 4, 2012 | Permit id: 0
0898 22nd Street Nw Washington DcGeorge Wasahington University
SCORE
65
Excavation; electric connection (trench), excavation; manhole installation, over head work; streetlight temporary removal, over head work; streetlight(s) installation
Contractor: Tyler Dockendorf

Permit status: 3 | Expiration date: July 11, 2013 | Permit id: 0
0658 22nd Street Nw Washington DcTyler Dockendorf
SCORE
95
Excavation; cathodic protection, excavation; gas main line (trench)

Permit status: 3 | Expiration date: October 31, 2013 | Permit id: 0
0958 22nd Street Nw Washington DcWash Gas And Light Co
SCORE
89
3451838 - cut out 8 x 8 wall manhole collasping - 1 ft south of the south curb of i st and 89 ft west of the west curb 22nd st nw
Date:  May 8, 2014

Permit status: Permit expired | Expiration date: July 1, 2014 | Permit id: Pa95053
2014/05/080898 22nd Street Nw Washington DcPepco Electric Power Co
SCORE
89
3450332 - make repairs burnt up service conduit and cable 2 x 2 in the sidewalk.
Date:  February 24, 2015

Permit status: Permit expired | Expiration date: April 20, 2015 | Permit id: Pa106390
2015/02/240898 22nd Street Nw Washington DcPepco Electric Power Co
SCORE
100
Steel plate- single location
Date:  October 15, 2014
Contractor: Washington Gas

Permit status: Permit expired | Expiration date: October 17, 2014 | Permit id: Pa10163762
2014/10/1501008 22nd Street Nw Washington DcWashington Gas
SCORE
99
Construction staging area

Permit status: Resubmit | Expiration date: June 14, 2012 | Permit id: 0
0998 22nd Street Nw Washington DcGeorge Washington University
SCORE
99
Mobile crane work zone
Contractor: A And A Transfer

Permit status: Notpaid | Expiration date: August 22, 2015 | Permit id: 0
0998 22nd Street Nw Washington DcA And A Transfer
SCORE
69
Construction staging area

Permit status: Notpaid | Expiration date: February 15, 2016 | Permit id: 0
0698 22nd Street Nw Washington DcBoston Properties Llc
SCORE
75
Other reserved parking
Contractor: Lesly Bell

Permit status: Resubmit | Expiration date: February 12, 2016 | Permit id: 0
0758 22nd Street Nw Washington DcLesly Bell
SCORE
89
Paving; ada curb ramp, paving; driveway(s) new- commercial, paving; sidewalk(s), landscaping; new tree space(s)
Date:  December 29, 2011

Permit type: Paving; ada curb ramp, paving; driveway(s) new- commercial, paving; sidewalk(s), landscaping; new tree space(s) | Permit status: Permit expired | Expiration date: February 7, 2013 | Permit id: Pa68235
2011/12/290898 22nd Street Nw Washington DcGeorge Wasahington University
SCORE
99
Kalos construction have deposit bond #7844 on file - deposit fee waived; install in 23rd st nw: approx 2 of 8" watermain, 6" lateral connection to jbko hall, 6" domestic water w meter vault, 8" fire service, 12" sanitary w 2 manholes, 4" storm drain connection. Install in h st nw: 12" storm lateral w 2 manholes, 10" sanitary lateral w 2 manholes. Install at intersection 22nd & h st nw: approx of 6" watermain, 6" lateral w new fire hydrant. Install at intersection 22nd & eye st nw: approx of 8" watermain.
Date:  November 30, 2012
Contractor: Kalos Construction

Client: George Washington University | Permit type: Excavation; fire hydrant | Permit status: Permit expired | Expiration date: March 16, 2013 | Permit id: Pa77348
2012/11/300998 22nd Street Nw Washington DcKalos Construction
SCORE
99
1st - extension of permit number pa77348 ( 77348r1=80360); kalos construction have deposit bond #7844 on file - deposit fee waived; install in 23rd st nw: approx 2 of 8" watermain, 6" lateral connection to jbko hall, 6" domestic water w meter vault, 8" fire service, 12" sanitary w 2 manholes, 4" storm drain connection. Install in h st nw: 12" storm lateral w 2 manholes, 10" sanitary lateral w 2 manholes. Install at intersection 22nd & h st nw: approx of 6" watermain, 6" lateral w new fire hydrant. Install at intersection 22nd & eye st nw: approx of 8" watermain.
Date:  March 12, 2013
Contractor: Kalos Construction

Client: George Washington University | Permit type: Excavation; fire hydrant | Permit status: Permit expired | Expiration date: May 21, 2013 | Permit id: Pa77348-R1
2013/03/120998 22nd Street Nw Washington DcKalos Construction
SCORE
93
60,000. Dollar street light deposit required. Removal of 12 exsiting street lights. Installation of 21 new streetlights and 7 new manholes along h-street nw, 23rd street nw, 22nd street nw, and eye street nw. Also, traffic signal modification for intersection of 23rd and h-street nw, as well as, signal modification fo intersection of 23rd and eye street nw. This construction permit requires a separate occupancy permit. The attached plans and conditions are a part of this permit. If steel plates are used at this job site an additional permit is needed.
Contractor: Wiles Mensch

Permit status: Cancel/withdrawn | Expiration date: July 11, 2013 | Permit id: 0
0938 22nd Street Nw Washington DcWiles Mensch
SCORE
89
Paving; ada curb ramp, paving; driveway(s) new- commercial, paving; sidewalk(s), landscaping; new tree space(s)
Date:  February 13, 2013

Permit type: Paving; ada curb ramp, paving; driveway(s) new- commercial, paving; sidewalk(s), landscaping; new tree space(s) | Permit status: Permit expired | Expiration date: February 7, 2014 | Permit id: Pa68235-R1
2013/02/130898 22nd Street Nw Washington DcGeorge Wasahington University
SCORE
95
Direct bury 241 of 4"pla-20# main in 23rd st. Nw to serve the campus bldg., at 8 22nd st nw ( gwu science & engineering hall) between h st nw and i st nw, permit#1720 wr#1073228 bca#85959-1 request staging area attached drawing condition of permit should be 6 months duration

Permit status: Cancel/withdrawn | Expiration date: October 31, 2013 | Permit id: 0
0958 22nd Street Nw Washington DcWash Gas And Light Co
SCORE
99
1st - extension of permit number pa77348 ( 77348r1=80360); kalos construction have deposit bond #7844 on file - deposit fee waived; install in 23rd st nw: approx 2 of 8" watermain, 6" lateral connection to jbko hall, 6" domestic water w meter vault, 8" fire service, 12" sanitary w 2 manholes, 4" storm drain connection. Install in h st nw: 12" storm lateral w 2 manholes, 10" sanitary lateral w 2 manholes. Install at intersection 22nd & h st nw: approx of 6" watermain, 6" lateral w new fire hydrant. Install at intersection 22nd & eye st nw: approx of 8" watermain.
Date:  January 28, 2014
Contractor: Kalos Construction

Client: George Washington University | Permit type: Excavation; fire hydrant | Permit status: Permit expired | Expiration date: April 1, 2014 | Permit id: Pa77348-R6
2014/01/280998 22nd Street Nw Washington DcKalos Construction
SCORE
99
Paving; ada curb ramp, paving; curb & gutter(s), paving; driveway behind sidewalk (porous pervious only), paving; sidewalk(s), landscaping; new tree space(s), over head work; streetlight(s) installation
Date:  April 14, 2014

Permit type: Paving; ada curb ramp, paving; curb & gutter | Permit status: Permit expired | Expiration date: December 31, 2014 | Permit id: Pa94335
2014/04/140998 22nd Street Nw Washington DcGeorge Washington University
SCORE
89
To install ada ramp at eye street nw as per drawings.
Date:  December 22, 2014

Permit type: Projections; ada ramp | Permit status: Permit expired | Expiration date: June 30, 2015 | Permit id: Pa104167
2014/12/220898 22nd Street Nw Washington DcGeorge Wasahington University
SCORE
99
Mill and overlay approx ft wide curb lane around the entire block: on 22nd st nw between h st and eye st; 23rd st nw between h st and eye st; eye st nw between 22nd st and 23rd st; h st nw between 22nd st and 23rd st. Duration of work: 2 days.
Date:  January 15, 2015
Contractor: Kalos Construction

Client: George Washington University | Permit type: Paving; mill and overlay | Permit status: Permit expired | Expiration date: May 30, 2015 | Permit id: Pa104959
2015/01/150998 22nd Street Nw Washington DcKalos Construction
SCORE
82
Proposed route begin on 22nd street approx. 78 south of the intersection of i street nw and 22nd street nw at an existing fibergate manhole. Trench to place 128 of (1) 4" pvc equipped with (3) 1. 25" indt equipped with (1) 96 fiber southerly along 22nd street to the building located at 8 22nd street nw.
Date:  April 6, 2017

Client: Pete Zdebski | Permit type: Excavation; telecom connection (trench) | Permit status: Permit expired | Expiration date: June 8, 2017 | Permit id: Pa202104
2017/04/060828 22nd Street Nw Washington DcNational Telecom Design National Telecom Design
SCORE
99
Mobile crane work zone
Date:  December 18, 2013
Contractor: Clark Construction

Permit status: Permit expired | Expiration date: December 22, 2013 | Permit id: Pa10124799
2013/12/180998 22nd Street Nw Washington DcClark Construction
SCORE
99
Mobile crane work zone
Date:  February 28, 2014
Contractor: Clark Construction

Permit status: Permit expired | Expiration date: March 2, 2014 | Permit id: Pa10130888
2014/02/280998 22nd Street Nw Washington DcClark Construction
SCORE
96
Construction staging area
Date:  May 8, 2014

Permit status: Permit expired | Expiration date: June 30, 2014 | Permit id: Pa10139152
2014/05/080968 22nd Street Nw Washington DcPotomac Electric Power Company
SCORE
95
Construction staging area
Date:  December 12, 2014

Permit status: Permit expired | Expiration date: January 17, 2015 | Permit id: Pa10169778
2014/12/120958 22nd Street Nw Washington DcWash Gas And Light Co
SCORE
99
Construction staging area
Date:  March 16, 2015
Contractor: Kalos Construction

Permit status: Permit expired | Expiration date: March 28, 2015 | Permit id: Pa10179208
2015/03/160998 22nd Street Nw Washington DcKalos Construction
SCORE
86
Construction staging area
Date:  March 3, 2015

Permit status: Permit expired | Expiration date: March 19, 2015 | Permit id: Pa10177734
2015/03/030868 22nd Street Nw Washington DcPotomac Electric Power Co
SCORE
80
Other reserved parking
Date:  February 26, 2015
Contractor: David Synan

Permit status: Permit expired | Expiration date: March 4, 2015 | Permit id: Pa10178029
2015/02/260808 22nd Street Nw Washington DcDavid Synan
SCORE
99
Mobile crane work zone
Contractor: A And A Transfer

Permit status: Not paid | Expiration date: August 22, 2015 | Permit id: 0
0998 22nd Street Nw Washington DcA And A Transfer
SCORE
98
Mobile crane work zone
Date:  March 22, 2016
Contractor: Crane Service

Permit status: Permit expired | Expiration date: April 3, 2016 | Permit id: Pa10235687
2016/03/220988 22nd Street Nw Washington DcCrane Service
SCORE
69
Construction staging area

Permit status: Not paid | Expiration date: February 15, 2016 | Permit id: 0
0698 22nd Street Nw Washington DcBoston Properties Llc
SCORE
99
Mobile crane work zone
Date:  May 2, 2016
Contractor: Wo Grubb

Permit status: Permit expired | Expiration date: May 21, 2016 | Permit id: Pa10250736
2016/05/020998 22nd Street Nw Washington DcWo Grubb
SCORE
75
Other reserved parking
Contractor: Lesly Bell

Permit status: Resubmit | Expiration date: February 12, 2016 | Permit id: 0
0758 22nd Street Nw Washington DcLesly Bell
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.