Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 89 Equipment work Date: November 6, 2015 Contractor: Ueg New York Inc Permit status: Permit issued | Permit id: 32118217101 | |||||
SCORE 100 Plumbing Date: November 20, 2015 Contractor: Aljer Plbg And Htg Corp Permit status: Permit issued | Permit id: 32118217101 | |||||
Local law #1 violation : as per hpds abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new yor Date: November 25, 2005 Permit type: Delead | Permit id: E615253 | |||||
At boiler room repairs. Remove all defective ceiling approx : 5 sq ft. P/i new sheet rock ceiling and tin metal approx: sq ft. Re-secure loose m Date: April 16, 2014 Permit type: Gc | Permit id: Ee21482 | |||||
Bldg: install a new service to include a new meter bar and gas line from meter bar to boiler and hot water heater. File for and obtain all necessary p Date: January 30, 2014 Permit type: Plumb | Permit id: Ee14844 | |||||
Nationalgrid provide gas to boiler/hot water heater. Date: July 1, 2014 Permit type: Util | Permit id: Ef02326 | |||||
As per mini rc # 2014000129201 (eas) and hpd specification, perform polarized light microscopy (plm) analysis of 2 samples for asbestos content util Date: February 4, 2014 Permit type: Asbest | Permit id: Ee16023 | |||||
As per rc # 2012143636409 (newyork environmental systems), perform asbestos abatement pursuant to hpd rc specification and title 15, chapter 1, rules Date: February 19, 2014 Permit type: Asbest | Permit id: Ee15986 | |||||
P/i new boiler feed with cut off switch at top of the stairs to basement. P/i complete new boiler room 4 Date: March 17, 2014 Permit type: Elec | Permit id: Ee19418 | |||||
Bldg: register boiler and hot water heater. Make all corrections to boiler and hot water heater to bring to code. Pay any additional to d. O. B. Inconj Date: February 24, 2014 Permit type: Plumb | Permit id: Ee17509 | |||||
Perform asbestos project monitoring, air sampling and analysis in accordance with hpd specification for the above address in the basement; 23 l. Ft. O Date: February 11, 2014 Permit type: Asbest | Permit id: Ee16008 | |||||
Nationalgrid provide gas to boiler hot water heater. Date: January 6, 2014 Permit type: Util | Permit id: Ee13111 | |||||
P i new boiler feed with cut off switch at top of the stairs to basement. P i complete new boiler room 4 Date: March 17, 2014 Permit type: Elec | Permit id: Ee19418 | |||||
At boiler room repairs. Remove all defective ceiling approx : 5 sq ft. P i new sheet rock ceiling and tin metal approx: sq ft. Re-secure loose m Date: April 16, 2014 Permit type: Gc | Permit id: Ee21482 |