Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 93 [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installing a 6. 16kw pv system on roof of home. 4/28/16 jcb; add 2 recepts, amp feeder. Date: March 31, 2016 Contractor: Solterra Systems Permit type: Electrical | Permit status: Permit closed | Completion date: May 3, 2016 | Expiration date: March 31, 2017 | Current use: Single family / duplex | Permit id: 6526898 | |||||
SCORE 96 [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installing a 6. 16kw pv system on roof of home. 4 28 16 jcb; add 2 recepts, amp feeder. Date: March 31, 2016 Contractor: Earl Childs Permit type: Electrical | Permit status: Permit closed | Completion date: May 3, 2016 | Expiration date: March 31, 2017 | Current use: Single family / duplex | Permit id: 6526898 |