Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 93 Roof mount residential solar pv for existing sfd (no meter upgrade). This permit does not exempt any existing structures from compliance with applicable building code and zoning ordinance requirements. Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: September 20, 2017 Contractor: Raneri And Long Roofing Company Inc Permit type: Addn | Permit status: Issued | Permit id: Pds2017-Resalt- | |||||
SCORE 91 Roof mount residential solar pv for existing sfd and new 200a msp upgrade (misc. Elec.) per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. 05-02-2017 scope change to match plans at the request of bi. Maz Date: November 28, 2016 Contractor: Raneri And Long Building Specialties Inc Permit type: Residential alteration-addn | Permit status: Completed | Completion date: May 3, 2017 | Permit id: Pds2016-Resalt- | |||||
- excavation permit Date: March 10, 2017 Permit status: Issued | Completion date: July 7, 2017 | Permit id: Dpw2017-Rwexcp- | |||||
Rough electric Date: April 18, 2017 Permit status: Cancel | Permit id: Pds2016-Resalt- | |||||
SCORE 93 Roof mount residential solar pv for existing sfd (no meter upgrade). This permit does not exempt any existing structures from compliance with applicable building code and zoning ordinance requirements. Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: September 20, 2017 Contractor: Raneri And Long Roofing Company Inc Permit type: Online | Permit status: Issued | Permit id: Pds2017-Resalt- | |||||
SCORE 91 Roof mount residential solar pv for existing sfd and new 200a msp upgrade (misc. Elec.) per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. 05-02-2017 scope change to match plans at the request of bi. Maz Date: November 28, 2016 Contractor: Raneri And Long Building Specialties Inc Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2016-Resalt- | Parcel: 2952305400 |