Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 96 Verizon fios. Excavate to intercept existing conduit and place split-y at pc1. Excavate to place 2- 4"pvc 28 from split-y to existing handhole location and encase in concrete. Place 1- 1. 25 innerduct from mh519 to hh f209. Excavate to break out of mh519 and place 2-4"pvc from mh519 to hh f138 and encase in concrete. Place 2-1. 25" innerduct from mh519 to hh f138. In accordance with the attached traffic control plans and job 1a0tf7u ![]() ![]() Permit type: Excavation; telecom ml conduits (trench) | Permit status: Issued | Expiration date: November 11, 2016 | Permit id: Pa181535 | |||||
SCORE 96 Excavation; telecom ml conduits (trench) ![]() ![]() Permit status: 8 | Expiration date: November 11, 2016 | Permit id: Pa181535 | |||||
SCORE 95 Construction staging area ![]() ![]() Permit status: Permit expired | Expiration date: October 5, 2016 | Permit id: Pa10331311 |