| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Relocation of sprinkler heads for new office fit-out.; no new heads added.; relocate (32) and remove (4) sprinkler heads.; upright heads will be installed during construction while existing ceiling is replaced.; sprinkler system will not be removed from service during construction. Permit status: Na | Permit id: Sprk73789 | |||||
Relocate (109) existing;sprinkler heads to new ceiling grid.; work to be done;one floor zone at at a time ;per nfpa stands. 7 cmr. Permit status: Na | Permit id: Sprk105669 | |||||
Removal of asbestos from preston bldg Permit status: Na | Permit id: Asb133197 | |||||
To remove asbestos from 732 harrison ave Permit status: Na | Permit id: Asb106267 | |||||
Renovations;for removal of suspended ceilings interior partitions floor tiles &; casework Permit status: Na | Permit id: Fdc49909 | |||||
Cutting &; welding;for renovations to include 8x8 hole &; 15-beam penetrations in an i-beam and the strengthening of plate above/below;beam; bfd paid detail required Permit status: Na | Permit id: Cbw32809 | |||||
Burning &; welding for installation of beam penetrations (dpl) bfd paid detail required Permit status: Na | Permit id: Cbw106365 | |||||
Cutting &; welding of (4) stub columns to build a frame of preston family bldg (dpl) bfd paid detail required Permit status: Na | Permit id: Cbw44635 | |||||
Remodel 2nd floor phase 1 sprinklers will remain active during construction.; pull stations &; a/vs will remain active.; ~; doc# 20111299 Permit status: Na | Permit id: Bfdf108273 | |||||
Bagging of smoke detectors Permit status: Na | Permit id: Bsd131732 | |||||
SCORE 88 Construction on 1st floor Permit status: Na | Permit id: Bsd49960 | |||||
Street occupancy Permit status: Expired | Permit id: Occu-188133 |