Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Interior, non-strucutural basement remodel to remove an existing adu in sfd. Scope includes removal of one kitchen sink (with plumbing capped behind drywall), removal of electric stove, and removal of refrigerator. This scope must fully convert the existing inchkitcheninch into a inchworkshopinch. Includes electrical and plumbing. Client: Randolph Mayer,Patricia Halloran | Applicant: One Call Construction | Permit type: Building, electrical | Permit status: Cmp | Completion date: March 9, 2015 | Current use: Single family d | |||||
SCORE 100 Interior, non-strucutural basement remodel to remove an existing adu in sfd. Scope includes removal of one kitchen sink (with plumbing capped behind drywall), removal of electric stove, and removal of refrigerator. This scope must fully convert the existing inchkitcheninch into a inchworkshopinch. Includes electrical and plumbing. Client: Randolph Mayer | Permit type: Building, electrical, plumbing | Permit status: Cmp | Completion date: March 9, 2015 | Current use: Single family detached dwelling, remodel | Permit id: Pmt2015-00727 |