Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 59 Remove existing loose gravel from roof surface, remove existing metal edge and replace all deterioated wood nailers, install new 2x6 wood nailers, mechanically attach new 1. 5" isocyanurate insulation through existing built up roof membrane and into gypsum decking and fully adhere a new mil tpo membrane to new insulation. Permit type: Commercial | Permit status: Create application | Permit id: Qcr-2013-01385 | |||||
SCORE 59 Remove existing loose gravel from roof surface, remove existing metal edge and replace all deterioated wood nailers, install new 2x6 wood nailers, mechanically attach new 1. 5" isocyanurate insulation through existing built up roof membrane and into gypsum decking and fully adhere a new mil tpo membrane to new insulation. (non structural) Permit type: Alteration | Permit status: Issued | Permit id: Bb-201303761 |