Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 93 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: June 6, 2015 Contractor: Leo Bautista Permit type: Electrical : 8002 - | Permit status: Permit issued | Permit id: Pds2015-Resalt- | |||||
SCORE 89 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. 8/14/15 - plan change - pv p anel layout change; add a/c disconnect and monitoring... Djm 7/9/15-plan change. Increased panels/ inverters and module types changed. Kp Date: June 6, 2015 Contractor: Smart Energy Solar Inc Permit type: Residential alteration-addn | Permit status: Completed | Completion date: September 22, 2015 | Permit id: Pds2015-Resalt- | |||||
Final Date: September 22, 2015 Permit status: Pass | Permit id: Pds2015-Resalt- | |||||
Pool/steel bond Date: August 10, 2005 Permit status: Pass | Permit id: Pds2005-1023-20 | |||||
Final Date: January 25, 2006 Permit status: Pass | Permit id: Pds2005-1023-20 |