Proposed work consist on drilling 14 soil borings 3. 25 inches diameter by a depth of five feet and one vapor point will be advanced to five feet in depth and will not puncture the aquifer, which is located at approximately eleven feet in depth . The soil borings for soil sampling will puncture the equifer. Bentonite cement grout (60:40), grout: water ratio (30:70), as per site plan, work plans report, dc well construction/schematic application and documents. Client: T-Court Investments, Llc T-Court Investments, Llc | Permit type: Excavation; boring t | Permit id: Pa115747 | |||||
SCORE 62 Work within dcdot row will include use of 1" and 2" hose to extract and inject from existing groundwater monitoring wells at a gas station remediation site. Hoses will be temporarily staged across 6-wide sidewalk within one location and under walkover ramp. Sidewalk pedestrians will be rerouted to use other side. Temporary sidewalk closure only. No work within actual street. Work to require +/- 6 hours of sidewalk crossing. This construction permit requires a separate occupancy permit. The attached plans and conditions are a part of this permit. If steel plates are used at this job site an additional permit is needed. Client: T-Court Investments, Llc T-Court Investments, Llc | Permit type: Excavation; monitoring/telemetric equipment | Permit status: Permit expired | Expiration date: December 10, 2012 | Permit id: Pa73778 | |||||
SCORE 62 Injection of dcdoe-approved chemical oxidation materials into groundwater monitoring wells as part of a petroleum-impacted groundwater remediation project at the subject site along the north side and right-of-way/public space of tuckerman street, nw (proximate to the subject site). Injection process will start with extraction of groundwater from the same wells using 2"-diameter vacuum hose, followed by injection of chemicals using 1"-diameter chemical hose. The hoses will be laid across grade and sidewalk and under temporary walkovers to allow pedestrian traffic, along with precautionary signage warning of work area. All work to be performed during normal business hours. No excavation will be created - only temporary laying of hoses in public space extending to existing groundwater monitoring wells that were constructed in the same public space under previous permit(s). All trucks and equipment will be maintained on private property. Client: T-Court Investments, Llc T-Court Investments, Llc | Permit type: Excavation; monitoring/telemetric equipment | Permit status: Permit expired | Expiration date: June 27, 2013 | Permit id: Pa81283 | |||||
SCORE 56 Proposed work consist on drilling 14 soil borings 3. 25 inches diameter by a depth of five feet and one vapor point will be advanced to five feet in depth and will not puncture the aquifer, which is located at approximately eleven feet in depth . The soil borings for soil sampling will puncture the equifer. Bentonite cement grout (60:40), grout: water ratio (30:70), as per site plan, work plans report, dc well construction/schematic application and documents. Permit type: Excavation; boring test pit (each addl), excavation; boring test pit (single) | Permit status: Permit expired | Expiration date: December 13, 2015 | Permit id: Pa115747 | |||||
SCORE 63 Advance 28 soil borings in the roadway and sidewalk of georgia avenue, tuckerman street and piney branch road n. W as part of environmental assessment and remediation. 19 of 28 borings will be advanced to 19 ft depth via georobe hollow stem auger, 6" diameter, and will have 2" diameter pvc wells installed. 9 of 28 borings are for soil assessment only, geoprobe direct push, 2" diameter 25 ft depth Permit type: Excavation; boring test pit (single) | Permit status: Assigned | Expiration date: April 27, 2017 | |||||
SCORE 66 Construction staging area Permit status: Notpaid | Expiration date: May 22, 2017 | Permit id: 0 | |||||
SCORE 66 Construction staging area Permit status: Not paid | Expiration date: May 22, 2017 | Permit id: 0 | |||||
SCORE 65 Work within dcdot row will include use of 1" and 2" hose to extract and inject from existing groundwater monitoring wells at a gas station remediation site. Hoses will be temporarily staged across 6-wide sidewalk within one location and under walkover ramp. Sidewalk pedestrians will be rerouted to use other side. Temporary sidewalk closure only. No work within actual street. Work to require + - 6 hours of sidewalk crossing. This construction permit requires a separate occupancy permit. The attached plans and conditions are a part of this permit. If steel plates are used at this job site an additional permit is needed. Client: T-Court Investments, Llc T-Court Investments, Llc | Permit type: Excavation; monitoring/telemetric equipment | Permit status: Permit expired | Expiration date: December 10, 2012 | Permit id: Pa73778 | |||||
SCORE 66 Construction staging area Permit status: Notpaid | Expiration date: May 22, 2017 | Permit id: 0 | |||||
SCORE 65 Work within dcdot row will include use of 1" and 2" hose to extract and inject from existing groundwater monitoring wells at a gas station remediation site. Hoses will be temporarily staged across 6-wide sidewalk within one location and under walkover ramp. Sidewalk pedestrians will be rerouted to use other side. Temporary sidewalk closure only. No work within actual street. Work to require + - 6 hours of sidewalk crossing. This construction permit requires a separate occupancy permit. The attached plans and conditions are a part of this permit. If steel plates are used at this job site an additional permit is needed. Client: T-Court Investments, Llc T-Court Investments, Llc | Permit type: Excavation; monitoring/telemetric equipment | Permit status: Permit expired | Expiration date: December 10, 2012 | Permit id: Pa73778 | |||||
SCORE 65 Injection of dcdoe-approved chemical oxidation materials into groundwater monitoring wells as part of a petroleum-impacted groundwater remediation project at the subject site along the north side and right-of-way public space of tuckerman street, nw (proximate to the subject site). Injection process will start with extraction of groundwater from the same wells using 2"-diameter vacuum hose, followed by injection of chemicals using 1"-diameter chemical hose. The hoses will be laid across grade and sidewalk and under temporary walkovers to allow pedestrian traffic, along with precautionary signage warning of work area. All work to be performed during normal business hours. No excavation will be created - only temporary laying of hoses in public space extending to existing groundwater monitoring wells that were constructed in the same public space under previous permit(s). All trucks and equipment will be maintained on private property. Client: T-Court Investments, Llc T-Court Investments, Llc | Permit type: Excavation; monitoring/telemetric equipment | Permit status: Permit expired | Expiration date: June 27, 2013 | Permit id: Pa81283 | |||||
SCORE 63 Proposed work consist on drilling 14 soil borings 3. 25 inches diameter by a depth of five feet and one vapor point will be advanced to five feet in depth and will not puncture the aquifer, which is located at approximately eleven feet in depth . The soil borings for soil sampling will puncture the equifer. Bentonite cement grout (60:40), grout: water ratio (30:70), as per site plan, work plans report, dc well construction schematic application and documents. Permit type: Excavation; boring test pit (each addl), excavation; boring test pit (single) | Permit status: Permit expired | Expiration date: December 13, 2015 | Permit id: Pa115747 | |||||
SCORE 63 Advance 28 soil borings in the roadway and sidewalk of georgia avenue, tuckerman street and piney branch road n. W as part of environmental assessment and remediation. 19 of 28 borings will be advanced to 19 ft depth via georobe hollow stem auger, 6" diameter, and will have 2" diameter pvc wells installed. 9 of 28 borings are for soil assessment only, geoprobe direct push, 2" diameter 25 ft depth Permit type: Excavation; boring test pit (single) | Permit status: Permit expired | Expiration date: April 21, 2017 | Permit id: Pa199455 | |||||
SCORE 74 Other reserved parking Permit status: Permit expired | Expiration date: May 16, 2014 | Permit id: Pa10138950 | |||||
SCORE 66 Construction staging area Permit status: Not paid | Expiration date: May 22, 2017 | Permit id: 0 | |||||
SCORE 66 Construction staging area Permit status: Permit expired | Expiration date: March 31, 2017 | Permit id: Pa10377831 |