Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 93 [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] install 9. 9 kw solar system on roof. Date: July 28, 2014 Contractor: Solterra Systems Permit type: Electrical | Permit status: Permit closed | Completion date: September 9, 2014 | Expiration date: July 28, 2015 | Current use: Single family / duplex | Permit id: 6429224 | |||||
SCORE 84 Install 16/17kw generator Date: September 14, 2016 Contractor: Washington Energy Svcs Co Llc Permit type: Electrical | Permit status: Permit issued | Completion date: November 22, 2016 | Expiration date: September 14, 2017 | Current use: Single family / duplex | Permit id: 6556420 | |||||
SCORE 84 11 16 2016 - cancelled customer log #16-1714 electrical for generator . Contractor - washington energy service washies851ns expiry 9 7 2017. Pr 10 20 16: add (1) 30-50amp 208-4 volts feeder. Date: October 18, 2016 Contractor: Washington Energy Svcs Co Llc Permit type: Electrical | Permit status: Permit issued | Expiration date: October 18, 2017 | Current use: Single family / duplex | Permit id: 6562459 |