Building Permits at 631 Howard Road Se Washington DC


Estimated Price

Beds

Baths

Rooms

Sq.Ft.

Built:   Lot size:   Taxed:
RENOVATION HISTORY
Based on the information received from building department, associated with 631 Howard Road Se Washington DC over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
SCORE
93
Dc water is proposing a temporary stabilized construction entrance at howard road, se, directly nothwest of wmatas anacostia metro parking garage entrance/exit. This temporary construction entrance will provide dc water with access to the cso 005 jobsite, associated with the dc clean rivers anacostia river tunnel.
Date:  October 31, 2011
Contractor: Justin Donnelly

Permit type: Paving; curb & gutter(s) | Permit status: Cancel/withdrawn | Expiration date: June 1, 2018
2011/10/31093822 Howard Road Se Washington DcJustin Donnelly
SCORE
93
Dc water is proposing a temporary stabilized construction entrance at howard road, se, directly nothwest of wmatas anacostia metro parking garage entrance exit. This temporary construction entrance will provide dc water with access to the cso 005 jobsite, associated with the dc clean rivers anacostia river tunnel.
Date:  October 31, 2011
Contractor: Justin Donnelly

Permit type: Paving; curb & gutter(s) | Permit status: Cancel/withdrawn | Expiration date: June 1, 2018
2011/10/31093822 Howard Road Se Washington DcJustin Donnelly
SCORE
93
Other work related occupancy
Contractor: Justin Donnelly

Permit status: Rejected | Expiration date: June 12, 2012 | Permit id: 0
093822 Howard Road Se Washington DcJustin Donnelly
SCORE
93
Paving; curb & gutter(s)
Contractor: Justin Donnelly

Permit status: 3 | Expiration date: June 1, 2018 | Permit id: 0
093822 Howard Road Se Washington DcJustin Donnelly
SCORE
93
Dc water is proposing a temporary stabilized construction entrance at howard road, se, directly nothwest of wmatas anacostia metro parking garage entrance exit. This temporary construction entrance will provide dc water with access to the cso 005 jobsite, associated with the dc clean rivers anacostia river tunnel.
Contractor: Justin Donnelly

Permit status: Cancel/withdrawn | Expiration date: June 1, 2018 | Permit id: 0
093822 Howard Road Se Washington DcJustin Donnelly
SCORE
95
Permit 759852, wr 3203410. 4x5 cut in the sidewalk of howard road s. E for gas service abandonment.
Date:  July 11, 2017

Permit type: Excavation; repair gas service (excavation) | Permit status: Approved (pending payment | Expiration date: November 30, 2017 | Permit id: 0
2017/07/11095822 Howard Road Se Washington DcWash Gas And Light Co
SCORE
93
Paving; curb & gutter(s)
Contractor: Justin Donnelly

Permit status: 3 | Expiration date: June 1, 2018 | Permit id: 0
093822 Howard Road Se Washington DcJustin Donnelly
SCORE
95
Excavation; repair gas service (excavation)

Permit status: 1 | Expiration date: November 30, 2017 | Permit id: 0
095822 Howard Road Se Washington DcWash Gas And Light Co
SCORE
93
Other work related occupancy
Contractor: Justin Donnelly

Permit status: Rejected | Expiration date: June 12, 2012 | Permit id: 0
093822 Howard Road Se Washington DcJustin Donnelly
SCORE
93
Dc water is proposing a temporary stabilized construction entrance at howard road, se, directly nothwest of wmatas anacostia metro parking garage entrance exit. This temporary construction entrance will provide dc water with access to the cso 005 jobsite, associated with the dc clean rivers anacostia river tunnel.
Contractor: Justin Donnelly

Permit status: Cancel/withdrawn | Expiration date: June 1, 2018 | Permit id: 0
093822 Howard Road Se Washington DcJustin Donnelly
SCORE
95
Permit 759852, wr 3203410. 4x5 cut in the sidewalk of howard road s. E for gas service abandonment.

Permit status: Approved (pending payment | Expiration date: November 30, 2017 | Permit id: 0
095822 Howard Road Se Washington DcWash Gas And Light Co
SCORE
95
Install 65 of wire and miscellaneous equipment, in front of 631 howard road, se, to provide service to a commercial building as indicated approved prints. Wr #3343737; tcp #1; stephen park/202-388-2573/sjpark@pepco. Com (racm/grb). Must adhere to attached typical/tcp. Must adhere to additonal conditions as attached and reviewed/approved by ali zamani of streetlight/ipma within permit office.
Date:  August 24, 2011

Client: Pepco | Permit type: Over head work; string electrical wire | Permit status: Permit expired | Expiration date: March 23, 2012 | Permit id: Pa65183
2011/08/24095631 Howard Road Se Washington DcPepco Phi Holdings Inc
Dccr proposes to drill one geotechnical boring, ppc-20, located southwest of 631 howard st. Se. In the median between east and west suitland parkway se and northbound south capitol st. Se. The boring will be approximately 6 inches diameter and feet deep. The work will take up to two weeks to complete and will require 24/7 occupancy of the workspace as well as extrended work hours 7am-7pm. Pedestrians, trees and parking meters will not be impacted.
Date:  April 16, 2013

Client: Dc Water | Permit type: Excavation; boring test pit (single) | Permit status: Permit expired | Expiration date: November 30, 2013 | Permit id: Pa81602
2013/04/16095631 Howard Road Se Washington Dc
Dccr proposes to drill two geotechnical borings, ppc-23 and ppc-24, located southwest of 631 howard st. Se. One boring is located in the greenspace between suitland parkway se north of south capitol st. Se. The second boring is located in the greenspace between south capitol st se and the ramp to i-295 southbound. The borings will be approximately 6 inches diameter and feet deep. The work will take up to two weeks to complete and will require 24/7 occupancy of the workspace as well as extrended work hours 7am-7pm. Traffic, pedestrians, trees and parking meters will not be impacted.
Date:  June 19, 2013

Client: Dc Water | Permit type: Excavation; boring test pit (each addl), excavation; boring test pit (single) | Permit status: Permit expired | Expiration date: January 1, 2014 | Permit id: Pa83935
2013/06/19095631 Howard Road Se Washington Dc
SCORE
95
Provide service (65; of wire) to 631 howard road, s. E. (southeast corner) from existing pole # 799375-616 as indicated on the attached prints. Use of typical number one. Wr #53343737 1 calendar days
Date:  December 13, 2010
Contractor: Pepco

Permit type: Over head work; string telecom wire/fiber | Permit status: Permit expired | Expiration date: April 14, 2011 | Permit id: Pa59071
2010/12/13095631 Howard Road Se Washington DcPepco
SCORE
95
Install (1) pole. Remove and install 234 ft of oh wire at 631 howard rd se, east of suitland pky se, as indicated on attached prints. Wr# 35168 - kdantzler - dac
Date:  July 19, 2016
Contractor: Pepco Holdings Inc

Permit type: Over head work; pole installation (single or first one), over head work; string electrical wire | Permit status: Assigned | Expiration date: February 20, 2017
2016/07/19095631 Howard Road Se Washington DcPepco Holdings Inc
SCORE
95
Install 65 of wire and miscellaneous equipment, in front of 631 howard road, se, to provide service to a commercial building as indicated approved prints. Wr #3343737; tcp #1; stephen park 202-388-2573 sjpark@pepco. Com (racm grb). Must adhere to attached typical tcp. Must adhere to additonal conditions as attached and reviewed approved by ali zamani of streetlight ipma within permit office.
Date:  August 24, 2011

Client: Pepco | Permit type: Over head work; string electrical wire | Permit status: Permit expired | Expiration date: March 23, 2012 | Permit id: Pa65183
2011/08/24095631 Howard Road Se Washington DcPepco Phi Holdings, Inc
SCORE
95
Over head work; string telecom wire fiber
Date:  December 14, 2010
Contractor: Pepco

Permit status: 8 | Expiration date: April 14, 2011 | Permit id: Pa59071
2010/12/14095631 Howard Road Se Washington DcPepco
SCORE
100
Construction staging area
Contractor: Dcwater Cip

Permit status: Notpaid | Expiration date: September 19, 2011 | Permit id: 0
0100631 Howard Road Se Washington DcDcwater Cip
SCORE
99
Construction staging area
Date:  July 3, 2013
Contractor: E2cr C O Siva Balu

Permit status: Expired | Expiration date: August 5, 2013 | Permit id: Pa10103521
2013/07/03099631 Howard Road Se Washington DcE2cr C O Siva Balu
SCORE
95
Over head work; pole installation (single or first one), over head work; string electrical wire
Date:  August 31, 2016
Contractor: Pepco Holdings Inc

Permit status: 8 | Expiration date: March 4, 2017 | Permit id: Pa180769
2016/08/31095631 Howard Road Se Washington DcPepco Holdings Inc
SCORE
95
Over head work; string electrical wire
Date:  August 29, 2011

Permit status: 8 | Expiration date: March 23, 2012 | Permit id: Pa65183
2011/08/29095631 Howard Road Se Washington DcPepco Phi Holdings, Inc
SCORE
82
Construction staging area
Contractor: Bohler Dc

Permit status: Resubmit | Expiration date: November 4, 2017 | Permit id: 0
082631 Howard Road Se Washington DcBohler Dc
SCORE
82
Construction staging area
Contractor: Bohler Dc

Permit status: Resubmit | Expiration date: November 4, 2017 | Permit id: 0
082631 Howard Road Se Washington DcBohler Dc
SCORE
95
Place 1 verizon pole on howard road se between suitland parkway se and anacostia drive se as shown on job 6a02764, see attached drawings for detail. 1 days for permit. Agent tim outsa
Date:  July 19, 2011
Contractor: Verizon

Permit type: Over head work; pole installation (single or first one) | Permit status: Permit expired | Expiration date: January 26, 2012 | Permit id: Pa64224
2011/07/19095631 Howard Road Se Washington DcVerizon
SCORE
100
Construction staging area
Contractor: Dcwater Cip

Permit status: Notpaid | Expiration date: September 19, 2011 | Permit id: 0
0100631 Howard Road Se Washington DcDcwater Cip
SCORE
82
Construction staging area
Contractor: Bohler Dc

Permit status: Resubmit | Expiration date: November 4, 2017 | Permit id: 0
082631 Howard Road Se Washington DcBohler Dc
SCORE
100
Dccr proposes to drill one geotechnical boring, ppc-20, located southwest of 631 howard st. Se. In the median between east and west suitland parkway se and northbound south capitol st. Se. The boring will be approximately 6 inches diameter and feet deep. The work will take up to two weeks to complete and will require 24 7 occupancy of the workspace as well as extrended work hours 7am-7pm. Pedestrians, trees and parking meters will not be impacted.
Date:  April 16, 2013
Contractor: E2cr Inc

Client: Dc Water | Permit type: Excavation; boring test pit (single) | Permit status: Permit expired | Expiration date: November 30, 2013 | Permit id: Pa81602
2013/04/160100631 Howard Road Se Washington DcE2cr Inc
SCORE
100
Dccr proposes to drill two geotechnical borings, ppc-23 and ppc-24, located southwest of 631 howard st. Se. One boring is located in the greenspace between suitland parkway se north of south capitol st. Se. The second boring is located in the greenspace between south capitol st se and the ramp to i-295 southbound. The borings will be approximately 6 inches diameter and feet deep. The work will take up to two weeks to complete and will require 24 7 occupancy of the workspace as well as extrended work hours 7am-7pm. Traffic, pedestrians, trees and parking meters will not be impacted.
Date:  June 19, 2013
Contractor: E2cr Inc

Client: Dc Water | Permit type: Excavation; boring test pit (each addl), excavation; boring test pit (single) | Permit status: Permit expired | Expiration date: January 1, 2014 | Permit id: Pa83935
2013/06/190100631 Howard Road Se Washington DcE2cr Inc
SCORE
99
Construction staging area
Date:  May 20, 2013
Contractor: E2cr C O Siva Balu

Permit status: Permit expired | Expiration date: June 13, 2013 | Permit id: Pa10097063
2013/05/20099631 Howard Road Se Washington DcE2cr C O Siva Balu
SCORE
82
Construction staging area
Contractor: Bohler Dc

Permit status: Resubmit | Expiration date: November 4, 2017 | Permit id: 0
082631 Howard Road Se Washington DcBohler Dc
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.