Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 86 Repairreplace countertops, cabinets, ceramic tiles, carpet and hardwood floors. Permit type: Permit - easy permit | Permit id: 100100891 | |||||
SCORE 96 Erect one werner scaffold from 07 09 2007 - 07 09 2008 for exterior critical exam. Permit type: Permit - scaffolding | Permit id: 100188046 | |||||
SCORE 61 Interior remodel of unit 2705. Adding new partition walls, replacing plumbing fixtures, adding additional outlets and light switches. Permit type: Permit - renovation/ | Permit id: 100250096 | |||||
SCORE 100 Erect 1 swing stage by werner scaffold from 10-12-09 to 10-12-10 Date: October 13, 2009 Contractor: Central Building And Presrv. L.P Permit type: Permit - scaffolding | Permit id: 100314982 | |||||
SCORE 100 Replace-retrofit existing fluorescent light fixtures from t12 to t8 Permit type: Permit - electric wi | Permit id: 100431890 | |||||
SCORE 100 Erect (4) hi-low modular werner board scaffolds from 6-18-12 to 6-18-13 Permit type: Permit - scaffolding | Permit id: 100444854 | |||||
SCORE 56 All elevations, repairpatch 4150 sq. Ft. Concrete, 6000 sq. Ft. Balcony re-leveling (concrete), 1150 sq. Ft. Caulk concrete cracks, 750 ln. Ft. Caulking, 500 sq. Ft. Tuckpointing, repairreplace 100 sq. Ft. Eifs, install membrane coating to all balconies and paint coating all concrete patches only. Permit type: Permit - easy permit | Permit id: 100446808 | |||||
SCORE 95 Replace outlets and fixtures in unit 1009 bathroom. Permit type: Permit - electric wi | Permit id: 100492951 |