Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Plumbing permit Date: November 1, 2012 Client: Arden Theatre Company | Permit status: Completed | Permit id: 433758 | |||||
Sign permit Date: October 16, 2013 Client: Arden Theatre Company | Permit status: Completed | Permit id: 498772 | |||||
Alteration permit Date: March 2, 2016 Client: Arden Theatre Company | Permit status: Active | Permit id: 673479 | |||||
Alteration permit Date: July 3, 2012 Client: Arden Theatre Company | Permit status: Completed | Permit id: 410614 | |||||
Electrical permit Date: November 9, 2012 Client: Arden Theatre Company | Permit status: Completed | Permit id: 432749 | |||||
Mechanical permit Date: December 6, 2012 Client: Arden Theatre Company | Permit status: Completed | Permit id: 433077 | |||||
Suppression permit Date: January 4, 2013 Client: Arden Theatre Company | Permit status: Completed | Permit id: 440736 | |||||
Administrative permit Date: March 19, 2012 Client: Arden Theatre Company | Permit status: Completed | Permit id: 385550 | |||||
Zoning/use permit Date: September 27, 2013 Client: Arden Theatre Company | Permit status: Completed | Permit id: 494294 | |||||
Zoning/use permit Date: April 4, 2012 Client: Arden Theatre Company | Permit status: Completed | Permit id: 397045 | |||||
Use permit Date: March 23, 2012 Client: Arden Theatre Company | Permit status: Completed | Permit id: 362173 | |||||
Permit for use as a drama school with theatre plays for parents and teachers all in an existing three story structure. Date: October 26, 2011 Client: Arden Theatre Company | Applicant: Thomas E. Butler, Jr., Esquire | Permit type: Appeal | Permit status: Granted | Completion date: December 13, 2011 | Permit id: 16454 | |||||
Permit for the erection of three (3) story addition with a roof deck less than 12 inches above grade with a 42 inch high protective railing, over existing two (2) story structure (5 stories total) overall height 64ft. For the erection of five (5) story addition over existing 2 story structure (7 stories total) (overall height 84 ft. 2 inches with elevator/stair tower, for a rear one (1) story addition max height 19ft-all for use as 27 dwelling untis floros 2 thru 6 and a vacant commercial space on the first floor as permitted in the district and old city residential controls (use registration required prior to occupancy), for balconies at 3rd., 4th, 5th and 6th floors (all decks/balconies with 42 inch protective railing) for acc parking in the cellar for 15 v3ehicles and 4 open air parking spaces in the rear (total 19 paring spaces) including 1 handicap space for a skylight @ roof of 2nd. Story. Date: September 13, 2007 Client: Arden Theatre Company | Applicant: " Do Not Use " Brett Feldman, Esq. | Permit type: Appeal | Permit status: Granted | Permit id: 3210 | |||||
Sign permit Date: October 16, 2013 Client: Arden Theatre Company | Permit status: Completed | Permit id: 498772 | |||||
Suppression permit Date: January 4, 2013 Client: Arden Theatre Company | Permit status: Completed | Permit id: 440736 | |||||
Mechanical permit Date: December 6, 2012 Client: Arden Theatre Company | Permit status: Completed | Permit id: 433077 | |||||
Alteration permit Date: March 2, 2016 Client: Arden Theatre Company | Permit status: Completed | Permit id: 673477 | |||||
Administrative permit Date: March 19, 2012 Client: Arden Theatre Company | Permit status: Completed | Permit id: 385550 | |||||
Zoning use permit Date: September 27, 2013 Client: Arden Theatre Company | Permit status: Completed | Permit id: 494294 | |||||
Alteration permit Date: July 3, 2012 Client: Arden Theatre Company | Permit status: Completed | Permit id: 410614 | |||||
Electrical permit Date: November 9, 2012 Client: Arden Theatre Company | Permit status: Completed | Permit id: 432749 | |||||
Plumbing permit Date: November 1, 2012 Client: Arden Theatre Company | Permit status: Completed | Permit id: 433758 | |||||
Use permit Date: March 23, 2012 Client: Arden Theatre Company | Permit status: Completed | Permit id: 362173 | |||||
Zoning use permit Date: April 4, 2012 Client: Arden Theatre Company | Permit status: Completed | Permit id: 397045 | |||||
Permit for use as a drama school with theatre plays for parents and teachers all in an existing three story structure. Date: October 26, 2011 Client: Arden Theatre Company | Applicant: Thomas E. Butler, Jr., Esquire | Permit type: Appeal | Permit status: Granted | Completion date: December 13, 2011 | Permit id: 16454 | |||||
Permit for the erection of three (3) story addition with a roof deck less than 12 inches above grade with a 42 inch high protective railing, over existing two (2) story structure (5 stories total) overall height 64ft. For the erection of five (5) story addition over existing 2 story structure (7 stories total) (overall height 84 ft. 2 inches with elevator stair tower, for a rear one (1) story addition max height 19ft-all for use as 27 dwelling untis floros 2 thru 6 and a vacant commercial space on the first floor as permitted in the district and old city residential controls (use registration required prior to occupancy), for balconies at 3rd., 4th, 5th and 6th floors (all decks balconies with 42 inch protective railing) for acc parking in the cellar for 15 v3ehicles and 4 open air parking spaces in the rear (total 19 paring spaces) including 1 handicap space for a skylight @ roof of 2nd. Story. Date: September 13, 2007 Client: Arden Theatre Company | Applicant: " Do Not Use " Brett Feldman, Esq. | Permit type: Appeal | Permit status: Granted | Permit id: 3210 | |||||
Install a complete hvac system in existing 3 story structure as per plans Date: December 6, 2012 Client: Arden Theatre Company | Permit type: Mechanical permit | Permit status: Completed | Completion date: June 4, 2013 | Permit id: 433077 | |||||
SCORE 100 Install entire new plumbing system for 3 story bldg basement and 2 floors (theater) Date: November 1, 2012 Contractor: Lgb Mechanical Inc Client: Arden Theatre Company | Permit type: Plumbing permit | Permit status: Completed | Completion date: May 28, 2013 | Permit id: 433758 | |||||
SCORE 93 Install new fire suppression system in accordance with nfpa 13 throughout the entire building. All work shall comply with the approved plans. All work shall be performed by a fire suppression contractor licensed by the city of philadelphia. Date: January 4, 2013 Contractor: Big Easy Fire Protection Client: Arden Theatre Company | Permit type: Suppression permit | Permit status: Completed | Completion date: June 4, 2013 | Permit id: 440736 | |||||
Signage work includes installtion of 15 satin steel letters, 1 paointef steel channel and 1 water jet cut painted metal plate sign mounted to the property existing masonry building front. Date: September 27, 2013 Client: Arden Theatre Company | Permit type: Zoning/use permit | Permit status: Completed | Completion date: September 27, 2013 | Permit id: 494294 | |||||
SCORE 100 Repair stucco to match original as per historic apprvoal Date: March 2, 2016 Contractor: Wm.Proud Masonry Restoration Client: Arden Theatre Company | Permit type: Alteration permit | Permit status: Completed | Completion date: May 2, 2016 | Permit id: 673477 | |||||
SCORE 100 Shelter platform permit- erection of a sidewalk shelter platform as per engineered plans. Streets department permit required for sidewalk closure prior to the start of work Date: March 2, 2016 Contractor: Wm.Proud Masonry Restoration Client: Arden Theatre Company | Permit type: Alteration permit | Permit status: Completed | Completion date: April 3, 2017 | Permit id: 673479 | |||||
Installation of 15 satin stainless steel letters, one painted steel channel and one water jet cut painted metal plate sign mounted to the propertys existing masonry buildling front total signage area is 124 sf Date: October 16, 2013 Client: Arden Theatre Company | Permit type: Sign permit | Permit status: Completed | Completion date: May 14, 2014 | Permit id: 498772 | |||||
Prelim for fitout of existing bldg as per plans-drama school Date: March 19, 2012 Client: Arden Theatre Company | Permit type: Administrative permit | Permit status: Completed | Completion date: March 19, 2012 | Permit id: 385550 | |||||
Zoning use change Date: March 23, 2012 Client: Arden Theatre Company | Permit type: Use permit | Permit status: Completed | Completion date: March 23, 2012 | Permit id: 362173 | |||||
Erection of rooftop air units Date: April 4, 2012 Client: Arden Theatre Company | Permit type: Zoning/use permit | Permit status: Completed | Completion date: April 4, 2012 | Permit id: 397045 | |||||
Fitout for existing bldg as per plan. Date: July 3, 2012 Client: Arden Theatre Company | Permit type: Alteration permit | Permit status: Completed | Completion date: May 30, 2013 | Permit id: 410614 | |||||
SCORE 100 Install new 2000amp service, 6 new panels, 324 new light fixtures and 166 new receptacles per 2008 nec (commercial) Date: November 9, 2012 Contractor: Joule Electric Inc Client: Arden Theatre Company | Permit type: Electrical permit | Permit status: Completed | Completion date: July 20, 2013 | Permit id: 432749 |