Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 89 Commercial plumbing Date: October 10, 2013 Contractor: Joseph Perry Permit status: Issued | Permit id: Plb-13-07072 | |||||
SCORE 95 Whole building fire sprinkler system (frame shop & bar) Date: March 7, 2014 Contractor: Brian Marinus Permit type: Fire sprinkler/chemical/control systems | Permit status: Issued | Permit id: Mec-14-01000 | |||||
SCORE 88 Picture frame shops Permit type: Plans required - commercial remodel existing space | Permit status: Issued | Permit id: Bld-13-10264 | |||||
SCORE 89 Water cut-off Date: December 23, 2013 Contractor: Joseph Perry Permit type: Commercial plumbing | Permit status: Issued | Permit id: Plb-13-08627 | |||||
SCORE 100 New 200a overhead service Date: November 20, 2012 Contractor: Shane Geise Permit type: Commercial electrical | Permit status: Issued | Permit id: Elc-12-11107 | |||||
SCORE 86 Service repair Date: October 14, 2015 Contractor: Eric Hoge Permit type: Commercial electrical | Permit status: Issued | Permit id: Elc-15-09176 | |||||
Main level is a picture frame shop and lower level is a bar Date: February 18, 2014 Permit type: Commercial electrical | Permit status: Issued | Permit id: Elc-14-01473 | |||||
SCORE 97 The frame shop 2)furnaes 75000btu a/c unit 4ton, hp 3ton ductwork. 2/24/14-per tj reinspec fee due. 3/3/14-fee pd Date: January 30, 2014 Contractor: David Harmon Permit type: Commercial air conditioning air distribution systems | Permit status: Issued | Permit id: Mec-14-00842 | |||||
SCORE 88 Cocktail lounge - basement only Permit type: Plans required - commercial remodel existing space | Permit status: Issued | Permit id: Bld-13-19025 |