Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Plumbing permit Client: Maiorano Dennis Maiorano Dianna Lynn | Permit status: Completed | Permit id: 612884 | |||||
Mechanical permit Client: Maiorano Dennis Maiorano Dianna Lynn | Permit status: Completed | Permit id: 606594 | |||||
Electrical permit Client: Maiorano Dennis Maiorano Dianna Lynn | Permit status: Completed | Permit id: 610175 | |||||
Suppression permit Client: Maiorano Dennis Maiorano Dianna Lynn | Permit status: Completed | Permit id: 604529 | |||||
Zoning use permit Client: Maiorano Dennis Maiorano Dianna Lynn | Permit status: Completed | Permit id: 590006 | |||||
New construction permit Client: Maiorano Dennis Maiorano Dianna Lynn | Permit status: Completed | Permit id: 590030 | |||||
SCORE 100 Install all sanitary drains and water supply to all fixtures. Install 1 kitchen sink,3 lavs,3 wc,2 showers,1 tub,1 washer machine and 1 hwh (sfd)the installation will comply with the philadelphia plumbing code 2004 Client: Maiorano Dennis Maiorano Dianna Lynn | Permit type: Plumbing permit | Permit status: Completed | Completion date: October 27, 2015 | Permit id: 612769 | |||||
SCORE 100 Install 5" lateral,curb trap,fai and water service pa20151390005(sfd)self certifications are no longer permitted","all excavations and plumbing trenches in excess of 5 ft in depth must have approved shoring in place at the time of inspection" Client: Maiorano Dennis Maiorano Dianna Lynn | Permit type: Plumbing permit | Permit status: Completed | Completion date: September 16, 2015 | Permit id: 612884 | |||||
For the erection of an attached structure with a roof deck and pilot house (for roof access only). Size and location as shown on plans application. For use as single family household living. Client: Maiorano Dennis Maiorano Dianna Lynn | Permit type: Zoning/use permit | Permit status: Completed | Completion date: February 23, 2015 | Permit id: 590006 | |||||
For the erection of a three story structure with cellar; 2nd and 3rd floor front bays and roof feck over three story for use as a sfd. Client: Maiorano Dennis Maiorano Dianna Lynn | Permit type: New construction permit | Permit status: Completed | Completion date: October 27, 2015 | Permit id: 590030 | |||||
SCORE 100 Installation of residential fire suppression system in accordance with nfpa 13-d throughout a three (3) story attached structure with basement and pilot house for roof deck access. This is a multi-purpose system utilizing a combined one inch (1") domestic and fire service line. Separate permit required for all plumbing work. Client: Maiorano Dennis Maiorano Dianna Lynn | Permit type: Suppression permit | Permit status: Completed | Completion date: October 27, 2015 | Permit id: 604529 | |||||
SCORE 100 Complet hvac system with duct work 90,000. Btu heater 90% with 3 ton a c Client: Maiorano Dennis Maiorano Dianna Lynn | Permit type: Mechanical permit | Permit status: Completed | Completion date: October 27, 2015 | Permit id: 606594 | |||||
SCORE 89 200amp service & wiring throughout install switches, receptacles & lights as per nec 2008 south district Client: Maiorano Dennis Maiorano Dianna Lynn | Permit type: Electrical permit | Permit status: Completed | Completion date: November 4, 2015 | Permit id: 610175 |