Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Alteration permit Client: Willner Adam Willner Cheri | Permit status: Completed | Permit id: 310193 | |||||
Plumbing permit Client: Willner Adam Willner Cheri | Permit status: Completed | Permit id: 328641 | |||||
Electrical permit Client: Willner Adam Willner Cheri | Permit status: Completed | Permit id: 327567 | |||||
Electrical permit Client: Willner Adam Willner Cheri | Permit status: Completed | Permit id: 327567 | |||||
Alteration permit Client: Willner Adam Willner Cheri | Permit status: Completed | Permit id: 310193 | |||||
Plumbing permit Client: Willner Adam Willner Cheri | Permit status: Completed | Permit id: 328641 | |||||
SCORE 100 Install 100amp service and rewire thru -out as per 2008 nec Client: Willner Adam Willner Cheri | Permit type: Electrical permit | Permit status: Completed | Completion date: September 7, 2011 | Permit id: 327567 | |||||
SCORE 100 Install new bath room 3 piece on 3rd floor,replace existing drain pipe stacks,relocate existing piping on 2nd floor to 2nd floor bath room Client: Willner Adam Willner Cheri | Permit type: Plumbing permit | Permit status: Completed | Completion date: October 12, 2011 | Permit id: 328641 | |||||
SCORE 58 New front facade to be attached to new framing in the front to new framing and sheathing, wall ties as per code and properly sized and sp. Aced weep holes and lintels as per code. The job also includes the replacement of doors and windows, which must meet the requirements of the 2009 energy code and the framing of a new bathroom on the 3rd floor. All mechanical work must be done per separate permit. Client: Willner Adam Willner Cheri | Permit type: Alteration permit | Permit status: Completed | Completion date: October 12, 2011 | Permit id: 310193 |