Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Electrical permit Client: First Me Church Of Gtn | Permit status: Expired | Permit id: 518291 | |||||
Electrical permit Client: First Me Church Of Gtn | Permit status: Completed | Permit id: 183269 | |||||
Alteration permit Client: First Me Church Of Gtn | Permit status: Completed | Permit id: 125276 | |||||
Alteration permit Client: First Me Church Of Gtn | Permit status: Completed | Permit id: 335452 | |||||
Administrative permit Client: First Me Church Of Gtn | Permit status: Completed | Permit id: 195236 | |||||
Alteration permit Client: First Me Church Of Gtn | Permit status: Completed | Permit id: 502517 | |||||
Alteration permit Client: First Me Church Of Gtn | Permit status: Completed | Permit id: 426349 | |||||
Administrative permit Client: First Me Church Of Gtn | Permit status: Completed | Permit id: 50245 | |||||
Permit for the extension to the second floor of a non-accessory daycare on the first floor and for the erection of four (4) singlefaced freestanding signs accessory to the daycare on the same lot with an existing church and non-accessory offices. Size and location as shown in the application. Client: First Me Church Of Gtn | Applicant: William Ewing | Permit type: Appeal | Permit status: Granted | Completion date: September 25, 2012 | Permit id: 18714 | |||||
Alteration permit Client: First Me Church Of Gtn | Permit status: Completed | Permit id: 426349 | |||||
Electrical permit Client: First Me Church Of Gtn | Permit status: Expired | Permit id: 518291 | |||||
Electrical permit Client: First Me Church Of Gtn | Permit status: Completed | Permit id: 183269 | |||||
Administrative permit Client: First Me Church Of Gtn | Permit status: Completed | Permit id: 50245 | |||||
Alteration permit Client: First Me Church Of Gtn | Permit status: Completed | Permit id: 502517 | |||||
Alteration permit Client: First Me Church Of Gtn | Permit status: Completed | Permit id: 125276 | |||||
Administrative permit Client: First Me Church Of Gtn | Permit status: Completed | Permit id: 195236 | |||||
Alteration permit Client: First Me Church Of Gtn | Permit status: Completed | Permit id: 335452 | |||||
Permit for the extension to the second floor of a non-accessory daycare on the first floor and for the erection of four (4) singlefaced freestanding signs accessory to the daycare on the same lot with an existing church and non-accessory offices. Size and location as shown in the application. Client: First Me Church Of Gtn | Applicant: William Ewing | Permit type: Appeal | Permit status: Granted | Completion date: September 25, 2012 | Permit id: 18714 | |||||
Interior alteration as per plans. Improvements to rooms 1 and 106. Client: First Me Church Of Gtn | Permit type: Alteration permit | Permit status: Completed | Completion date: October 27, 2008 | Permit id: 125276 | |||||
SCORE 99 For the installation of an accessible lift system to provide an accessible route from the first to second floor. Alterations include creating floor openings, providing blocking and floor slab alterations. Separate permit required for the electrical system. Client: First Me Church Of Gtn | Permit type: Alteration permit | Permit status: Completed | Completion date: February 27, 2015 | Permit id: 502517 | |||||
SCORE 100 Installing separate 2 amp service to front building, 2 amp outdoor disconnect with a 2 amp main feeding an existing circuit panel, wire as per 2005 nec (this is a separate building, (north dist) Client: First Me Church Of Gtn | Permit type: Electrical permit | Permit status: Completed | Completion date: January 21, 2009 | Permit id: 183269 | |||||
SCORE 93 Replace 100amp feeder from main disconnect in boiler room to sub panel in gym, running new circuits from panel in gym to new elevator location on first floor for elevator power and lighting as per 2008 nec (north district) Client: First Me Church Of Gtn | Permit type: Electrical permit | Permit status: Expired | Completion date: May 22, 2014 | Permit id: 518291 | |||||
Preliminary plan review renovation to education bldg. Client: First Me Church Of Gtn | Permit type: Administrative permit | Permit status: Completed | Completion date: July 7, 2008 | Permit id: 50245 | |||||
SCORE 99 Roof replacement for porch roofs. Remove old rubber roof. Install new fire proof base sheathing. Install new sbs glue down rubber. Install new flashing. No work to green tree tavern building. Work to be done according to historical approval. Client: First Me Church Of Gtn | Permit type: Alteration permit | Permit status: Completed | Completion date: June 4, 2014 | Permit id: 426349 | |||||
SCORE 98 Removal and replacement of mortor joints at bell tower of historically registered church. Client: First Me Church Of Gtn | Permit type: Alteration permit | Permit status: Completed | Completion date: August 13, 2013 | Permit id: 335452 | |||||
Certificate of occupancy memo for daycare center that complies with the exit requirements as noted on the memo. Client: First Me Church Of Gtn | Permit type: Administrative permit | Permit status: Completed | Completion date: August 3, 2013 | Permit id: 195236 |